Independence prices building permits with a fee table based on project value, then charges plan review at a flat $80.00. Enter your project to see the exact math.

  • Official city schedule
  • Effective not stated
  • Verified Nov 5, 2026
Minimum fee
—
Plan review
Separate
$75k addition
$749

Permit fee calculator

Independence schedule
Project type
Estimated permit fees $748.75
  1. 1. Building permit fee
    $512.50 for the first $50,000.00 + $6.25 × 25 per $1,000.00 over
    $668.75
  2. 2. Plan review fee
    flat
    $80.00

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$371.25
$291.25 building permit + $80.00 plan review
Room addition
$75,000 value, addition 400 sq ft
$748.75
$668.75 building permit + $80.00 plan review
New single-family home
$350,000 value, new single-family 2,400 sq ft
$2,467.50
$2,387.50 building permit + $80.00 plan review

How Independence calculates your permit fee

The city charges a building permit fee using a fee table based on project value. Plan review is a separate charge: a flat $80.00. Electrical, plumbing and mechanical work gets its own permits.

The fee table

Building permit, residential

Project valueFee
$1 – $50,000$60.00 + $9.25 per additional $1,000 or fraction
$50,001 – $500,000$512.50 for the first $50,000 + $6.25 per additional $1,000 or fraction
Over $500,000$3,325.00 for the first $500,000 + $5.25 per additional $1,000 or fraction

Building permit, commercial

Project valueFee
$1 – $50,000$90.00 + $12.75 per additional $1,000 or fraction
$50,001 – $500,000$732.50 for the first $50,000 + $7.75 per additional $1,000 or fraction
Over $500,000$4,220.00 for the first $500,000 + $6.75 per additional $1,000 or fraction

What counts as project value

Your contract or bid price. Fees are by 'value of work' / 'total valuation'. The schedule does not say how valuation is determined.

Worked example: a $350,000 new home

  1. Building permit fee: $512.50 for the first $50,000.00 + $6.25 × 300 per $1,000.00 over = $2,387.50
  2. Plan review fee: flat = $80.00
  3. Total before trade permits: $2,467.50.

Fees people miss

May also apply (not in the totals above)

  • License Surcharge, single-family: when a new single-family dwelling outside the exempt areas of Western Independence; $1,414.00 on the standard projects.
FeeAmount
Certificate of Use & OccupancyWhen: certificate of use and occupancy issued $20.00 each
1st reinspectionWhen: reinspection required $20.00 each
2nd reinspectionWhen: second reinspection required $40.00 each
Residential site improvement plan review (Public Works)When: site improvement plan review required $30.00 each
Erosion control permitWhen: erosion control permit required $150.00 per acre
Right of way permitWhen: work in the right of way $80.00 each
Water tap fee, 3/4 inchWhen: new water tap $140.00 each

Trade permits are separate. Electrical: Plumbing, electrical and mechanical by value of work: $0-500 $40; $501-1,000 $50; $1,001-5,000 $65; $5,001 and over $80 for the first $5,000 plus $12.00 per additional $1,000 or fraction. Plumbing: Same value-of-work table as electrical. Mechanical: Same value-of-work table as electrical.

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to Community Development Department online through the permit portal.
  3. Pay the permit and plan review fees when invoiced.

How Independence compares

A $25,000 remodel costs $371.25 in Independence: about the same as the national median of $380.00.

A $75,000 addition costs $748.75 in Independence: 9% below the national median of $820.58.

A $350,000 new home costs $2,467.50 in Independence: 15% below the national median of $2,918.63.

Same standard projects everywhere, including plan review and required surcharges. All Missouri places · Compare side by side

Independence permit fee FAQ

How much is a building permit in Independence, MO?

A $25,000 remodel: $371.25. A $75,000 addition: $748.75. A $350,000 new single-family: $2,467.50. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Independence permit fee?

No. Plan review is charged separately at a flat $80.00.

How does Independence determine project value?

Your contract or bid price. Fees are by 'value of work' / 'total valuation'. The schedule does not say how valuation is determined.

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Electrical: Plumbing, electrical and mechanical by value of work: $0-500 $40; $501-1,000 $50; $1,001-5,000 $65; $5,001 and over $80 for the first $5,000 plus $12.00 per additional $1,000 or fraction. Plumbing: Same value-of-work table as electrical. Mechanical: Same value-of-work table as electrical.

When did these Independence fees take effect?

The schedule does not state an effective date. We last checked it against the official source on Nov 5, 2026.