BuildingPermitCost

Building Permit Fees in Jackson County, MO (2026)

Jackson County prices building permits with a fee table based on project value, with a $25.15 minimum. Enter your project to see the exact math.

  • Official county schedule
  • Effective Aug 9, 2023
  • Verified Nov 5, 2026
Minimum fee
$25.15
Plan review
None
$75k addition
$876

Permit fee calculator

Jackson County schedule, eff. Aug 9, 2023
Project type
Estimated permit fees $876.06
  1. 1. Building permit fee
    $688.81 for the first $50,000.00 + $7.49 × 25 per $1,000.00 over
    $876.06

May also apply (not in the total)

  • Work without a permit
    When: work started before a permit was obtained
    $876.06

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$418.64
$418.64 building permit
Room addition
$75,000 value, addition 400 sq ft
$876.06
$876.06 building permit
New single-family home
$350,000 value, new single-family 2,400 sq ft
$2,585.81
$2,560.81 building permit + $25.00 soil and erosion fee (single family dwelling)

How Jackson County calculates your permit fee

The county charges a building permit fee using a fee table based on project value, with a $25.15 minimum. Electrical, plumbing and mechanical work gets its own permits.

The fee table

Project valueFee
$1 – $500$25.15
$501 – $2,000$25.15 for the first $500 + $3.27 per additional $100 or fraction
$2,001 – $25,000$74.10 for the first $2,000 + $14.98 per additional $1,000 or fraction
$25,001 – $50,000$418.64 for the first $25,000 + $10.81 per additional $1,000 or fraction
$50,001 – $100,000$688.81 for the first $50,000 + $7.49 per additional $1,000 or fraction
$100,001 – $500,000$1,063.31 for the first $100,000 + $5.99 per additional $1,000 or fraction
$500,001 – $1,000,000$3,460.11 for the first $500,000 + $5.08 per additional $1,000 or fraction
Over $1,000,000$6,001.36 for the first $1,000,000 + $3.91 per additional $1,000 or fraction

Surcharges

  • Soil and erosion fee (single family dwelling): $25.00

What counts as project value

ICC Building Valuation Data table. Fee is based on the fair market value of the improvement as established by the most current building valuation data published by the code council (the code still cites the 'International Conference of Building Officials Standard Publication'). The permit packet says fees are based on square footage and estimated construction value from that data.

Worked example: a $350,000 new home

  1. Building permit fee: $1,063.31 for the first $100,000.00 + $5.99 × 250 per $1,000.00 over = $2,560.81
  2. Soil and erosion fee (single family dwelling): fixed = $25.00
  3. Total before trade permits: $2,585.81.

Fees people miss

May also apply (not in the totals above)

  • Work without a permit: when work started before a permit was obtained; $418.64 on the standard projects.
FeeAmount
Re-inspectionWhen: re-inspection $47.00 per hour
Inspection outside normal business hoursWhen: after-hours inspection requested $47.00 per hour, minimum 2 hours
Additional plan review for changes/revisionsWhen: changes to approved plans $47.00 per hour, minimum 1/2 hour
Outside consultant plan reviewWhen: outside consultant used actual cost
Soil & erosion control (land disturbance)When: land disturbance / development projects $500.00 plus $100 per acre of disturbed land

Trade permits are separate. Electrical: Residential electrical repair/upgrade $75 (commercial $150). Plumbing: Residential plumbing/gas repair $75 (commercial $150). Mechanical: Residential mechanical repair $75 (commercial $125).

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to Jackson County Public Works, Development Division.
  3. Pay the permit and plan review fees when invoiced.
  4. Questions: 816-881-4649 · Technology Center, 303 W. Walnut, Independence, MO 64050

How Jackson County compares

A $25,000 remodel costs $418.64 in Jackson County: 10% above the national median of $380.00.

A $75,000 addition costs $876.06 in Jackson County: 7% above the national median of $820.58.

A $350,000 new home costs $2,585.81 in Jackson County: 11% below the national median of $2,918.63.

Cities in Jackson County with their own fee schedule on this site: Independence, Lee's Summit. Inside those cities, check whether the city or the county issues your permit.

Same standard projects everywhere, including plan review and required surcharges. All Missouri places · Compare side by side

Jackson County permit fee FAQ

How much is a building permit in Jackson County, MO?

A $25,000 remodel: $418.64. A $75,000 addition: $876.06. A $350,000 new single-family: $2,585.81. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Jackson County permit fee?

Jackson County lists no separate plan review fee for these projects.

How does Jackson County determine project value?

ICC Building Valuation Data table. Fee is based on the fair market value of the improvement as established by the most current building valuation data published by the code council (the code still cites the 'International Conference of Building Officials Standard Publication'). The permit packet says fees are based on square footage and estimated construction value from that data.

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Electrical: Residential electrical repair/upgrade $75 (commercial $150). Plumbing: Residential plumbing/gas repair $75 (commercial $150). Mechanical: Residential mechanical repair $75 (commercial $125).

When did these Jackson County fees take effect?

The schedule is effective Aug 9, 2023 (“Jackson County Code Ch. 54, Sec. 5410.1 as amended by Ord. 5765, 08/09/23 (chapter dated August 9, 2023)”). We last checked it against the official source on Nov 5, 2026.