BuildingPermitCost

Building Permit Fees in Clackamas County, OR (2026)

Clackamas County prices building permits with a fee table based on project value, with a $120.00 minimum, then charges plan review at 65% of the permit fee. Enter your project to see the exact math.

  • Official county schedule
  • Effective not stated
  • Verified Nov 5, 2026
Minimum fee
$120.00
Plan review
65%
$75k addition
$1,009

Permit fee calculator

Clackamas County schedule
Project type
Estimated permit fees $1,008.90
  1. 1. Building permit fee
    $458.00 for the first $50,000.00 + $4.48 × 25 per $1,000.00 over
    $570.00
  2. 2. Plan review fee
    65% of $570.00
    $370.50
  3. 3. Oregon state surcharge
    12% of $570.00
    $68.40

May also apply (not in the total)

  • DTD technology fee
    When: if the DTD administration technology fee is charged on building permits
    $5.00

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$513.65
$290.20 building permit + $188.63 plan review + $34.82 oregon state surcharge
Room addition
$75,000 value, addition 400 sq ft
$1,008.90
$570.00 building permit + $370.50 plan review + $68.40 oregon state surcharge
New single-family home
$350,000 value, new single-family 2,400 sq ft
$2,909.02
$1,619.50 building permit + $1,052.68 plan review + $42.50 residential certificate of occupancy (charged at time of permit issuance) + $194.34 oregon state surcharge

How Clackamas County calculates your permit fee

The county charges a building permit fee using a fee table based on project value, with a $120.00 minimum. Plan review is a separate charge: 65% of the permit fee. Electrical, plumbing and mechanical work gets its own permits.

The fee table

1 & 2 family: new construction, additions, remodels, alterations

Project valueFee
$1 – $500$120.00
$501 – $2,000$120.00
$2,001 – $25,000$120.00 for the first $2,000 + $7.40 per additional $1,000
$25,001 – $50,000$290.00 for the first $25,000 + $6.72 per additional $1,000
$50,001 – $100,000$458.00 for the first $50,000 + $4.48 per additional $1,000
Over $100,000$682.00 for the first $100,000 + $3.75 per additional $1,000

Commercial/Industrial structural

Project valueFee
$1 – $2,000$120.00
$2,001 – $25,000$120.00 for the first $2,000 + $7.40 per additional $1,000
$25,001 – $50,000$290.00 for the first $25,000 + $6.72 per additional $1,000
$50,001 – $100,000$458.00 for the first $50,000 + $4.48 per additional $1,000
Over $100,000$682.00 for the first $100,000 + $3.75 per additional $1,000

Added to every matching permit

  • Residential Certificate of Occupancy (charged at time of permit issuance): a flat $42.50 (Residential · new construction)

Surcharges

  • Oregon state surcharge: 12% of the permit fee

What counts as project value

Not stated in the schedule. Building permit fees are based on valuation ("Building permits fees based on valuation", residential worksheet), but the pages read do not say how valuation is determined (contract price vs a valuation table).

Worked example: a $350,000 new home

  1. Building permit fee: $682.00 for the first $100,000.00 + $3.75 × 250 per $1,000.00 over = $1,619.50
  2. Plan review fee: 65% of $1,619.50 = $1,052.68
  3. Residential Certificate of Occupancy (charged at time of permit issuance): flat fee = $42.50
  4. Oregon state surcharge: 12% of $1,619.50 = $194.34
  5. Total before trade permits: $2,909.02.

Fees people miss

May also apply (not in the totals above)

  • DTD technology fee: when if the DTD administration technology fee is charged on building permits; $5.00 on the standard projects.
FeeAmount
Metro construction excise (Metro surcharge)When: if within the Metro boundary $0.12 % of improvement value
School district construction exciseWhen: new residential floor area, per school district $1.26 per sq ft
Additional plan review for changes, additions or revisionsWhen: plan changes after approval $120.00 per hour (1 hour min)
ReinspectionWhen: reinspection $120.00 per hour
Inspections outside normal business hoursWhen: after-hours inspection $120.00 per hour + OT, 4 hour min
Phased project feeWhen: phased project $250.00 each phase
Deferred submittalWhen: deferred submittal $250.00 minimum
Permit reactivationWhen: expired permit 50% / 100% of new permit fee
Planning plan review for new single-family residenceWhen: new development reviewed by Planning $165.00 each building permit

Trade permits are separate. Electrical: Residential dwelling units incl. attached garage up to 1,000 sq ft $270, each additional 500 sq ft $55; limited energy $109; services/feeders by amperage; minimum and reinspection fee $120. Plumbing: 1&2 family new dwellings: 1 bath $761, 2 baths $864, 3 baths $956, each additional bath or kitchen $87; fixtures $31 each; minimum $120. Mechanical: 1&2 family mechanical minimum and reinspection fee $120; per-item fees (furnace to 100K BTU $18, heat pump $18, A/C $18, water heater $9, exhaust fan $9).

Will fees go up?

The schedule provides for a 3% adjustment annual. Appendix A: DTD fees adjust annually by the change in CPI for the Western US, up to 3%; fees over $50.01 round down to the nearest $1. Values here are as printed.

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to Clackamas County Building Codes Division through Development Direct.
  3. Pay the permit and plan review fees when invoiced.
  4. Questions: 503-742-4240 · 150 Beavercreek Road, Oregon City, OR 97045

How Clackamas County compares

A $25,000 remodel costs $513.65 in Clackamas County: 35% above the national median of $380.00, and the lowest of 5 places we cover in Oregon (state median $944.52).

A $75,000 addition costs $1,008.90 in Clackamas County: 23% above the national median of $820.58, and the lowest of 5 places we cover in Oregon (state median $2,058.24).

A $350,000 new home costs $2,909.02 in Clackamas County: about the same as the national median of $2,918.63, and the lowest of 5 places we cover in Oregon (state median $6,182.82).

Same standard projects everywhere, including plan review and required surcharges. All Oregon places · Compare side by side

Clackamas County permit fee FAQ

How much is a building permit in Clackamas County, OR?

A $25,000 remodel: $513.65. A $75,000 addition: $1,008.90. A $350,000 new single-family: $2,909.02. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Clackamas County permit fee?

No. Plan review is charged separately at 65% of the permit fee.

How does Clackamas County determine project value?

Not stated in the schedule. Building permit fees are based on valuation ("Building permits fees based on valuation", residential worksheet), but the pages read do not say how valuation is determined (contract price vs a valuation table).

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Electrical: Residential dwelling units incl. attached garage up to 1,000 sq ft $270, each additional 500 sq ft $55; limited energy $109; services/feeders by amperage; minimum and reinspection fee $120. Plumbing: 1&2 family new dwellings: 1 bath $761, 2 baths $864, 3 baths $956, each additional bath or kitchen $87; fixtures $31 each; minimum $120. Mechanical: 1&2 family mechanical minimum and reinspection fee $120; per-item fees (furnace to 100K BTU $18, heat pump $18, A/C $18, water heater $9, exhaust fan $9).

When did these Clackamas County fees take effect?

The schedule does not state an effective date. We last checked it against the official source on Nov 5, 2026.