BuildingPermitCost

Building Permit Fees in Orange County, FL (2026)

Orange County prices building permits with a fee table based on project value, with a $26.00 minimum. Enter your project to see the exact math.

  • Official county schedule
  • Effective not stated
  • Verified Nov 4, 2026
Minimum fee
$26.00
Plan review
None
$75k addition
$330

Permit fee calculator

Orange County schedule
Project type
Estimated permit fees $330.05
  1. 1. Building permit fee
    $26.00 for the first $1,000.00 + $4.00 × 74 per $1,000.00 over
    $322.00
  2. 2. Florida state surcharges (F.S. 468.631 and 553.721)
    2.5% of $322.00
    $8.05

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$159.00
$122.00 building permit + $33.00 zoning residential plans review, one and two family other than new construction + $4.00 florida state surcharges (f.s. 468.631 and 553.721)
Room addition
$75,000 value, addition 400 sq ft
$330.05
$322.00 building permit + $8.05 florida state surcharges (f.s. 468.631 and 553.721)
New single-family home
$350,000 value, new single-family 2,400 sq ft
$1,492.55
$1,422.00 building permit + $35.00 zoning residential plans review, one and two family new construction + $35.55 florida state surcharges (f.s. 468.631 and 553.721)

How Orange County calculates your permit fee

The county charges a building permit fee using a fee table based on project value, with a $26.00 minimum.

The fee table

One and two family dwelling

Project valueFee
$1 – $1,000$26.00
Over $1,000$26.00 for the first $1,000 + $4.00 per additional $1,000 or fraction

Commercial/multifamily new construction

Project valueFee
$1 – $1,000$26.00
Over $1,000$26.00 for the first $1,000 + $5.00 per additional $1,000 or fraction

Commercial/multifamily other than new construction

Project valueFee
$1 – $1,000$26.00
Over $1,000$26.00 for the first $1,000 + $5.00 per additional $1,000 or fraction

Added to every matching permit

  • Zoning residential plans review, one and two family new construction: a flat $35.00 (Residential · new construction)
  • Zoning residential plans review, one and two family other than new construction: a flat $33.00 (Residential · remodels and alterations)

Surcharges

  • Florida state surcharges (F.S. 468.631 and 553.721): 2.5% of the permit fee, minimum $4.00

What counts as project value

Higher of your bid or the valuation table. Valuation = floor area x the county's minimum valuation table (cost per sq ft by occupancy and construction type), unless the contract valuation is greater. R-3 one/two-family: VB $97, VA $104, IV $113 per sq ft; detached garages use U (VB $37); unfinished basements $15/sq ft; shell buildings deduct 20%.

Worked example: a $350,000 new home

  1. Building permit fee: $26.00 for the first $1,000.00 + $4.00 × 349 per $1,000.00 over = $1,422.00
  2. Zoning residential plans review, one and two family new construction: flat fee = $35.00
  3. Florida state surcharges (F.S. 468.631 and 553.721): 2.5% of $1,422.00 = $35.55
  4. Total before trade permits: $1,492.55.

Fees people miss

FeeAmount
Residential re-roofWhen: re-roof permits only $27.00 first $1,000 of valuation, plus $5 per additional $1,000 or fraction
Demolition permitWhen: demolition only $7.00 per 25,000 cubic feet or fraction, minimum $26, maximum $412
Re-inspectionWhen: failed/missed inspection $76.00 each
Private provider reductionWhen: private provider used 75% of permit fee (plan review or inspections by private provider), 50% (both)
Permit amendmentWhen: amendments only $28.00 each
Early start permitWhen: optional $109.00 each
Accessory structures and uses to one and two family dwellings (building permit)When: accessory structures only (replaces the dwelling formula) $27.00 first $1,000 of valuation, plus $4 per additional $1,000 or fraction

Will fees go up?

The schedule provides for a 3% adjustment each October 1. Fees may increase each October 1 by the lesser of 3% or CPI-U; values here are as printed in the FY 2026-2027 directory.

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to Division of Building Safety.
  3. Pay the permit and plan review fees when invoiced.
  4. Questions: (407) 836-5550

How Orange County compares

A $25,000 remodel costs $159.00 in Orange County: 58% below the national median of $380.00, and the 2nd lowest of 19 places we cover in Florida (state median $348.08).

A $75,000 addition costs $330.05 in Orange County: 60% below the national median of $820.58, and the 5th lowest of 17 places we cover in Florida (state median $500.09).

A $350,000 new home costs $1,492.55 in Orange County: 49% below the national median of $2,918.63, and the 5th lowest of 19 places we cover in Florida (state median $2,400.00).

Cities in Orange County with their own fee schedule on this site: Orlando. Inside those cities, check whether the city or the county issues your permit.

Same standard projects everywhere, including plan review and required surcharges. All Florida places · Compare side by side

Orange County permit fee FAQ

How much is a building permit in Orange County, FL?

A $25,000 remodel: $159.00. A $75,000 addition: $330.05. A $350,000 new single-family: $1,492.55. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Orange County permit fee?

Orange County lists no separate plan review fee for these projects.

How does Orange County determine project value?

Higher of your bid or the valuation table. Valuation = floor area x the county's minimum valuation table (cost per sq ft by occupancy and construction type), unless the contract valuation is greater. R-3 one/two-family: VB $97, VA $104, IV $113 per sq ft; detached garages use U (VB $37); unfinished basements $15/sq ft; shell buildings deduct 20%.

When did these Orange County fees take effect?

The schedule does not state an effective date. We last checked it against the official source on Nov 4, 2026.