BuildingPermitCost

Building Permit Fees in Pharr, TX (2026)

Pharr prices building permits with $0.34 per square foot, plus a $20.00 application fee. Enter your project to see the exact math.

  • Official city schedule
  • Effective Oct 17, 2022
  • Verified Nov 5, 2026
Minimum fee
—
Plan review
None
$75k addition
$156

Permit fee calculator

Pharr schedule, eff. Oct 17, 2022
Project type
Estimated permit fees $156.00
  1. 1. Building permit fee
    400 sq ft × $0.34
    $136.00
  2. 2. Application fee
    fixed
    $20.00

May also apply (not in the total)

  • After the fact (work without permit)
    When: work started before permit issued
    $136.00

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$122.00
$102.00 building permit + $20.00 application
Room addition
$75,000 value, addition 400 sq ft
$156.00
$136.00 building permit + $20.00 application
New single-family home
$350,000 value, new single-family 2,400 sq ft
$836.00
$816.00 building permit + $20.00 application

How Pharr calculates your permit fee

The city charges a building permit fee using $0.34 per square foot, plus a $20.00 application fee. Electrical, plumbing and mechanical work gets its own permits.

The fee table

New single-family construction, additions, remodels/alterations

$0.34 per square foot, plus a $20.00 application fee.

Commercial building permits

Project valueFee
$1 – $1,000$0.00
$1,001 – $50,000$20.00 for the first $1,000 + $5.00 per additional $1,000 or fraction
$50,001 – $100,000$260.00 for the first $50,000 + $4.00 per additional $1,000 or fraction
$100,001 – $500,000$460.00 for the first $100,000 + $3.00 per additional $1,000 or fraction
Over $500,000$1,660.00 for the first $500,000 + $2.00 per additional $1,000 or fraction

Plus an application fee of $50.00.

What counts as project value

Floor area (square feet). Residential permits are priced per square foot (Texas HB 852 bars valuation-based residential fees). Commercial permits use a valuation table; the city determines valuation of a building or alteration using the Valuation Data in Exhibit A-1 (per-sq-ft costs by occupancy and construction type).

Worked example: a $350,000 new home

  1. Building permit fee: 2,400 sq ft × $0.34 = $816.00
  2. Application fee: fixed = $20.00
  3. Total before trade permits: $836.00.

Fees people miss

May also apply (not in the totals above)

  • After the fact (work without permit): when work started before permit issued; $102.00 on the standard projects.
  • Certificate of occupancy, residential (inspection included): when a residential certificate of occupancy is issued (typically new homes); $50.00 on the standard projects.
FeeAmount
Sewer tap charge, residentialWhen: new sewer tap $1,100.00 each
Water tap charge, 3/4 in meterWhen: new water tap $900.00 each
First reinspectionWhen: reinspection required $50.00 each
Permit extensionWhen: extension requested 25% of original permit fee
Parkland dedication fee, single-family residentialWhen: residential subdivision $1,250.00 per acre
Multi-family building permit (duplex, triplex, 4+ units), new/additions/remodelsWhen: multi-family project $0.40 per sq ft

Trade permits are separate. Electrical: Minimum permit fee $25; circuits or feeders $3.00; change of or increase of service $30; temporary pole $25. Plumbing: Permit $30 plus $6.00 per fixture; gas line $25; water or sewer line $15. Mechanical: $30 for issuing each permit plus tonnage fees: 1-2 tons $20 for the first ton plus $20 additional ton; 2-4 tons $40 + $10/ton; 4-10 tons $60 + $5/ton; over 10 tons $90 + $2/ton.

How to apply

  1. Gather your plans and your project's total value and floor area.
  2. Submit to Building and Code Compliance Department through Building Pharr Permit Portal.
  3. Pay the permit and plan review fees when invoiced.
  4. Questions: (956) 402-4000 · 118 S Cage Blvd, Pharr, TX 78577

How Pharr compares

A $25,000 remodel costs $122.00 in Pharr: 68% below the national median of $380.00, and the 3rd lowest of 19 places we cover in Texas (state median $201.75).

A $75,000 addition costs $156.00 in Pharr: 81% below the national median of $820.58, and the 4th lowest of 17 places we cover in Texas (state median $264.82).

A $350,000 new home costs $836.00 in Pharr: 71% below the national median of $2,918.63, and the 3rd lowest of 20 places we cover in Texas (state median $1,448.00).

Same standard projects everywhere, including plan review and required surcharges. All Texas places · Compare side by side

Pharr permit fee FAQ

How much is a building permit in Pharr, TX?

A $25,000 remodel: $122.00. A $75,000 addition: $156.00. A $350,000 new single-family: $836.00. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Pharr permit fee?

Pharr lists no separate plan review fee for these projects.

How does Pharr determine project value?

Floor area (square feet). Residential permits are priced per square foot (Texas HB 852 bars valuation-based residential fees). Commercial permits use a valuation table; the city determines valuation of a building or alteration using the Valuation Data in Exhibit A-1 (per-sq-ft costs by occupancy and construction type).

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Electrical: Minimum permit fee $25; circuits or feeders $3.00; change of or increase of service $30; temporary pole $25. Plumbing: Permit $30 plus $6.00 per fixture; gas line $25; water or sewer line $15. Mechanical: $30 for issuing each permit plus tonnage fees: 1-2 tons $20 for the first ton plus $20 additional ton; 2-4 tons $40 + $10/ton; 4-10 tons $60 + $5/ton; over 10 tons $90 + $2/ton.

When did these Pharr fees take effect?

The schedule is effective Oct 17, 2022 (“Ordinance O-2022-43, effective upon passage; third reading approved October 17, 2022”). We last checked it against the official source on Nov 5, 2026.