Building Permit Fees in Abilene, TX (2026)

Abilene prices building permits with a flat $1,000.00, with a $75.00 minimum, then charges plan review at a flat $45.00. Enter your project to see the exact math.

  • Official city schedule
  • Effective not stated
  • Verified Nov 5, 2026
Minimum fee
$75.00
Plan review
Separate
$75k addition
$352

Permit fee calculator

Abilene schedule
Project type
Estimated permit fees $352.00
  1. 1. Building permit fee
    $250.00 for the first 60 sq ft + $0.30 × 340 per sq ft over
    $352.00

Plan review fee not published; ask the permit office.

May also apply (not in the total)

  • Work without required permit
    When: work started without a required permit
    $352.00

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$322.00
$322.00 building permit
Room addition
$75,000 value, addition 400 sq ft
$352.00
$352.00 building permit
New single-family home
$350,000 value, new single-family 2,400 sq ft
$1,045.00
$1,000.00 building permit + $45.00 plan review

How Abilene calculates your permit fee

The city charges a building permit fee using a flat $1,000.00, with a $75.00 minimum. Plan review is a separate charge: a flat $45.00. Electrical, plumbing and mechanical work gets its own permits.

The fee table

New single-family residential construction (enclosed areas)

A flat $1,000.00, with a $75.00 minimum.

Single family addition/alterations

Floor areaFee
0 sq ft – 60 sq ft$250.00
60 sq ft – 1,000 sq ft$250.00 for the first 60 sq ft + $0.30 per additional sq ft or fraction
1,000 sq ft – 2,000 sq ft$532.00 for the first 1,000 sq ft + $0.15 per additional sq ft or fraction
Over 2,000 sq ft$682.00 for the first 2,000 sq ft + $0.10 per additional sq ft or fraction

New commercial, commercial add-ons and alterations, multi-family 4 or more units

Project valueFee
$1 – $500$75.00
$501 – $2,000$75.00 for the first $500 + $1.50 per additional $100 or fraction
$2,001 – $25,000$97.50 for the first $2,000 + $7.00 per additional $1,000 or fraction
$25,001 – $50,000$258.50 for the first $25,000 + $6.00 per additional $1,000 or fraction
$50,001 – $100,000$408.50 for the first $50,000 + $5.00 per additional $1,000 or fraction
$100,001 – $500,000$658.50 for the first $100,000 + $4.00 per additional $1,000 or fraction
$500,001 – $1,000,000$2,258.50 for the first $500,000 + $3.50 per additional $1,000 or fraction
Over $1,000,000$4,008.50 for the first $1,000,000 + $2.50 per additional $1,000 or fraction

What counts as project value

Not stated in the schedule. New single-family homes are a flat fee and residential additions/alterations are priced by square footage. The valuation table (commercial, commercial add-ons/alterations, multi-family 4+ units) uses 'Total valuation'; the page does not say how valuation is determined.

Worked example: a $350,000 new home

  1. Building permit fee: flat fee = $1,000.00
  2. Plan review fee: flat = $45.00
  3. Total before trade permits: $1,045.00.

Fees people miss

May also apply (not in the totals above)

  • Work without required permit: when work started without a required permit; $322.00 on the standard projects.
FeeAmount
Re-inspection feeWhen: re-inspection $75.00 each
Grading permitWhen: grading permit required $350.00 each
Certificate of occupancyWhen: certificate of occupancy (commercial) $100.00 each
Stop work order releaseWhen: stop work order $200.00 each
Inspection outside normal business hours (minimum 2 hours)When: after-hours inspection request $250.00 each
Special request / same day inspectionWhen: same-day inspection request $100.00 each
Temporary building / sales trailerWhen: temporary building $75.00 each

Trade permits are separate. Electrical: Minimum $75; new/upgrade service up to 200 amps $100, 201-400 amps $150, 401+ amps $200; new outlets up to 50 $75. Included in the new single-family flat fee. Mechanical: Minimum $75; refrigerant system up to 10 tons $75, over 10 tons $85. Plumbing: Minimum $75; water heater $75; new gas service line $75; residential irrigation $75.

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to Building Inspections.
  3. Pay the permit and plan review fees when invoiced.
  4. Questions: 325-676-6232 · 555 Walnut Street, Abilene, TX 79601

How Abilene compares

A $25,000 remodel costs $322.00 in Abilene: 15% below the national median of $380.00, and the highest of 19 places we cover in Texas (state median $201.75).

A $75,000 addition costs $352.00 in Abilene: 57% below the national median of $820.58, and the 3rd highest of 17 places we cover in Texas (state median $264.82).

A $350,000 new home costs $1,045.00 in Abilene: 64% below the national median of $2,918.63, and the 4th lowest of 20 places we cover in Texas (state median $1,448.00).

Same standard projects everywhere, including plan review and required surcharges. All Texas places · Compare side by side

Abilene permit fee FAQ

How much is a building permit in Abilene, TX?

A $25,000 remodel: $322.00. A $75,000 addition: $352.00. A $350,000 new single-family: $1,045.00. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Abilene permit fee?

No. Plan review is charged separately at a flat $45.00.

How does Abilene determine project value?

Not stated in the schedule. New single-family homes are a flat fee and residential additions/alterations are priced by square footage. The valuation table (commercial, commercial add-ons/alterations, multi-family 4+ units) uses 'Total valuation'; the page does not say how valuation is determined.

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Electrical: Minimum $75; new/upgrade service up to 200 amps $100, 201-400 amps $150, 401+ amps $200; new outlets up to 50 $75. Included in the new single-family flat fee. Mechanical: Minimum $75; refrigerant system up to 10 tons $75, over 10 tons $85. Plumbing: Minimum $75; water heater $75; new gas service line $75; residential irrigation $75.

When did these Abilene fees take effect?

The schedule does not state an effective date. We last checked it against the official source on Nov 5, 2026.