Building Permit Fees in Portland, OR (2026)

Portland prices building permits with a fee table based on project value, with a $167.00 minimum, then charges plan review at 65% of the permit fee. Enter your project to see the exact math.

  • Official city schedule
  • Effective Jul 10, 2026
  • Verified Nov 4, 2026
Minimum fee
$167.00
Plan review
65%
$75k addition
$2,077

Permit fee calculator

Portland schedule, eff. Jul 10, 2026
Project type
Estimated permit fees $2,076.53
  1. 1. Building permit fee
    $797.28 for the first $50,000.00 + $6.81 × 25 per $1,000.00 over
    $967.53
  2. 2. Plan review fee
    65% of $967.53
    $628.89
  3. 3. Development Services Fee - Residential
    $192.01 for the first $50,000.00 + $1.88 × 25 per $1,000.00 over
    $239.01
  4. 4. Zoning Inspection Fee, 1 & 2 family dwellings
    flat fee
    $125.00
  5. 5. Affordable Housing Construction Excise Tax (1%)
    valuation under $100,000.00: $0.00
    $0.00
  6. 6. State of Oregon surcharge
    12% of $967.53
    $116.10

May also apply (not in the total)

  • Fire and Life Safety Review Fee
    When: when fire and life safety plan review is required (applicability not stated in the schedule; typically commercial)
    $387.01
  • Investigation fee (work before permit)
    When: work started without a permit
    $167.00

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$1,078.94
$540.78 building permit + $351.51 plan review + $121.76 development services fee - residential + $0.00 affordable housing construction excise tax (1%) + $64.89 state of oregon surcharge
Room addition
$75,000 value, addition 400 sq ft
$2,076.53
$967.53 building permit + $628.89 plan review + $239.01 development services fee - residential + $125.00 zoning inspection fee, 1 & 2 family dwellings + $0.00 affordable housing construction excise tax (1%) + $116.10 state of oregon surcharge
New single-family home
$350,000 value, new single-family 2,400 sq ft
$8,811.15
$2,545.28 building permit + $1,654.43 plan review + $681.01 development services fee - residential + $125.00 zoning inspection fee, 1 & 2 family dwellings + $3,500.00 affordable housing construction excise tax (1%) + $305.43 state of oregon surcharge

How Portland calculates your permit fee

The city charges a building permit fee using a fee table based on project value, with a $167.00 minimum. Plan review is a separate charge: 65% of the permit fee. Electrical, plumbing and mechanical work gets its own permits.

The fee table

Project valueFee
$1 – $500$167.00
$501 – $2,000$167.00 for the first $500 + $3.59 per additional $100 or fraction
$2,001 – $25,000$220.85 for the first $2,000 + $13.91 per additional $1,000 or fraction
$25,001 – $50,000$540.78 for the first $25,000 + $10.26 per additional $1,000 or fraction
$50,001 – $100,000$797.28 for the first $50,000 + $6.81 per additional $1,000 or fraction
Over $100,000$1,137.78 for the first $100,000 + $5.63 per additional $1,000 or fraction

Added to every matching permit

  • Development Services Fee - Residential: a fee table based on project value, with a $21.19 minimum (Residential)
  • Development Services Fee - Commercial: a fee table based on project value, with a $26.49 minimum (Commercial)
  • Zoning Inspection Fee, 1 & 2 family dwellings: a flat $125.00 (1 & 2 family new construction (and additions))
  • Affordable Housing Construction Excise Tax (1%): 1% of project value (a flat $0.00 below $100,000) (All projects)

Surcharges

  • State of Oregon surcharge: 12% of the permit fee

What counts as project value

Higher of your bid or the valuation table. Per OAR 918-050-0100: new construction and additions use the ICC Building Valuation Data table current as of April 1 of each year (occupancy and construction type x square footage, outside wall to outside wall); "The valuation used will be the greater of either the above calculated value or the value as stated by the applicant." Alterations and repairs use fair market value of all permitted work, including finish, MEP and contractor's profit.

Worked example: a $350,000 new home

  1. Building permit fee: $1,137.78 for the first $100,000.00 + $5.63 × 250 per $1,000.00 over = $2,545.28
  2. Plan review fee: 65% of $2,545.28 = $1,654.43
  3. Development Services Fee - Residential: $286.01 for the first $100,000.00 + $1.58 × 250 per $1,000.00 over = $681.01
  4. Zoning Inspection Fee, 1 & 2 family dwellings: flat fee = $125.00
  5. Affordable Housing Construction Excise Tax (1%): 1% of $350,000.00 = $3,500.00
  6. State of Oregon surcharge: 12% of $2,545.28 = $305.43
  7. Total before trade permits: $8,811.15.

Fees people miss

May also apply (not in the totals above)

  • Fire and Life Safety Review Fee: when when fire and life safety plan review is required (applicability not stated in the schedule; typically commercial); $216.31 on the standard projects.
  • Investigation fee (work before permit): when work started without a permit; $167.00 on the standard projects.
FeeAmount
Reinspection $167.00 per inspection
Additional plan review for changes/revisions, 1/2 hour or less $114.00 each
Additional plan review for changes/revisions, over 1/2 hour $228.00 per hour or fraction
Additional plan review checksheet (beyond 2) $336.00 each
Zoning Permit Fee, 1 & 2 family dwellings $48.00 each
Deferred submittal fee 10% of building permit fee on deferred portion
Inspections outside normal business hoursWhen: after-hours inspection requested $320.00 per hour
Permit reactivation (expired permit renewal) one half the new permit fee
Metro Construction Excise Tax see Oregon Metro
System Development Charges varies
Commercial Zoning Inspection FeeWhen: commercial permits requiring Planning/Zoning review $125.00 greater of 20% of building permit fee or $125

Trade permits are separate. Electrical: Separate Electrical Permit Fee Schedule effective July 10, 2026; not extracted. Plumbing: Separate Plumbing Permit Fee Schedule effective July 10, 2026; not extracted. Mechanical: Separate Mechanical Permit Fee Schedule effective July 10, 2026; not extracted.

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to Portland Permitting & Development (Development Services Center).
  3. Pay the permit and plan review fees when invoiced.
  4. Questions: 503-823-7300

How Portland compares

A $25,000 remodel costs $1,078.94 in Portland: about 2.8 times the national median of $380.00, and the 2nd highest of 5 places we cover in Oregon (state median $944.52).

A $75,000 addition costs $2,076.53 in Portland: about 2.5 times the national median of $820.58, and the 2nd highest of 5 places we cover in Oregon (state median $2,058.24).

A $350,000 new home costs $8,811.15 in Portland: about 3 times the national median of $2,918.63, and the highest of 5 places we cover in Oregon (state median $6,182.82).

Same standard projects everywhere, including plan review and required surcharges. All Oregon places · Compare side by side

Portland permit fee FAQ

How much is a building permit in Portland, OR?

A $25,000 remodel: $1,078.94. A $75,000 addition: $2,076.53. A $350,000 new single-family: $8,811.15. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Portland permit fee?

No. Plan review is charged separately at 65% of the permit fee.

How does Portland determine project value?

Higher of your bid or the valuation table. Per OAR 918-050-0100: new construction and additions use the ICC Building Valuation Data table current as of April 1 of each year (occupancy and construction type x square footage, outside wall to outside wall); "The valuation used will be the greater of either the above calculated value or the value as stated by the applicant." Alterations and repairs use fair market value of all permitted work, including finish, MEP and contractor's profit.

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Electrical: Separate Electrical Permit Fee Schedule effective July 10, 2026; not extracted. Plumbing: Separate Plumbing Permit Fee Schedule effective July 10, 2026; not extracted. Mechanical: Separate Mechanical Permit Fee Schedule effective July 10, 2026; not extracted.

When did these Portland fees take effect?

The schedule is effective Jul 10, 2026 (“Effective Date: July 10, 2026”). We last checked it against the official source on Nov 4, 2026.