Building Permit Fees in Reading, PA (2026)

Reading prices building permits with a fee table based on project value, with a $50.00 minimum, then charges plan review at a flat $100.00. Enter your project to see the exact math.

  • Official city schedule
  • Effective not stated
  • Verified Nov 5, 2026
Minimum fee
$50.00
Plan review
Separate
$75k addition
$1,735

Permit fee calculator

Reading schedule
Project type
Estimated permit fees $1,734.50
  1. 1. Building permit fee
    $150.00 for the first $1,000.00 + $20.00 × 74 per $1,000.00 over
    $1,630.00
  2. 2. Plan review fee
    flat
    $100.00
  3. 3. Pennsylvania state fee (UCC)
    fixed
    $4.50

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$734.50
$630.00 building permit + $100.00 plan review + $4.50 pennsylvania state fee (ucc)
Room addition
$75,000 value, addition 400 sq ft
$1,734.50
$1,630.00 building permit + $100.00 plan review + $4.50 pennsylvania state fee (ucc)
New single-family home
$350,000 value, new single-family 2,400 sq ft
$7,234.50
$7,130.00 building permit + $100.00 plan review + $4.50 pennsylvania state fee (ucc)

How Reading calculates your permit fee

The city charges a building permit fee using a fee table based on project value, with a $50.00 minimum. Plan review is a separate charge: a flat $100.00. Electrical, plumbing and mechanical work gets its own permits.

The fee table

Project valueFee
$1 – $250$50.00
$251 – $500$70.00
$501 – $1,000$150.00
Over $1,000$150.00 for the first $1,000 + $20.00 per additional $1,000 or fraction

Surcharges

  • Pennsylvania state fee (UCC): $4.50

What counts as project value

Your contract or bid price. Fees are based on the total project cost (labor + materials); the contractor must be selected so the total cost is known. Where several trades are involved, building permit cost = total project cost less the mechanical, electrical and plumbing costs.

Worked example: a $350,000 new home

  1. Building permit fee: $150.00 for the first $1,000.00 + $20.00 × 349 per $1,000.00 over = $7,130.00
  2. Plan review fee: flat = $100.00
  3. Pennsylvania state fee (UCC): fixed = $4.50
  4. Total before trade permits: $7,234.50.

Fees people miss

FeeAmount
Dumpster permitWhen: dumpster placed on street $25.00 per 5 days (30 days = $150)
Electrical document processing (administrative)When: electrical permit application with documents $50.00 each

Trade permits are separate. Electrical: Interim electrical permit application fee: $54.50 up to $1,000 (incl. state fee), then $20 more for every $5,000; electrical plan review and inspections by third-party agencies; $50 administrative fee for submitted documents. Mechanical: Same project-cost schedule as building permits. Plumbing: Same project-cost schedule as building permits.

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to Building & Trades Division.
  3. Pay the permit and plan review fees when invoiced.
  4. Questions: 610-655-6284 · 815 Washington Street, Reading, PA

How Reading compares

A $25,000 remodel costs $734.50 in Reading: 93% above the national median of $380.00, and the highest of 5 places we cover in Pennsylvania (state median $304.50).

A $75,000 addition costs $1,734.50 in Reading: about 2.1 times the national median of $820.58.

A $350,000 new home costs $7,234.50 in Reading: about 2.5 times the national median of $2,918.63, and the highest of 5 places we cover in Pennsylvania (state median $2,124.50).

Same standard projects everywhere, including plan review and required surcharges. All Pennsylvania places · Compare side by side

Reading permit fee FAQ

How much is a building permit in Reading, PA?

A $25,000 remodel: $734.50. A $75,000 addition: $1,734.50. A $350,000 new single-family: $7,234.50. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Reading permit fee?

No. Plan review is charged separately at a flat $100.00.

How does Reading determine project value?

Your contract or bid price. Fees are based on the total project cost (labor + materials); the contractor must be selected so the total cost is known. Where several trades are involved, building permit cost = total project cost less the mechanical, electrical and plumbing costs.

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Electrical: Interim electrical permit application fee: $54.50 up to $1,000 (incl. state fee), then $20 more for every $5,000; electrical plan review and inspections by third-party agencies; $50 administrative fee for submitted documents. Mechanical: Same project-cost schedule as building permits. Plumbing: Same project-cost schedule as building permits.

When did these Reading fees take effect?

The schedule does not state an effective date. We last checked it against the official source on Nov 5, 2026.