BuildingPermitCost

Building Permit Fees in South Bend / St. Joseph County, IN (2026)

South Bend / St. Joseph County prices building permits with $0.98 per $1,000 of project value, with a $60.00 minimum. Enter your project to see the exact math.

  • Official county schedule
  • Effective Jan 1, 2026
  • Verified Nov 5, 2026
Minimum fee
$60.00
Plan review
None
$75k addition
$74

Permit fee calculator

South Bend / St. Joseph County schedule, eff. Jan 1, 2026
Project type
Estimated permit fees $73.50
  1. 1. Building permit fee
    $75,000.00 ÷ 1,000 × $0.98
    $73.50

May also apply (not in the total)

  • Work without a permit penalty
    When: work started without a required permit
    $147.00

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$170.00
$170.00 building permit
Room addition
$75,000 value, addition 400 sq ft
$73.50
$73.50 building permit
New single-family home
$350,000 value, new single-family 2,400 sq ft
$343.00
$343.00 building permit

How South Bend / St. Joseph County calculates your permit fee

The county charges a building permit fee using $0.98 per $1,000 of project value, with a $60.00 minimum. Electrical, plumbing and mechanical work gets its own permits.

The fee table

Residential new construction and additions (ICC BVD x sq ft x $.00098)

$0.98 per $1,000 of project value, with a $60.00 minimum.

Remodeling, alterations and repairs over $500 (estimated construction cost)

Project valueFee
$1 – $100,000$60.00 to $545.00, read from the table (98 steps)
$100,001 – $1,000,000$550.00 for the first $100,000 + $0.90 per additional $1,000 or fraction
Over $1,000,000$1,360.00 for the first $1,000,000 + $0.60 per additional $1,000 or fraction
Show the full table (100 rows)
$1 – $3,000$60.00
$3,001 – $4,000$65.00
$4,001 – $5,000$70.00
$5,001 – $6,000$75.00
$6,001 – $7,000$80.00
$7,001 – $8,000$85.00
$8,001 – $9,000$90.00
$9,001 – $10,000$95.00
$10,001 – $11,000$100.00
$11,001 – $12,000$105.00
$12,001 – $13,000$110.00
$13,001 – $14,000$115.00
$14,001 – $15,000$120.00
$15,001 – $16,000$125.00
$16,001 – $17,000$130.00
$17,001 – $18,000$135.00
$18,001 – $19,000$140.00
$19,001 – $20,000$145.00
$20,001 – $21,000$150.00
$21,001 – $22,000$155.00
$22,001 – $23,000$160.00
$23,001 – $24,000$165.00
$24,001 – $25,000$170.00
$25,001 – $26,000$175.00
$26,001 – $27,000$180.00
$27,001 – $28,000$185.00
$28,001 – $29,000$190.00
$29,001 – $30,000$195.00
$30,001 – $31,000$200.00
$31,001 – $32,000$205.00
$32,001 – $33,000$210.00
$33,001 – $34,000$215.00
$34,001 – $35,000$220.00
$35,001 – $36,000$225.00
$36,001 – $37,000$230.00
$37,001 – $38,000$235.00
$38,001 – $39,000$240.00
$39,001 – $40,000$245.00
$40,001 – $41,000$250.00
$41,001 – $42,000$255.00
$42,001 – $43,000$260.00
$43,001 – $44,000$265.00
$44,001 – $45,000$270.00
$45,001 – $46,000$275.00
$46,001 – $47,000$280.00
$47,001 – $48,000$285.00
$48,001 – $49,000$290.00
$49,001 – $50,000$295.00
$50,001 – $51,000$300.00
$51,001 – $52,000$305.00
$52,001 – $53,000$310.00
$53,001 – $54,000$315.00
$54,001 – $55,000$320.00
$55,001 – $56,000$325.00
$56,001 – $57,000$330.00
$57,001 – $58,000$335.00
$58,001 – $59,000$340.00
$59,001 – $60,000$345.00
$60,001 – $61,000$350.00
$61,001 – $62,000$355.00
$62,001 – $63,000$360.00
$63,001 – $64,000$365.00
$64,001 – $65,000$370.00
$65,001 – $66,000$375.00
$66,001 – $67,000$380.00
$67,001 – $68,000$385.00
$68,001 – $69,000$390.00
$69,001 – $70,000$395.00
$70,001 – $71,000$400.00
$71,001 – $72,000$405.00
$72,001 – $73,000$410.00
$73,001 – $74,000$415.00
$74,001 – $75,000$420.00
$75,001 – $76,000$425.00
$76,001 – $77,000$430.00
$77,001 – $78,000$435.00
$78,001 – $79,000$440.00
$79,001 – $80,000$445.00
$80,001 – $81,000$450.00
$81,001 – $82,000$455.00
$82,001 – $83,000$460.00
$83,001 – $84,000$465.00
$84,001 – $85,000$470.00
$85,001 – $86,000$475.00
$86,001 – $87,000$480.00
$87,001 – $88,000$485.00
$88,001 – $89,000$490.00
$89,001 – $90,000$495.00
$90,001 – $91,000$500.00
$91,001 – $92,000$505.00
$92,001 – $93,000$510.00
$93,001 – $94,000$515.00
$94,001 – $95,000$520.00
$95,001 – $96,000$525.00
$96,001 – $97,000$530.00
$97,001 – $98,000$535.00
$98,001 – $99,000$540.00
$99,001 – $100,000$545.00
$100,001 – $1,000,000$550.00 for the first $100,000 + $0.90 per additional $1,000 or fraction
Over $1,000,000$1,360.00 for the first $1,000,000 + $0.60 per additional $1,000 or fraction

Commercial new construction and additions (ICC BVD x sq ft x $.00098)

$0.98 per $1,000 of project value, with a $60.00 minimum.

What counts as project value

ICC Building Valuation Data table. New construction and additions: ICC Building Valuation Table cost per square foot in effect in January of each year, times total square footage (with occupancy reassignments). Remodeling, alterations and repairs: estimated construction cost.

Worked example: a $350,000 new home

  1. Building permit fee: $350,000.00 ÷ 1,000 × $0.98 = $343.00
  2. Total before trade permits: $343.00.

Fees people miss

May also apply (not in the totals above)

  • Work without a permit penalty: when work started without a required permit; $340.00 on the standard projects.
FeeAmount
Reinspection, commercial and industrial projectsWhen: reinspection needed $60.00 each
Additional final inspection after a failed final inspectionWhen: failed final inspection $80.00 each
Northeast Neighborhood Development Area design reviewWhen: stand-alone residential or commercial new construction in the Northeast Neighborhood Development Area $160.00 each
Contractor registration (general contractors, homebuilders, remodelers)When: contractor registration $125.00 per year

Trade permits are separate. Electrical: Per-item fees (circuits $5 each, panels $7-$50, etc.), minimum permit fee $60. Plumbing: Per-fixture fees ($6 per fixture or trap), minimum permit fee $60. Mechanical: Per-appliance fees (e.g. heat pumps up to 7.5 tons $75 each), minimum permit fee $60.

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to St. Joseph County/South Bend Building Department.
  3. Pay the permit and plan review fees when invoiced.

How South Bend / St. Joseph County compares

A $25,000 remodel costs $170.00 in South Bend / St. Joseph County: 55% below the national median of $380.00, and the 2nd lowest of 6 places we cover in Indiana (state median $275.00).

A $75,000 addition costs $73.50 in South Bend / St. Joseph County: 91% below the national median of $820.58, and the lowest of 6 places we cover in Indiana (state median $310.00).

A $350,000 new home costs $343.00 in South Bend / St. Joseph County: 88% below the national median of $2,918.63, and the lowest of 6 places we cover in Indiana (state median $1,278.00).

Same standard projects everywhere, including plan review and required surcharges. All Indiana places · Compare side by side

South Bend / St. Joseph County permit fee FAQ

How much is a building permit in South Bend / St. Joseph County, IN?

A $25,000 remodel: $170.00. A $75,000 addition: $73.50. A $350,000 new single-family: $343.00. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the South Bend / St. Joseph County permit fee?

South Bend / St. Joseph County lists no separate plan review fee for these projects.

How does South Bend / St. Joseph County determine project value?

ICC Building Valuation Data table. New construction and additions: ICC Building Valuation Table cost per square foot in effect in January of each year, times total square footage (with occupancy reassignments). Remodeling, alterations and repairs: estimated construction cost.

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Electrical: Per-item fees (circuits $5 each, panels $7-$50, etc.), minimum permit fee $60. Plumbing: Per-fixture fees ($6 per fixture or trap), minimum permit fee $60. Mechanical: Per-appliance fees (e.g. heat pumps up to 7.5 tons $75 each), minimum permit fee $60.

When did these South Bend / St. Joseph County fees take effect?

The schedule is effective Jan 1, 2026 (“Permit Fee Schedule 2026; city page: 'as of January 1st, 2026, the minimum permit fee is $60.00'”). We last checked it against the official source on Nov 5, 2026.