Phoenix prices building permits with a fee table based on project value, with a $195.00 minimum, then charges plan review at 100% up to $50,000, 80% above that of the permit fee (minimum $195.00). Enter your project to see the exact math.

  • Official city schedule
  • Effective Jan 20, 2026
  • Verified Nov 4, 2026
Minimum fee
$195.00
Plan review
Separate
$75k addition
$1,670

Permit fee calculator

Phoenix schedule, eff. Jan 20, 2026
Project type
Estimated permit fees $1,670.40
  1. 1. Building permit fee
    $703.00 for the first $50,000.00 + $9.00 × 25 per $1,000.00 over
    $928.00
  2. 2. Plan review fee
    80% of $928.00
    $742.40

May also apply (not in the total)

  • Aquatics program surcharge (swimming pools)
    When: swimming pool permits only
    $30.00
  • Work done without a permit (Section 114)
    When: work started without a permit
    $1,856.00

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$906.00
$453.00 building permit + $453.00 plan review
Room addition
$75,000 value, addition 400 sq ft
$1,670.40
$928.00 building permit + $742.40 plan review
New single-family home
$350,000 value, new single-family 2,400 sq ft
$6,125.40
$3,403.00 building permit + $2,722.40 plan review

How Phoenix calculates your permit fee

The city charges a building permit fee using a fee table based on project value, with a $195.00 minimum. Plan review is a separate charge: 100% up to $50,000, 80% above that of the permit fee (minimum $195.00).

The fee table

Project valueFee
$1 – $1,000$195.00
$1,001 – $10,000$195.00 for the first $1,000 + $12.00 per additional $1,000 or fraction
$10,001 – $50,000$303.00 for the first $10,000 + $10.00 per additional $1,000 or fraction
$50,001 – $200,000$703.00 for the first $50,000 + $9.00 per additional $1,000 or fraction
$200,001 – $1,000,000$2,053.00 for the first $200,000 + $9.00 per additional $1,000 or fraction
$1,000,001 – $10,000,000$9,253.00 for the first $1,000,000 + $5.00 per additional $1,000 or fraction
Over $10,000,000$54,253.00 for the first $10,000,000 + $5.00 per additional $1,000 or fraction

What counts as project value

Higher of your bid or the valuation table. "Project valuation is the higher of the minimum project valuation as calculated by Planning & Development, or the project valuation as provided by the applicant." Minimum valuation = building square footage times the city's standard rate for occupancy (Building Valuation Table revised January 20, 2026). Each separate building is calculated separately.

Worked example: a $350,000 new home

  1. Building permit fee: $2,053.00 for the first $200,000.00 + $9.00 × 150 per $1,000.00 over = $3,403.00
  2. Plan review fee: 80% of $3,403.00 = $2,722.40
  3. Total before trade permits: $6,125.40.

Fees people miss

May also apply (not in the totals above)

  • Aquatics program surcharge (swimming pools): when swimming pool permits only; $30.00 on the standard projects.
  • Work done without a permit (Section 114): when work started without a permit; $906.00 on the standard projects.
FeeAmount
Re-inspection (work not ready, no access, or second+ re-inspection) $195.00 each
Investigation fee, work done without a permitWhen: work started without a permit $250.00 each
Plan review, second correction (3rd review) 20% of current plan review fee, minimum $195
Revisions to approved plans $195.00 per hour
One-time permit time extension 50% of current permit fee
Permit reinstatement within 1 year of expiration 50% of current permit fee
Each additional utility meter $98.00 each
Temporary power inspection $195.00 each
Temporary or partial certificate of occupancy $780.00 per request
After-hours inspection (within 2 hours of inspection hours)When: after-hours inspection requested $195.00 per hour
Single-family and duplex plot plan review $98.00 per permit
Fire life safety plan review $195.00 per hour
1 more fees
  • Expedited plan review, initial review: 3 times the basic plan review fee

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to Planning & Development Department.
  3. Pay the permit and plan review fees when invoiced.
  4. Questions: (602) 262-7811 · 200 W Washington St., 3rd Floor, Phoenix, AZ 85003

How Phoenix compares

A $25,000 remodel costs $906.00 in Phoenix: about 2.4 times the national median of $380.00, and the highest of 7 places we cover in Arizona (state median $627.00).

A $75,000 addition costs $1,670.40 in Phoenix: about twice the national median of $820.58, and the 2nd highest of 7 places we cover in Arizona (state median $1,350.94).

A $350,000 new home costs $6,125.40 in Phoenix: about 2.1 times the national median of $2,918.63, and the highest of 7 places we cover in Arizona (state median $3,949.69).

Same standard projects everywhere, including plan review and required surcharges. All Arizona places · Compare side by side

Phoenix permit fee FAQ

How much is a building permit in Phoenix, AZ?

A $25,000 remodel: $906.00. A $75,000 addition: $1,670.40. A $350,000 new single-family: $6,125.40. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Phoenix permit fee?

No. Plan review is charged separately at 100% up to $50,000, 80% above that of the permit fee (minimum $195.00).

How does Phoenix determine project value?

Higher of your bid or the valuation table. "Project valuation is the higher of the minimum project valuation as calculated by Planning & Development, or the project valuation as provided by the applicant." Minimum valuation = building square footage times the city's standard rate for occupancy (Building Valuation Table revised January 20, 2026). Each separate building is calculated separately.

When did these Phoenix fees take effect?

The schedule is effective Jan 20, 2026 (“PDD Fee Schedule Approved 12/17/2025, Per Ordinance G-7465 (Effective 1/20/2026)”). We last checked it against the official source on Nov 4, 2026.