BuildingPermitCost

Building Permit Fees in Wake County, NC (2026)

Wake County prices building permits with $0.25 per square foot, plus a $75.00 application fee. Enter your project to see the exact math.

  • Official county schedule
  • Effective not stated
  • Verified Nov 4, 2026
Minimum fee
—
Plan review
None
$75k addition
$175

Permit fee calculator

Wake County schedule
Project type
Estimated permit fees $175.00
  1. 1. Building permit fee
    400 sq ft × $0.25
    $100.00
  2. 2. Application fee
    fixed
    $75.00

May also apply (not in the total)

  • Homeowner Recovery Fee
    When: licensed general contractor permit for a single-family dwelling
    $10.00

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$150.00
$75.00 building permit + $75.00 application
Room addition
$75,000 value, addition 400 sq ft
$175.00
$100.00 building permit + $75.00 application
New single-family home
$350,000 value, new single-family 2,400 sq ft
$675.00
$600.00 building permit + $75.00 application

How Wake County calculates your permit fee

The county charges a building permit fee using $0.25 per square foot, plus a $75.00 application fee. Electrical, plumbing and mechanical work gets its own permits.

The fee table

New one- and two-family dwellings

$0.25 per square foot, plus a $75.00 application fee.

Residential additions and accessory structures

$0.25 per square foot, plus a $75.00 application fee.

Residential alterations and repairs

$0.25 per square foot, plus a $75.00 application fee.

Non-residential and multi-family, per trade

Project valueFee
$1 – $1,000,000$75.00 to $6,314.00, read from the table (10 steps)
Over $1,000,000$6,314.00 for the first $1,000,000 + $1,500.00 per additional $1,000,000 or fraction
Show the full table (11 rows)
$1 – $1,500$75.00
$1,502 – $2,500$138.00
$2,502 – $25,000$204.00
$25,002 – $50,000$407.00
$50,002 – $100,000$815.00
$100,002 – $200,000$1,629.00
$200,002 – $350,000$2,852.00
$350,002 – $500,000$3,768.00
$500,002 – $750,000$5,042.00
$750,002 – $1,000,000$6,314.00
Over $1,000,000$6,314.00 for the first $1,000,000 + $1,500.00 per additional $1,000,000 or fraction

What counts as project value

Floor area (square feet). Residential fees are $75 plus $0.25 per square foot of finished gross floor area (no deduction for garage, corridors, stairs, closets); alterations use the gross floor area being altered. Non-residential (and multi-family) fees use project cost in a fixed-fee table, charged per required trade.

Worked example: a $350,000 new home

  1. Building permit fee: 2,400 sq ft × $0.25 = $600.00
  2. Application fee: fixed = $75.00
  3. Total before trade permits: $675.00.

Fees people miss

May also apply (not in the totals above)

  • Homeowner Recovery Fee: when licensed general contractor permit for a single-family dwelling; $10.00 on the standard projects.
FeeAmount
1st re-inspectionWhen: failed inspection $100.00 each
2nd re-inspectionWhen: failed inspection $200.00 each
3rd re-inspectionWhen: failed inspection $300.00 each
4th and later re-inspectionWhen: failed inspection $400.00 each
Max violations re-inspection feeWhen: 15+ violations at re-inspection $150.00 each
Amend permit & revised site plan feeWhen: scope change, revised plans or site plan, bedroom count change $60.00 each

Trade permits are separate. Electrical: Residential trade permit (electrical, mechanical and plumbing, any number of trades): single $75 fee including electrical pole. Commercial: per-trade project-cost table (see commercial variant). Plumbing: Included in the single $75 residential trade permit fee. Mechanical: Included in the single $75 residential trade permit fee.

How to apply

  1. Gather your plans and your project's total value and floor area.
  2. Submit to Wake County Permits and Inspections (Planning and Development Services).
  3. Pay the permit and plan review fees when invoiced.

How Wake County compares

A $25,000 remodel costs $150.00 in Wake County: 61% below the national median of $380.00, and the 3rd lowest of 7 places we cover in North Carolina (state median $214.20).

A $75,000 addition costs $175.00 in Wake County: 79% below the national median of $820.58, and the 2nd lowest of 6 places we cover in North Carolina (state median $218.40).

A $350,000 new home costs $675.00 in Wake County: 77% below the national median of $2,918.63, and the lowest of 7 places we cover in North Carolina (state median $1,018.00).

Cities in Wake County with their own fee schedule on this site: Apex. Inside those cities, check whether the city or the county issues your permit.

Same standard projects everywhere, including plan review and required surcharges. All North Carolina places · Compare side by side

Wake County permit fee FAQ

How much is a building permit in Wake County, NC?

A $25,000 remodel: $150.00. A $75,000 addition: $175.00. A $350,000 new single-family: $675.00. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Wake County permit fee?

Wake County lists no separate plan review fee for these projects.

How does Wake County determine project value?

Floor area (square feet). Residential fees are $75 plus $0.25 per square foot of finished gross floor area (no deduction for garage, corridors, stairs, closets); alterations use the gross floor area being altered. Non-residential (and multi-family) fees use project cost in a fixed-fee table, charged per required trade.

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Electrical: Residential trade permit (electrical, mechanical and plumbing, any number of trades): single $75 fee including electrical pole. Commercial: per-trade project-cost table (see commercial variant). Plumbing: Included in the single $75 residential trade permit fee. Mechanical: Included in the single $75 residential trade permit fee.

When did these Wake County fees take effect?

The schedule does not state an effective date. We last checked it against the official source on Nov 4, 2026.