BuildingPermitCost

Building Permit Fees in Aurora, IL (2026)

Aurora prices building permits with 0.5% of project value, with a $1,817.00 minimum, then charges plan review at 15% of the permit fee (minimum $278.00). Enter your project to see the exact math.

  • Official city schedule
  • Effective Jan 1, 2026
  • Verified Nov 4, 2026
Minimum fee
$1,817.00
Plan review
15%
$75k addition
$2,210

Permit fee calculator

Aurora schedule, eff. Jan 1, 2026
Project type
Estimated permit fees $2,210.00
  1. 1. Building permit fee
    0.5% of $75,000.00 → minimum $1,817.00
    $1,817.00
  2. 2. Plan review fee
    15% of $1,817.00 → minimum $278.00
    $278.00
  3. 3. Certificate of occupancy (residential new/addition)
    flat fee
    $115.00

May also apply (not in the total)

  • Engineering plan review & site inspection
    When: to new construction and additions that need engineering plan review and site inspection (whether small additions pay is unclear)
    $300.00

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$741.75
$625.00 building permit + $93.75 plan review + $23.00 certificate of completion (residential remodeling)
Room addition
$75,000 value, addition 400 sq ft
$2,210.00
$1,817.00 building permit + $278.00 plan review + $115.00 certificate of occupancy (residential new/addition)
New single-family home
$350,000 value, new single-family 2,400 sq ft
$2,460.00
$1,817.00 building permit + $278.00 plan review + $115.00 certificate of occupancy (residential new/addition) + $250.00 fire impact fee, newly established owner-occupied dwelling unit

How Aurora calculates your permit fee

The city charges a building permit fee using 0.5% of project value, with a $1,817.00 minimum. Plan review is a separate charge: 15% of the permit fee (minimum $278.00).

The fee table

Residential new construction / addition (Permit Inspection Fee)

0.5% of project value, with a $1,817.00 minimum.

Residential remodeling, single family 2-4 trades (2-trade minimum stored)

2.5% of project value, with a $164.00 minimum.

Commercial new construction / addition

0.5% of project value, with a $3,800.00 minimum.

Added to every matching permit

  • Certificate of occupancy (residential new/addition): a flat $115.00 (Residential · new construction, additions)
  • Certificate of completion (residential remodeling): a flat $23.00 (Residential · remodels and alterations)
  • Certificate of occupancy (commercial new/addition): a flat $232.00 (Commercial · new construction, additions)
  • Fire impact fee, newly established owner-occupied dwelling unit: a flat $250.00 (Residential · new construction)

What counts as project value

Higher of your bid or the valuation table. New structures and additions: greater of the contractor's estimate or ICC BVD $/sf x Location Factor x gross sq ft. The residential worksheet shows living space sq ft x $170.80 (BVD) x 1.15 (Means location factor), garage/unfinished basement at $31.50/sq ft. Remodel/repair: greater of contractor's estimate or fair market value of materials and labor as determined by the Code Official.

Worked example: a $350,000 new home

  1. Building permit fee: 0.5% of $350,000.00 → minimum $1,817.00 = $1,817.00
  2. Plan review fee: 15% of $1,817.00 → minimum $278.00 = $278.00
  3. Certificate of occupancy (residential new/addition): flat fee = $115.00
  4. Fire impact fee, newly established owner-occupied dwelling unit: flat fee = $250.00
  5. Total before trade permits: $2,460.00.

Fees people miss

May also apply (not in the totals above)

  • Engineering plan review & site inspection: when to new construction and additions that need engineering plan review and site inspection (whether small additions pay is unclear); $300.00 on the standard projects.
FeeAmount
Water meter accessories, 3/4 inchWhen: new water service $429.20 each
Water connection fee, 3/4 inch meterWhen: new water service $1,265.00 each
Sanitary sewer connection feeWhen: new sewer connection $250.00 each
Fox Metro inspection feeWhen: new sewer connection $35.00 each
Digital archiving feeWhen: large plans (over 6 pages) provided electronically $15.00 each
Permit reinspection feeWhen: reinspection $109.00 per trade
Permit penalty inspection feeWhen: penalty inspection $200.00 per trade
Permit extension feeWhen: extension requested $41.00 10% of PIF or $41, whichever is greater
Plan review expeditingWhen: applicant option 3x standard plan review fee
Land cash / school & park contributionsWhen: new dwelling units; set through zoning review varies

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to Development Services Department, Division of Building and Permits.
  3. Pay the permit and plan review fees when invoiced.
  4. Questions: (630) 256-3130 · 77 S. Broadway, Aurora, IL 60505

How Aurora compares

A $25,000 remodel costs $741.75 in Aurora: about twice the national median of $380.00, and the 2nd highest of 10 places we cover in Illinois (state median $250.00).

A $75,000 addition costs $2,210.00 in Aurora: about 2.7 times the national median of $820.58, and the highest of 9 places we cover in Illinois (state median $600.00).

A $350,000 new home costs $2,460.00 in Aurora: 16% below the national median of $2,918.63, and the 5th lowest of 9 places we cover in Illinois (state median $2,460.00).

Same standard projects everywhere, including plan review and required surcharges. All Illinois places · Compare side by side

Aurora permit fee FAQ

How much is a building permit in Aurora, IL?

A $25,000 remodel: $741.75. A $75,000 addition: $2,210.00. A $350,000 new single-family: $2,460.00. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Aurora permit fee?

No. Plan review is charged separately at 15% of the permit fee (minimum $278.00).

How does Aurora determine project value?

Higher of your bid or the valuation table. New structures and additions: greater of the contractor's estimate or ICC BVD $/sf x Location Factor x gross sq ft. The residential worksheet shows living space sq ft x $170.80 (BVD) x 1.15 (Means location factor), garage/unfinished basement at $31.50/sq ft. Remodel/repair: greater of contractor's estimate or fair market value of materials and labor as determined by the Code Official.

When did these Aurora fees take effect?

The schedule is effective Jan 1, 2026 (“2026 adjusted fee schedule, effective for permits applied for after Jan 01st 2026”). We last checked it against the official source on Nov 4, 2026.