BuildingPermitCost

Building Permit Fees in Peoria, IL (2026)

Peoria prices building permits with a fee table based on project value (a flat $0.00 below $5,000). Enter your project to see the exact math.

  • Official city schedule
  • Effective Sep 23, 2020
  • Verified Nov 5, 2026
Minimum fee
—
Plan review
None
$75k addition
$600

Permit fee calculator

Peoria schedule, eff. Sep 23, 2020
Project type
Estimated permit fees $600.00
  1. 1. Building permit fee
    $0.00 for the first $0.00 + $8.00 × 75 per $1,000.00 over
    $600.00

May also apply (not in the total)

  • Work started without a permit (triple charge)
    When: work started without a permit
    $1,200.00

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$200.00
$200.00 building permit
Room addition
$75,000 value, addition 400 sq ft
$600.00
$600.00 building permit
New single-family home
$350,000 value, new single-family 2,400 sq ft
$2,800.00
$2,800.00 building permit

How Peoria calculates your permit fee

The city charges a building permit fee using a fee table based on project value (a flat $0.00 below $5,000).

The fee table

Residential, all permit types

Project valueFee
Over $0$8.00 per $1,000 or fraction

Commercial, all permit types

Project valueFee
$1 – $5,000,000$9.00 per $1,000 or fraction
Over $5,000,000$45,000.00 for the first $5,000,000 + $2.00 per additional $1,000 or fraction

What counts as project value

Your contract or bid price. Fees are a multiple of the construction cost ('Construction Cost x .008'), with the cost of construction rounded up to the next $1,000. The schedule does not say how construction cost is verified.

Worked example: a $350,000 new home

  1. Building permit fee: $0.00 for the first $0.00 + $8.00 × 350 per $1,000.00 over = $2,800.00
  2. Total before trade permits: $2,800.00.

Fees people miss

May also apply (not in the totals above)

  • Work started without a permit (triple charge): when work started without a permit; $400.00 on the standard projects.
FeeAmount
Work started without a permit on a no-cost permit jobWhen: work started without a permit on a job under $5,000 ticket

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to City of Peoria Community Development, Permitting.
  3. Pay the permit and plan review fees when invoiced.

How Peoria compares

A $25,000 remodel costs $200.00 in Peoria: 47% below the national median of $380.00, and the 4th lowest of 10 places we cover in Illinois (state median $250.00).

A $75,000 addition costs $600.00 in Peoria: 27% below the national median of $820.58, and the 5th lowest of 9 places we cover in Illinois (state median $600.00).

A $350,000 new home costs $2,800.00 in Peoria: about the same as the national median of $2,918.63, and the 4th highest of 9 places we cover in Illinois (state median $2,460.00).

Same standard projects everywhere, including plan review and required surcharges. All Illinois places · Compare side by side

Peoria permit fee FAQ

How much is a building permit in Peoria, IL?

A $25,000 remodel: $200.00. A $75,000 addition: $600.00. A $350,000 new single-family: $2,800.00. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Peoria permit fee?

Peoria lists no separate plan review fee for these projects.

How does Peoria determine project value?

Your contract or bid price. Fees are a multiple of the construction cost ('Construction Cost x .008'), with the cost of construction rounded up to the next $1,000. The schedule does not say how construction cost is verified.

When did these Peoria fees take effect?

The schedule is effective Sep 23, 2020 (“Effective 9/23/2020”). We last checked it against the official source on Nov 5, 2026.