BuildingPermitCost

Building Permit Fees in Volusia County, FL (2026)

Volusia County prices building permits with a fee table based on project value, with a $60.34 minimum, then charges plan review at its own fee table. Enter your project to see the exact math.

  • Official county schedule
  • Effective Oct 1, 2026
  • Verified Nov 5, 2026
Minimum fee
$60.34
Plan review
Separate
$75k addition
$677

Permit fee calculator

Volusia County schedule, eff. Oct 1, 2026
Project type
Estimated permit fees $676.66
  1. 1. Building permit fee
    $366.10 for the first $40,000.00 + $6.00 × 35 per $1,000.00 over
    $576.10
  2. 2. Plan review fee
    table value for $75,000.00: $100.56
    $100.56

May also apply (not in the total)

  • Work without a permit
    When: work started without a required permit (double permit fee)
    $576.10

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$295.77
$245.49 building permit + $50.28 plan review
Room addition
$75,000 value, addition 400 sq ft
$676.66
$576.10 building permit + $100.56 plan review
New single-family home
$350,000 value, new single-family 2,400 sq ft
$1,972.42
$1,721.15 building permit + $251.27 plan review

How Volusia County calculates your permit fee

The county charges a building permit fee using a fee table based on project value, with a $60.34 minimum. Plan review is a separate charge: its own fee table. Electrical, plumbing and mechanical work gets its own permits.

The fee table

Project valueFee
$1 – $2,000$60.34
$2,001 – $40,000$60.34 for the first $2,000 + $8.05 per additional $1,000
$40,001 – $100,000$366.10 for the first $40,000 + $6.00 per additional $1,000
$100,001 – $500,000$726.15 for the first $100,000 + $3.98 per additional $1,000
Over $500,000$2,319.10 for the first $500,000 + $1.96 per additional $1,000

What counts as project value

ICC Building Valuation Data table. "Value of construction for permits will be determined by the most recent publishing of the International Code Council estimates per square foot, including the regional modifier, of all areas under roof according to the type of construction and use."

Worked example: a $350,000 new home

  1. Building permit fee: $726.15 for the first $100,000.00 + $3.98 × 250 per $1,000.00 over = $1,721.15
  2. Plan review fee: $130.75 for the first $150,000.00 + $30.13 × 4 per $50,000.00 over = $251.27
  3. Total before trade permits: $1,972.42.

Fees people miss

May also apply (not in the totals above)

  • Work without a permit: when work started without a required permit (double permit fee); $245.49 on the standard projects.
FeeAmount
Application fee, one and two family residencesWhen: credited toward the permit fee; only a net cost if the permit is not obtained $201.29 each
Application fee, commercial buildingWhen: credited toward the permit fee; only a net cost if the permit is not obtained $402.31 each
Application fee, all other miscellaneous applicationsWhen: credited toward the permit fee; only a net cost if the permit is not obtained $60.34 each
Reinspection feeWhen: failed or extra inspection $62.14 each
Certificate of Occupancy $6.00 each
Pre-inspectionWhen: pre-inspection requested $58.58 each
House moving feeWhen: moving a house $201.29 each
Permit reinstatement, extension, and closeout feeWhen: reinstating, extending or closing out a permit $25.00 each
Stormwater utility fee (prorated, new construction)When: new buildings in unincorporated areas, before Certificate of Occupancy prorated by month
Residential solid waste fee (prorated, new homes)When: new residences in unincorporated areas prorated by month
Impact feesWhen: new construction, expansion or change of use

Trade permits are separate. Electrical: Minimum $60.34; new/increased service $0.78 per ampere increase (single phase); alterations $10.04 per circuit for first ten, $1.96 each additional. Plumbing: Minimum $60.34 plus $3.98 per fixture/appliance connected. Mechanical: Valuation table: $60.34 up to $1,000; $60.34 + $8.05 per additional thousand to $25,000; $253.45 + $5.16 per additional thousand above $25,000.

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to Volusia County Building and Code Administration through Connect Live.
  3. Pay the permit and plan review fees when invoiced.
  4. Questions: Permit Center, 123 W. Indiana Ave., Room 203, DeLand, FL

How Volusia County compares

A $25,000 remodel costs $295.77 in Volusia County: 22% below the national median of $380.00, and the 8th lowest of 19 places we cover in Florida (state median $348.08).

A $75,000 addition costs $676.66 in Volusia County: 18% below the national median of $820.58, and the 8th highest of 17 places we cover in Florida (state median $500.09).

A $350,000 new home costs $1,972.42 in Volusia County: 32% below the national median of $2,918.63, and the 8th lowest of 19 places we cover in Florida (state median $2,400.00).

Same standard projects everywhere, including plan review and required surcharges. All Florida places · Compare side by side

Volusia County permit fee FAQ

How much is a building permit in Volusia County, FL?

A $25,000 remodel: $295.77. A $75,000 addition: $676.66. A $350,000 new single-family: $1,972.42. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Volusia County permit fee?

No. Plan review is charged separately at its own fee table.

How does Volusia County determine project value?

ICC Building Valuation Data table. "Value of construction for permits will be determined by the most recent publishing of the International Code Council estimates per square foot, including the regional modifier, of all areas under roof according to the type of construction and use."

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Electrical: Minimum $60.34; new/increased service $0.78 per ampere increase (single phase); alterations $10.04 per circuit for first ten, $1.96 each additional. Plumbing: Minimum $60.34 plus $3.98 per fixture/appliance connected. Mechanical: Valuation table: $60.34 up to $1,000; $60.34 + $8.05 per additional thousand to $25,000; $253.45 + $5.16 per additional thousand above $25,000.

When did these Volusia County fees take effect?

The schedule is effective Oct 1, 2026 (“Resolution 2005-191 fees, revised October 1, 2026 (+3.5% CPI)”). We last checked it against the official source on Nov 5, 2026.