BuildingPermitCost

Building Permit Fees in Winston-Salem, NC (2026)

Winston-Salem prices building permits with $0.15 per square foot, with a $100.00 minimum. Enter your project to see the exact math.

  • Official city schedule
  • Effective not stated
  • Verified Nov 4, 2026
Minimum fee
$100.00
Plan review
None
$75k addition
$110

Permit fee calculator

Winston-Salem schedule
Project type
Estimated permit fees $110.00
  1. 1. Building permit fee
    400 sq ft × $0.15 → minimum $100.00
    $100.00
  2. 2. Homeowner's Recovery Fund fee (G.S. 87-15.6)
    fixed
    $10.00

May also apply (not in the total)

  • Electrical/plumbing/mechanical permit, each (single-family addition)
    When: for each trade included in the addition
    $75.00

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$110.00
$100.00 building permit + $10.00 homeowner's recovery fund fee (g.s. 87-15.6)
Room addition
$75,000 value, addition 400 sq ft
$110.00
$100.00 building permit + $10.00 homeowner's recovery fund fee (g.s. 87-15.6)
New single-family home
$350,000 value, new single-family 2,400 sq ft
$1,018.00
$360.00 building permit + $216.00 electrical permit (new single-family) + $216.00 plumbing permit (new single-family) + $216.00 mechanical permit (new single-family) + $10.00 homeowner's recovery fund fee (g.s. 87-15.6)

How Winston-Salem calculates your permit fee

The city charges a building permit fee using $0.15 per square foot, with a $100.00 minimum. Electrical, plumbing and mechanical work gets its own permits.

The fee table

Single-family new residential

$0.15 per square foot, with a $100.00 minimum.

Single-family additions

$0.15 per square foot, with a $100.00 minimum.

Single-family alterations/repairs

$0.08 per square foot, with a $100.00 minimum.

Nonresidential construction; non-residential/residential remodels, repairs, demolitions

Project valueFee
$1 – $5,000$100.00
$5,001 – $50,000$100.00 for the first $5,000 + $4.00 per additional $1,000 or fraction
$50,001 – $100,000$232.00 for the first $50,000 + $3.00 per additional $1,000 or fraction
$100,001 – $500,000$388.00 for the first $100,000 + $2.60 per additional $1,000 or fraction
Over $500,000$1,425.00 for the first $500,000 + $2.40 per additional $1,000 or fraction

Added to every matching permit

  • Electrical permit (new single-family): $0.09 per square foot (Residential · new construction)
  • Plumbing permit (new single-family): $0.09 per square foot (Residential · new construction)
  • Mechanical permit (new single-family): $0.09 per square foot (Residential · new construction)

Surcharges

  • Homeowner's Recovery Fund fee (G.S. 87-15.6): $10.00

What counts as project value

Floor area (square feet). New single-family construction, additions and alterations/repairs are priced per square foot of building. Nonresidential construction and non-residential/residential remodels, repairs and demolitions use a value table ($ per $1,000 of value); the schedule does not say how value is determined.

Worked example: a $350,000 new home

  1. Building permit fee: 2,400 sq ft × $0.15 = $360.00
  2. Electrical permit (new single-family): 2,400 sq ft × $0.09 = $216.00
  3. Plumbing permit (new single-family): 2,400 sq ft × $0.09 = $216.00
  4. Mechanical permit (new single-family): 2,400 sq ft × $0.09 = $216.00
  5. Homeowner's Recovery Fund fee (G.S. 87-15.6): fixed = $10.00
  6. Total before trade permits: $1,018.00.

Fees people miss

May also apply (not in the totals above)

  • Electrical/plumbing/mechanical permit, each (single-family alteration): when for each trade included in the alteration; $75.00 on the standard projects.
  • Electrical/plumbing/mechanical permit, each (single-family addition): when for each trade included in the addition; $75.00 on the standard projects.
  • Gas appliances (new single-family): when house has gas appliances; $100.00 on the standard projects.
FeeAmount
Foundation only permit (in addition to building permit)When: foundation-only permit requested $225.00 each
Temporary Certificate of OccupancyWhen: TCO requested $50.00 each
Starting work without permitWhen: work started without permit double permit fee
Extra trip charge (second trip)When: failed inspection $50.00 each
Permit refund fee chargeWhen: refund requested $75.00 each

Trade permits are separate. Electrical: New single-family: $0.09/sq ft. Nonresidential and existing residential: rough outlets 1-50 $24 etc.; minimum $75. Plumbing: New single-family: $0.09/sq ft. Otherwise $10 per fixture etc.; minimum $75. Mechanical: New single-family: $0.09/sq ft. Otherwise schedules I-V (residential $21 per unit); minimum $75.

How to apply

  1. Gather your plans and your project's total value and floor area.
  2. Submit to Winston-Salem/Forsyth County Planning & Development Services (Inspections).
  3. Pay the permit and plan review fees when invoiced.
  4. Questions: (336) 727-2624 · Bryce A. Stuart Municipal Building, Suite 328, 100 East First Street, Winston-Salem, NC 27101

How Winston-Salem compares

A $25,000 remodel costs $110.00 in Winston-Salem: 71% below the national median of $380.00, and the 2nd lowest of 7 places we cover in North Carolina (state median $214.20).

A $75,000 addition costs $110.00 in Winston-Salem: 87% below the national median of $820.58, and the lowest of 6 places we cover in North Carolina (state median $218.40).

A $350,000 new home costs $1,018.00 in Winston-Salem: 65% below the national median of $2,918.63, and the 4th lowest of 7 places we cover in North Carolina (state median $1,018.00).

Same standard projects everywhere, including plan review and required surcharges. All North Carolina places · Compare side by side

Winston-Salem permit fee FAQ

How much is a building permit in Winston-Salem, NC?

A $25,000 remodel: $110.00. A $75,000 addition: $110.00. A $350,000 new single-family: $1,018.00. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Winston-Salem permit fee?

Winston-Salem lists no separate plan review fee for these projects.

How does Winston-Salem determine project value?

Floor area (square feet). New single-family construction, additions and alterations/repairs are priced per square foot of building. Nonresidential construction and non-residential/residential remodels, repairs and demolitions use a value table ($ per $1,000 of value); the schedule does not say how value is determined.

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Electrical: New single-family: $0.09/sq ft. Nonresidential and existing residential: rough outlets 1-50 $24 etc.; minimum $75. Plumbing: New single-family: $0.09/sq ft. Otherwise $10 per fixture etc.; minimum $75. Mechanical: New single-family: $0.09/sq ft. Otherwise schedules I-V (residential $21 per unit); minimum $75.

When did these Winston-Salem fees take effect?

The schedule does not state an effective date. We last checked it against the official source on Nov 4, 2026.