BuildingPermitCost

Building Permit Fees in Marion County, IN (2026)

Marion County prices building permits with a fee table based on floor area, plus a $40.00 application fee, then charges plan review at its own fee table. Enter your project to see the exact math.

  • Official county schedule
  • Effective Jan 5, 2026
  • Verified Nov 5, 2026
Minimum fee
—
Plan review
Separate
$75k addition
$1,105

Permit fee calculator

Marion County schedule, eff. Jan 5, 2026
Project type
Estimated permit fees $1,105.00
  1. 1. Building permit fee
    table value for 400 sq ft: $750.00
    $750.00
  2. 2. Application fee
    fixed
    $40.00
  3. 3. Plan review fee
    table value for 400 sq ft: $175.00
    $175.00
  4. 4. Improvement Location Permit (ILP) application fee
    flat fee
    $32.00
  5. 5. Improvement Location Permit (ILP) review fee, single-family additions
    flat fee
    $108.00

May also apply (not in the total)

  • Drainage permit (application + review up to 3 hours + issuance)
    When: when a drainage permit is required (lots not in a subdivision pre-approved for drainage, additions over 400 sq ft)
    $890.00

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$390.00
$200.00 building permit + $40.00 application + $150.00 plan review
Room addition
$75,000 value, addition 400 sq ft
$1,105.00
$750.00 building permit + $40.00 application + $175.00 plan review + $32.00 improvement location permit (ilp) application + $108.00 improvement location permit (ilp) review fee, single-family additions
New single-family home
$350,000 value, new single-family 2,400 sq ft
$1,278.00
$850.00 building permit + $40.00 application + $200.00 plan review + $32.00 improvement location permit (ilp) application + $156.00 improvement location permit (ilp) review fee, new single-family (platted)

How Marion County calculates your permit fee

The county charges a building permit fee using a fee table based on floor area, plus a $40.00 application fee. Plan review is a separate charge: its own fee table. Electrical, plumbing and mechanical work gets its own permits.

The fee table

Structural Permit - Residential (STR): construction or placement of, or additions to, Class 2 primary structures

Floor areaFee
0 sq ft – 2,000 sq ft$750.00
Over 2,000 sq ft$750.00 for the first 2,000 sq ft + $100.00 per additional 500 sq ft or fraction

Plus an application fee of $40.00.

STR Residential: remodeling, alteration, or repair of Class 2 structures; no addition

Floor areaFee
0 sq ft – 1,000 sq ft$200.00
Over 1,000 sq ft$200.00 for the first 1,000 sq ft + $50.00 per additional 500 sq ft or fraction

Plus an application fee of $40.00.

Structural Permit - Commercial (STR): construction or placement of, or additions to, Class 1 structures

Floor areaFee
0 sq ft – 2,500 sq ft$1,000.00
Over 2,500 sq ft$1,000.00 for the first 2,500 sq ft + $150.00 per additional 1,000 sq ft or fraction

Plus an application fee of $40.00.

STR Commercial: remodeling, alteration, or repair of Class 1 structures

Floor areaFee
0 sq ft – 999 sq ft$350.00
999 sq ft – 2,500 sq ft$750.00
Over 2,500 sq ft$750.00 for the first 2,500 sq ft + $150.00 per additional 1,000 sq ft or fraction

Plus an application fee of $40.00.

Added to every matching permit

  • Improvement Location Permit (ILP) application fee: a flat $32.00 (Residential · new construction, additions)
  • Improvement Location Permit (ILP) review fee, new single-family (platted): a flat $156.00 (Residential · new construction)
  • Improvement Location Permit (ILP) review fee, single-family additions: a flat $108.00 (Residential · additions)
  • Improvement Location Permit (ILP) application fee, commercial: a flat $32.00 (Commercial · new construction)
  • Improvement Location Permit (ILP) review fee, commercial new construction: a fee table based on floor area (Commercial · new construction)

What counts as project value

Floor area (square feet). Fees are not based on valuation. Structural permit review and issuance fees are priced by floor area: 'Sqft calculations include the area of an attached garage or carport, and the area of a finished basement or attic, but excludes the area of an unfinished basement or attic.' (Permits sheet, row 27).

Worked example: a $350,000 new home

  1. Building permit fee: $750.00 for the first 2,000 sq ft + $100.00 × 1 per 500 sq ft over = $850.00
  2. Application fee: fixed = $40.00
  3. Plan review fee: $175.00 for the first 2,000 sq ft + $25.00 × 1 per 500 sq ft over = $200.00
  4. Improvement Location Permit (ILP) application fee: flat fee = $32.00
  5. Improvement Location Permit (ILP) review fee, new single-family (platted): flat fee = $156.00
  6. Total before trade permits: $1,278.00.

Fees people miss

May also apply (not in the totals above)

  • Drainage permit (application + review up to 3 hours + issuance): when when a drainage permit is required (lots not in a subdivision pre-approved for drainage, additions over 400 sq ft); $890.00 on the standard projects.
FeeAmount
ILP review fee, new single-family on a metes-and-bounds lotWhen: lot described by metes and bounds instead of a recorded plat (replaces the $156 platted fee) $199.00 each
ILP review fee, two-family/cluster/attachedWhen: two-family or attached dwellings $199.00 each
Floodplain Development Permit, new single-familyWhen: property in a floodplain $183.00 each
Reinspection feeWhen: failed or not-ready inspection $175.00 each
Accelerated same-day inspection, Class 2 structuresWhen: optional $232.00 each
Work without Improvement Location Permit, first offense in a calendar yearWhen: violation $250.00 each
Permit amendmentWhen: permit amended $101.00 each
Permit renewalWhen: permit renewed $56.00 each
Request to transfer a building permitWhen: permit transferred $48.00 each
Admin Fees (printed at the top of the Permits, Inspections, Code Enforcement and Misc. sheets)When: not stated; not treated as part of an ordinary permit $250.00 each

Trade permits are separate. Plumbing: Plumbing Permit (PLM): new residential structure $185 (≤ 2,500 sf) plus $23 per 500 sf over 2,500 sf; residential repair/alteration/remodel $153 (≤ 1,000 sf) plus $23 per 500 sf over 1,000 sf; commercial $182 (0-10 fixtures) plus $23 per additional 5 fixtures. Craft permit fees did not change on January 5, 2026. Electrical: Electrical Permit (ELE): new structure or commercial addition $202 (≤ 2,500 sf) plus $23 per additional 1,000 sf over 2,500 sf; repair to existing structure or residential addition $169 (≤ 1,000 sf) plus $23 per additional 500 sf over 1,000 sf; self-certification tags $22. Mechanical: Heating/Cooling Permit (HTG), all structures: heating or cooling $153 (≤ 2,500 sf), combined heating & cooling $185 (≤ 2,500 sf), plus $23 per 1,000 sf over 2,500 sf; refrigeration equipment $156.

How to apply

  1. Gather your plans and your project's total value and floor area.
  2. Submit to Department of Business and Neighborhood Services (DBNS) online through Accela Citizens Access (ACA).
  3. Pay the permit and plan review fees when invoiced.
  4. Questions: 317.327.8700 · 200 E Washington St, Indianapolis, IN 46204

How Marion County compares

A $25,000 remodel costs $390.00 in Marion County: about the same as the national median of $380.00, and the highest of 6 places we cover in Indiana (state median $275.00).

A $75,000 addition costs $1,105.00 in Marion County: 35% above the national median of $820.58, and the highest of 6 places we cover in Indiana (state median $310.00).

A $350,000 new home costs $1,278.00 in Marion County: 56% below the national median of $2,918.63, and the 3rd highest of 6 places we cover in Indiana (state median $1,278.00).

Cities in Marion County with their own fee schedule on this site: Indianapolis. Inside those cities, check whether the city or the county issues your permit.

Same standard projects everywhere, including plan review and required surcharges. All Indiana places · Compare side by side

Marion County permit fee FAQ

How much is a building permit in Marion County, IN?

A $25,000 remodel: $390.00. A $75,000 addition: $1,105.00. A $350,000 new single-family: $1,278.00. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Marion County permit fee?

No. Plan review is charged separately at its own fee table.

How does Marion County determine project value?

Floor area (square feet). Fees are not based on valuation. Structural permit review and issuance fees are priced by floor area: 'Sqft calculations include the area of an attached garage or carport, and the area of a finished basement or attic, but excludes the area of an unfinished basement or attic.' (Permits sheet, row 27).

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Plumbing: Plumbing Permit (PLM): new residential structure $185 (≤ 2,500 sf) plus $23 per 500 sf over 2,500 sf; residential repair/alteration/remodel $153 (≤ 1,000 sf) plus $23 per 500 sf over 1,000 sf; commercial $182 (0-10 fixtures) plus $23 per additional 5 fixtures. Craft permit fees did not change on January 5, 2026. Electrical: Electrical Permit (ELE): new structure or commercial addition $202 (≤ 2,500 sf) plus $23 per additional 1,000 sf over 2,500 sf; repair to existing structure or residential addition $169 (≤ 1,000 sf) plus $23 per additional 500 sf over 1,000 sf; self-certification tags $22. Mechanical: Heating/Cooling Permit (HTG), all structures: heating or cooling $153 (≤ 2,500 sf), combined heating & cooling $185 (≤ 2,500 sf), plus $23 per 1,000 sf over 2,500 sf; refrigeration equipment $156.

When did these Marion County fees take effect?

The schedule is effective Jan 5, 2026 (“Fee Schedule as of January 5, 2026 (approved October 2025 by the DBNS Board and City-County Council; applies to applications received on or after January 5, 2026)”). We last checked it against the official source on Nov 5, 2026.