BuildingPermitCost

Building Permit Fees in Frederick County, MD (2026)

Frederick County prices building permits with a fee table based on floor area, plus a $33.00 application fee, with a $63.00 minimum. Enter your project to see the exact math.

  • Official county schedule
  • Effective Jul 1, 2026
  • Verified Nov 5, 2026
Minimum fee
$63.00
Plan review
None
$75k addition
$320

Permit fee calculator

Frederick County schedule, eff. Jul 1, 2026
Project type
Estimated permit fees $320.00
  1. 1. Building permit fee
    table value for 400 sq ft: $276.00
    $276.00
  2. 2. Application fee
    fixed
    $33.00
  3. 3. Automation enhancement fee
    fixed
    $11.00

May also apply (not in the total)

  • Zoning review fee (other residential uses)
    When: the addition or alteration counts as an 'other residential use' for zoning review
    $57.00

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$181.00
$137.00 building permit + $33.00 application + $11.00 automation enhancement
Room addition
$75,000 value, addition 400 sq ft
$320.00
$276.00 building permit + $33.00 application + $11.00 automation enhancement
New single-family home
$350,000 value, new single-family 2,400 sq ft
$1,155.00
$1,023.00 building permit + $33.00 application + $88.00 zoning review fee (new dwelling unit) + $11.00 automation enhancement

How Frederick County calculates your permit fee

The county charges a building permit fee using a fee table based on floor area, plus a $33.00 application fee, with a $63.00 minimum. Electrical, plumbing and mechanical work gets its own permits.

The fee table

New single-family detached dwelling (per dwelling unit)

Floor areaFee
0 sq ft – 4,000 sq ft$1,023.00
4,000 sq ft – 6,499 sq ft$1,224.00
Over 6,499 sq ft$1,634.00

Plus an application fee of $33.00.

Residential additions

Floor areaFee
0 sq ft – 500 sq ft$276.00
500 sq ft – 1,500 sq ft$413.00
Over 1,500 sq ft$552.00

Plus an application fee of $33.00.

Residential alteration or conversion

Floor areaFee
0 sq ft – 500 sq ft$137.00
500 sq ft – 1,500 sq ft$276.00
Over 1,500 sq ft$413.00

Plus an application fee of $33.00.

Non-residential new building, additional floor area, tenant fit-out, interior alteration

$0.28 per square foot, plus a $33.00 application fee, with a $63.00 minimum.

Added to every matching permit

  • Zoning review fee (new dwelling unit): a flat $88.00 (Residential · new construction)

Surcharges

  • Automation enhancement fee: $11.00

What counts as project value

Floor area (square feet). Residential building permit fees are fixed amounts by dwelling type and gross floor area band; non-residential fees are $0.28 per sq ft. Gross floor area includes all finished and unfinished space measured by exterior dimensions, excluding attics, stoops and crawl spaces; any increment of a foot is dropped.

Worked example: a $350,000 new home

  1. Building permit fee: table value for 2,400 sq ft: $1,023.00 = $1,023.00
  2. Application fee: fixed = $33.00
  3. Zoning review fee (new dwelling unit): flat fee = $88.00
  4. Automation enhancement fee: fixed = $11.00
  5. Total before trade permits: $1,155.00.

Fees people miss

May also apply (not in the totals above)

  • Zoning review fee (other residential uses): when the addition or alteration counts as an 'other residential use' for zoning review; $57.00 on the standard projects.
  • Driveway permit fee: when a new driveway apron is built on a County-maintained road (also charged with a new one- or two-family dwelling permit); $100.00 on the standard projects.
FeeAmount
Zoning review fee, non-residential principal useWhen: non-residential principal use $208.00 each
Zoning review fee, other non-residential usesWhen: other non-residential uses $57.00 each
Re-inspection (after first inspection and one re-inspection)When: additional re-inspection $63.00 each
Work without a permit, initial inspectionWhen: work started without a permit $302.00 each
Revisions to a permit or applicationWhen: revision $33.00 each
Site plan compliance inspection feeWhen: non-residential permit requiring site plan approval $276.00 each
Impact fees, excise tax, municipal and other agency feesWhen: as applicable varies
Credit/debit card service feeWhen: card payment 2.5% per transaction (per Permitting Fees page)

Trade permits are separate. Plumbing: Separate plumbing permit schedule (Section II); not extracted. Electrical: Separate electrical permit schedule (Section III); not extracted. Mechanical: No separate mechanical schedule in the county fee schedule.

How to apply

  1. Gather your plans and your project's total value and floor area.
  2. Submit to Frederick County Division of Planning & Permitting, Permit Review Center online through the permit portal.
  3. Pay the permit and plan review fees when invoiced.

How Frederick County compares

A $25,000 remodel costs $181.00 in Frederick County: 52% below the national median of $380.00.

A $75,000 addition costs $320.00 in Frederick County: 61% below the national median of $820.58.

A $350,000 new home costs $1,155.00 in Frederick County: 60% below the national median of $2,918.63.

Cities in Frederick County with their own fee schedule on this site: Frederick. Inside those cities, check whether the city or the county issues your permit.

Same standard projects everywhere, including plan review and required surcharges. All Maryland places · Compare side by side

Frederick County permit fee FAQ

How much is a building permit in Frederick County, MD?

A $25,000 remodel: $181.00. A $75,000 addition: $320.00. A $350,000 new single-family: $1,155.00. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Frederick County permit fee?

Frederick County lists no separate plan review fee for these projects.

How does Frederick County determine project value?

Floor area (square feet). Residential building permit fees are fixed amounts by dwelling type and gross floor area band; non-residential fees are $0.28 per sq ft. Gross floor area includes all finished and unfinished space measured by exterior dimensions, excluding attics, stoops and crawl spaces; any increment of a foot is dropped.

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Plumbing: Separate plumbing permit schedule (Section II); not extracted. Electrical: Separate electrical permit schedule (Section III); not extracted. Mechanical: No separate mechanical schedule in the county fee schedule.

When did these Frederick County fees take effect?

The schedule is effective Jul 1, 2026 (“Fee Schedule - Effective July 1, 2026”). We last checked it against the official source on Nov 5, 2026.