How High Point calculates your permit fee
The city charges a building permit fee using a fee table based on floor area.
The fee table
Residential new structure and additions (R-3, Type VB)
| Floor area | Fee |
|---|---|
| 0 sq ft – 1,300 sq ft | $0.70 per sq ft |
| Over 1,300 sq ft | $915.20 for the first 1,300 sq ft + $0.88 per additional sq ft |
Residential alteration and repairs (per trade)
A flat $75.00.
What counts as project value
ICC Building Valuation Data table. Construction value = February ICC Building Valuation Data (rounded to whole dollars) for the occupancy and construction type x building area under roof. The city's calculator sheet 'FY2026 ICC Costs (Rounded)' lists R-3 one- and two-family, Type VB at 176 per sq ft.
Worked example: a $350,000 new home
- Building permit fee: $915.20 for the first 1,300 sq ft + $0.88 × 1,100 per sq ft over = $1,884.00
- Total before trade permits: $1,884.00.
Fees people miss
May also apply (not in the totals above)
- NC Homeowner Recovery Fee: when the permit for a single-family dwelling is issued to a licensed general contractor; $10.00 on the standard projects.
| Fee | Amount |
|---|---|
| Residential plan review (townhomes, duplex, triplex, quadplex)When: attached single-family (townhome), duplex, triplex or quadplex | $75.00 per dwelling/permit |
| Manufactured dwellingWhen: manufactured dwelling | $200.00 each |
| Modular dwellingWhen: modular dwelling | $300.00 each |
| Residential temporary utilitiesWhen: temporary utilities requested | $75.00 per utility |
| Residential temporary certificate of occupancyWhen: temporary CO requested | $75.00 per permit |
| Residential construction minimum fee (unlisted items) | $75.00 per trade |
How to apply
- Gather your plans and your project's total value.
- Submit to Build High Point (Inspections Services) through Accela Citizen Access.
- Pay the permit and plan review fees when invoiced.
- Questions: 336-883-3151 · 211 S Hamilton, P.O. Box 230, High Point, NC 27261