Building Permit Fees in Lakeland, FL (2026)

Lakeland prices building permits with a fee table based on project value, with a $40.50 minimum, then charges plan review at 25% of the permit fee (minimum $31.50). Enter your project to see the exact math.

  • Official city schedule
  • Effective not stated
  • Verified Nov 5, 2026
Minimum fee
$40.50
Plan review
25%
$75k addition
$486

Permit fee calculator

Lakeland schedule
Project type
Estimated permit fees $486.17
  1. 1. Building permit fee
    $72.00 for the first $10,000.00 + $4.73 × 65 per $1,000.00 over
    $379.45
  2. 2. Plan review fee
    25% of $379.45
    $94.86
  3. 3. Florida state surcharges (2.5% of building permit fee)
    2.5% of $379.45
    $9.49
  4. 4. Florida state surcharges (2.5% of plans review fee)
    2.5% of $94.86
    $2.37

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$183.15
$142.95 building permit + $35.74 plan review + $3.57 florida state surcharges (2.5% of building permit fee) + $0.89 florida state surcharges (2.5% of plans review fee)
Room addition
$75,000 value, addition 400 sq ft
$486.17
$379.45 building permit + $94.86 plan review + $9.49 florida state surcharges (2.5% of building permit fee) + $2.37 florida state surcharges (2.5% of plans review fee)
New single-family home
$350,000 value, new single-family 2,400 sq ft
$1,855.65
$1,432.70 building permit + $358.18 plan review + $20.00 zoning compliance determination (new construction) + $35.82 florida state surcharges (2.5% of building permit fee) + $8.95 florida state surcharges (2.5% of plans review fee)

How Lakeland calculates your permit fee

The city charges a building permit fee using a fee table based on project value, with a $40.50 minimum. Plan review is a separate charge: 25% of the permit fee (minimum $31.50). Electrical, plumbing and mechanical work gets its own permits.

The fee table

Project valueFee
$1 – $1,000$40.50
$1,001 – $10,000$72.00
$10,001 – $100,000$72.00 for the first $10,000 + $4.73 per additional $1,000 or fraction
$100,001 – $500,000$497.70 for the first $100,000 + $3.74 per additional $1,000 or fraction
$500,001 – $1,000,000$1,993.70 for the first $500,000 + $1.58 per additional $1,000 or fraction
Over $1,000,000$2,783.70 for the first $1,000,000 + $1.08 per additional $1,000 or fraction

Added to every matching permit

  • Zoning compliance determination (new construction): a flat $20.00 (new construction)

Surcharges

  • Florida state surcharges (2.5% of building permit fee): 2.5% of the permit fee
  • Florida state surcharges (2.5% of plans review fee): 2.5% of the plan review fee

What counts as project value

Not stated in the schedule. Building permit fees are 'based on valuation'; the page does not say how valuation is determined.

Worked example: a $350,000 new home

  1. Building permit fee: $497.70 for the first $100,000.00 + $3.74 × 250 per $1,000.00 over = $1,432.70
  2. Plan review fee: 25% of $1,432.70 = $358.18
  3. Zoning compliance determination (new construction): flat fee = $20.00
  4. Florida state surcharges (2.5% of building permit fee): 2.5% of $1,432.70 = $35.82
  5. Florida state surcharges (2.5% of plans review fee): 2.5% of $358.18 = $8.95
  6. Total before trade permits: $1,855.65.

Fees people miss

FeeAmount
Penalty: work commenced without permit (first violation)When: work commenced without a permit $150.00 each
Re-inspection feeWhen: re-inspection needed $31.50 each
Plan revisionWhen: plans revised $31.50 per trade (residential); $45 commercial
Notice of CommencementWhen: notice of commencement processed by the city $5.00 each
Permit extensionWhen: permit extension requested $40.00 each ($50 to reopen and extend)
Private provider reduced feesWhen: owner uses a private provider under F.S. 553.791 20% of permit fee or $72, whichever is greater (inspections)

Trade permits are separate. Electrical: Residential: new single-family/duplex/townhouse $81; renovation, addition or alteration $72; repair $40.50. Commercial new/addition/renovation: $72 or $0.027/sq ft, whichever is greater. Mechanical: HVAC new single-family/duplex/townhouse $72; HVAC work in existing single-family $72. Plumbing: 1-3 fixture waste connections $72, each additional fixture $4.50; sewer connection $31.50. Gas: 1-3 outlets $72, each additional $4.50.

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to Building Inspection, City of Lakeland online through iMS / ePlan.
  3. Pay the permit and plan review fees when invoiced.
  4. Questions: 863.834.6012 · 228 S. Massachusetts Ave., Lakeland, FL 33801

How Lakeland compares

A $25,000 remodel costs $183.15 in Lakeland: 52% below the national median of $380.00, and the 4th lowest of 19 places we cover in Florida (state median $348.08).

A $75,000 addition costs $486.17 in Lakeland: 41% below the national median of $820.58, and the 8th lowest of 17 places we cover in Florida (state median $500.09).

A $350,000 new home costs $1,855.65 in Lakeland: 36% below the national median of $2,918.63, and the 7th lowest of 19 places we cover in Florida (state median $2,400.00).

Same standard projects everywhere, including plan review and required surcharges. All Florida places · Compare side by side

Lakeland permit fee FAQ

How much is a building permit in Lakeland, FL?

A $25,000 remodel: $183.15. A $75,000 addition: $486.17. A $350,000 new single-family: $1,855.65. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Lakeland permit fee?

No. Plan review is charged separately at 25% of the permit fee (minimum $31.50).

How does Lakeland determine project value?

Not stated in the schedule. Building permit fees are 'based on valuation'; the page does not say how valuation is determined.

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Electrical: Residential: new single-family/duplex/townhouse $81; renovation, addition or alteration $72; repair $40.50. Commercial new/addition/renovation: $72 or $0.027/sq ft, whichever is greater. Mechanical: HVAC new single-family/duplex/townhouse $72; HVAC work in existing single-family $72. Plumbing: 1-3 fixture waste connections $72, each additional fixture $4.50; sewer connection $31.50. Gas: 1-3 outlets $72, each additional $4.50.

When did these Lakeland fees take effect?

The schedule does not state an effective date. We last checked it against the official source on Nov 5, 2026.