How Apex calculates your permit fee
The town charges a building permit fee using a fee table based on floor area, with a $500.00 minimum. Plan review is a separate charge: a flat $110.00. Electrical, plumbing and mechanical work gets its own permits.
The fee table
New single family / duplex / townhome
| Floor area | Fee |
|---|---|
| 0 sq ft – 3,000 sq ft | $0.35 per sq ft |
| Over 3,000 sq ft | $1,050.00 for the first 3,000 sq ft + $0.26 per additional sq ft |
1-2 family additions/alterations, building trade
| Floor area | Fee |
|---|---|
| 0 sq ft – 799.99 sq ft | $150.00 |
| Over 799.99 sq ft | $152.00 for the first 799.99 sq ft + $0.19 per additional sq ft |
What counts as project value
Floor area (square feet). Residential permit fees are priced per gross square foot of the structure (new) or of the addition/alteration; no valuation is used.
Worked example: a $350,000 new home
- Building permit fee: $0.00 for the first 0 sq ft + $0.35 × 2,400 per sq ft over = $840.00
- Plan review fee: flat = $110.00
- Total before trade permits: $950.00.
Fees people miss
May also apply (not in the totals above)
- Electrical trade fee (1-2 family addition/alteration): when the addition or alteration includes electrical work; $75.00 on the standard projects.
- Plumbing trade fee (1-2 family addition/alteration): when the addition or alteration includes plumbing work; $75.00 on the standard projects.
- Mechanical trade fee (1-2 family addition/alteration): when the addition or alteration includes mechanical work; $75.00 on the standard projects.
| Fee | Amount |
|---|---|
| Work without permitWhen: work started without a permit | double permit fees |
| Expired permitWhen: permit expired | half of original permit fee |
| Plan re-reviewWhen: repeat review | half of review fee at 3rd, 5th, 7th review |
| Re-inspectionWhen: failed inspection | $100.00 each |
| Water Resources certificate of occupancy - water/sewer finalWhen: new connection to Town water/sewer | $250.00 each |
| DrivewayWhen: new driveway | $100.00 per lot |
| Electric service lateral, single familyWhen: new electric service from the Town of Apex electric utility | $776.00 per service lateral |
| Express plan reviewWhen: applicant requests express review | $600.00 first hour |
| Water and sewer system development feesWhen: new water/sewer connection | see page 6 |
Trade permits are separate. Electrical: 1-2 family additions/alterations: $0.09/sq ft (min $75); single trade $75. Plumbing: 1-2 family additions/alterations: $0.09/sq ft (min $75); single trade $75. Mechanical: 1-2 family additions/alterations: $0.09/sq ft (min $75); single trade $75.
How to apply
- Gather your plans and your project's total value and floor area.
- Submit to Building Inspections and Permitting.
- Pay the permit and plan review fees when invoiced.
- Questions: (919) 249-3400 · Apex Town Hall, 73 Hunter Street, Apex, NC 27502