How Aurora calculates your permit fee
The city charges a building permit fee using 0.5% of project value, with a $1,817.00 minimum. Plan review is a separate charge: 15% of the permit fee (minimum $278.00).
The fee table
Residential new construction / addition (Permit Inspection Fee)
0.5% of project value, with a $1,817.00 minimum.
Residential remodeling, single family 2-4 trades (2-trade minimum stored)
2.5% of project value, with a $164.00 minimum.
Commercial new construction / addition
0.5% of project value, with a $3,800.00 minimum.
Added to every matching permit
- Certificate of occupancy (residential new/addition): a flat $115.00 (Residential · new construction, additions)
- Certificate of completion (residential remodeling): a flat $23.00 (Residential · remodels and alterations)
- Certificate of occupancy (commercial new/addition): a flat $232.00 (Commercial · new construction, additions)
- Fire impact fee, newly established owner-occupied dwelling unit: a flat $250.00 (Residential · new construction)
What counts as project value
Higher of your bid or the valuation table. New structures and additions: greater of the contractor's estimate or ICC BVD $/sf x Location Factor x gross sq ft. The residential worksheet shows living space sq ft x $170.80 (BVD) x 1.15 (Means location factor), garage/unfinished basement at $31.50/sq ft. Remodel/repair: greater of contractor's estimate or fair market value of materials and labor as determined by the Code Official.
Worked example: a $350,000 new home
- Building permit fee: 0.5% of $350,000.00 → minimum $1,817.00 = $1,817.00
- Plan review fee: 15% of $1,817.00 → minimum $278.00 = $278.00
- Certificate of occupancy (residential new/addition): flat fee = $115.00
- Fire impact fee, newly established owner-occupied dwelling unit: flat fee = $250.00
- Total before trade permits: $2,460.00.
Fees people miss
May also apply (not in the totals above)
- Engineering plan review & site inspection: when to new construction and additions that need engineering plan review and site inspection (whether small additions pay is unclear); $300.00 on the standard projects.
| Fee | Amount |
|---|---|
| Water meter accessories, 3/4 inchWhen: new water service | $429.20 each |
| Water connection fee, 3/4 inch meterWhen: new water service | $1,265.00 each |
| Sanitary sewer connection feeWhen: new sewer connection | $250.00 each |
| Fox Metro inspection feeWhen: new sewer connection | $35.00 each |
| Digital archiving feeWhen: large plans (over 6 pages) provided electronically | $15.00 each |
| Permit reinspection feeWhen: reinspection | $109.00 per trade |
| Permit penalty inspection feeWhen: penalty inspection | $200.00 per trade |
| Permit extension feeWhen: extension requested | $41.00 10% of PIF or $41, whichever is greater |
| Plan review expeditingWhen: applicant option | 3x standard plan review fee |
| Land cash / school & park contributionsWhen: new dwelling units; set through zoning review | varies |
How to apply
- Gather your plans and your project's total value.
- Submit to Development Services Department, Division of Building and Permits.
- Pay the permit and plan review fees when invoiced.
- Questions: (630) 256-3130 · 77 S. Broadway, Aurora, IL 60505