BuildingPermitCost

Building Permit Fees in Jacksonville, NC (2026)

Jacksonville prices building permits with $0.52 per square foot, with a $520.00 minimum. Enter your project to see the exact math.

  • Official city schedule
  • Effective Jul 1, 2026
  • Verified Nov 5, 2026
Minimum fee
$520.00
Plan review
None
$75k addition
$218

Permit fee calculator

Jacksonville schedule, eff. Jul 1, 2026
Project type
Estimated permit fees $218.40
  1. 1. Building permit fee
    400 sq ft × $0.32 → minimum $208.00
    $208.00
  2. 2. Technology fee (residential)
    5% of $208.00
    $10.40

May also apply (not in the total)

  • Addition electrical (E) permit, residential
    When: the addition includes electrical work
    $78.00
  • Addition plumbing (P) permit, residential
    When: the addition includes plumbing work
    $78.00
  • Addition mechanical (M) permit, residential
    When: the addition includes mechanical work
    $78.00
  • Addition fuel piping (FP) permit, residential
    When: the addition includes fuel piping work
    $78.00
  • Homeowner Recovery Fund
    When: the permit is subject to the Homeowner Recovery Fund fee
    $10.00

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$214.20
$204.00 building permit + $10.20 technology fee (residential)
Room addition
$75,000 value, addition 400 sq ft
$218.40
$208.00 building permit + $10.40 technology fee (residential)
New single-family home
$350,000 value, new single-family 2,400 sq ft
$1,310.40
$1,248.00 building permit + $62.40 technology fee (residential)

How Jacksonville calculates your permit fee

The city charges a building permit fee using $0.52 per square foot, with a $520.00 minimum.

The fee table

Residential new structure (B, E, P, M, FP combined)

$0.52 per square foot, with a $520.00 minimum.

Residential building addition (B only)

$0.32 per square foot, with a $208.00 minimum.

Residential renovation (B only), buildings previously or currently occupied

$0.13 per square foot, with a $204.00 minimum.

New non-residential structure (B, E, P, M, FP)

$0.63 per square foot, with a $520.00 minimum.

Non-residential addition (B only)

$0.29 per square foot, with a $364.00 minimum.

Non-residential renovation (B only)

$0.21 per square foot, with a $312.00 minimum.

Surcharges

  • Technology fee (residential): 5% of the permit fee, minimum $5.00
  • Technology fee (non-residential): 10% of the permit fee, minimum $10.00

What counts as project value

Floor area (square feet). Building permits are priced per square foot with a minimum. Construction value is used only for the commercial plan review tiers; how it is determined is not stated.

Worked example: a $350,000 new home

  1. Building permit fee: 2,400 sq ft × $0.52 = $1,248.00
  2. Technology fee (residential): 5% of $1,248.00 = $62.40
  3. Total before trade permits: $1,310.40.

Fees people miss

May also apply (not in the totals above)

  • Renovation electrical (E) permit, residential: when the renovation includes electrical work; $78.00 on the standard projects.
  • Renovation plumbing (P) permit, residential: when the renovation includes plumbing work; $78.00 on the standard projects.
  • Renovation mechanical (M) permit, residential: when the renovation includes mechanical work; $78.00 on the standard projects.
  • Renovation fuel piping (FP) permit, residential: when the renovation includes fuel piping work; $78.00 on the standard projects.
  • Homeowner Recovery Fund: when the permit is subject to the Homeowner Recovery Fund fee; $10.00 on the standard projects.
  • Addition electrical (E) permit, residential: when the addition includes electrical work; $78.00 on the standard projects.
  • Addition plumbing (P) permit, residential: when the addition includes plumbing work; $78.00 on the standard projects.
  • Addition mechanical (M) permit, residential: when the addition includes mechanical work; $78.00 on the standard projects.
  • Addition fuel piping (FP) permit, residential: when the addition includes fuel piping work; $78.00 on the standard projects.
FeeAmount
Work commenced before permitWhen: work started before permit issued double the permit fees
Re-inspection (2nd time and beyond), per tradeWhen: second or later failed inspection $52.00 each
Revisions (per permit)When: revision after permit $52.00 each
After hours inspectionsWhen: requested after hours $130.00 per hour, minimum $260
Non-standard / express commercial plan reviewWhen: applicant requests non-standard or express review table

How to apply

  1. Gather your plans and your project's total value and floor area.
  2. Submit to Planning & Inspections.
  3. Pay the permit and plan review fees when invoiced.

How Jacksonville compares

A $25,000 remodel costs $214.20 in Jacksonville: 44% below the national median of $380.00, and the 4th lowest of 7 places we cover in North Carolina (state median $214.20).

A $75,000 addition costs $218.40 in Jacksonville: 73% below the national median of $820.58, and the 3rd lowest of 6 places we cover in North Carolina (state median $218.40).

A $350,000 new home costs $1,310.40 in Jacksonville: 55% below the national median of $2,918.63, and the 2nd highest of 7 places we cover in North Carolina (state median $1,018.00).

Same standard projects everywhere, including plan review and required surcharges. All North Carolina places · Compare side by side

Jacksonville permit fee FAQ

How much is a building permit in Jacksonville, NC?

A $25,000 remodel: $214.20. A $75,000 addition: $218.40. A $350,000 new single-family: $1,310.40. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Jacksonville permit fee?

Jacksonville lists no separate plan review fee for these projects.

How does Jacksonville determine project value?

Floor area (square feet). Building permits are priced per square foot with a minimum. Construction value is used only for the commercial plan review tiers; how it is determined is not stated.

When did these Jacksonville fees take effect?

The schedule is effective Jul 1, 2026 (“FY 2026-2027 Fee Schedules, effective July 1, 2026, revised August 4, 2026”). We last checked it against the official source on Nov 5, 2026.