BuildingPermitCost

Building Permit Fees in Canyon County, ID (2026)

Canyon County prices building permits with a fee table based on project value, with a $30.00 minimum, then charges plan review at 16% of the permit fee. Enter your project to see the exact math.

  • Official county schedule
  • Effective Mar 20, 2025
  • Verified Nov 5, 2026
Minimum fee
$30.00
Plan review
16%
$75k addition
$1,064

Permit fee calculator

Canyon County schedule, eff. Mar 20, 2025
Project type
Estimated permit fees $1,064.30
  1. 1. Building permit fee
    $630.00 for the first $50,000.00 + $11.50 × 25 per $1,000.00 over
    $917.50
  2. 2. Plan review fee
    16% of $917.50
    $146.80

May also apply (not in the total)

  • Permit issued after construction started
    When: work started before the permit was issued
    $917.50

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$440.80
$380.00 building permit + $60.80 plan review
Room addition
$75,000 value, addition 400 sq ft
$1,064.30
$917.50 building permit + $146.80 plan review
New single-family home
$350,000 value, new single-family 2,400 sq ft
$4,877.80
$4,205.00 building permit + $672.80 plan review

How Canyon County calculates your permit fee

The county charges a building permit fee using a fee table based on project value, with a $30.00 minimum. Plan review is a separate charge: 16% of the permit fee. Electrical, plumbing and mechanical work gets its own permits.

The fee table

Project valueFee
$1 – $1,000$30.00
$1,001 – $5,000$30.00 for the first $1,000 + $30.00 per additional $1,000 or fraction
$5,001 – $20,000$150.00 for the first $5,000 + $12.00 per additional $1,000 or fraction
$20,001 – $50,000$330.00 for the first $20,000 + $10.00 per additional $1,000 or fraction
$50,001 – $100,000$630.00 for the first $50,000 + $11.50 per additional $1,000 or fraction
$100,001 – $200,000$1,205.00 for the first $100,000 + $15.00 per additional $1,000 or fraction
$200,001 – $500,000$2,705.00 for the first $200,000 + $20.00 per additional $2,000 or fraction
$500,001 – $1,000,000$5,705.00 for the first $500,000 + $22.50 per additional $2,000 or fraction
$1,000,001 – $5,000,000$11,330.00 for the first $1,000,000 + $22.50 per additional $4,000 or fraction
Over $5,000,000$33,830.00 for the first $5,000,000 + $24.50 per additional $4,000 or fraction

What counts as project value

Local valuation table. Value is set by the Table 1-A Value Table (value per sq ft): single-family under 1,500 sf $71.60, >1,500 sf $78.60, >2,000 sf $82.32, upscale $86.76, brick $88.20, stucco $107.76, tile roof $109.68; attached garage $24.60; covered porches/patios $18.48; unfinished basement $17.52; additions (kitchen, baths, bedroom) $71.60; remodel & alteration = bid cost. Types not in the table use the total value of all construction work. Commercial/public may use the accepted bid amount.

Worked example: a $350,000 new home

  1. Building permit fee: $2,705.00 for the first $200,000.00 + $20.00 × 75 per $2,000.00 over = $4,205.00
  2. Plan review fee: 16% of $4,205.00 = $672.80
  3. Total before trade permits: $4,877.80.

Fees people miss

May also apply (not in the totals above)

  • Permit issued after construction started: when work started before the permit was issued; $380.00 on the standard projects.
FeeAmount
Plan review deposit (new dwellings and commercial)When: collected at application, credited to plan review fee $180.00 each
Fire district impact fee (new residential)When: new construction or added service units, depends on fire district per unit, by fire district
Inspection outside normal business hoursWhen: after-hours inspection $75.00 each
Re-inspection (2nd re-inspection for same item)When: re-inspection $75.00 each
Investigation inspection feeWhen: investigation $75.00 each
Appeal of Building Official determinationWhen: appeal $150.00 each

Trade permits are separate. Mechanical: Table 1-C mechanical installation inspections for one- and two-family dwellings: new single-family dwelling $180 (includes HVAC, water heater, bath fans, range hood, dryer vent, gas BBQ, one mini-split); new dwellings over 2,000 sq ft $300; new addition/remodel $60; retro installation $80; change-outs $60 each. Commercial mechanical (Table 1-D): 2% of bid cost, minimum $60. Electrical: Not issued by the county (State of Idaho DOPL per registry note; not verified). Plumbing: Not issued by the county (State of Idaho DOPL per registry note; not verified).

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to Canyon County Development Services Department.
  3. Pay the permit and plan review fees when invoiced.
  4. Questions: 208-402-4163 · 111 North 11th Avenue, #310, Caldwell, ID 83605

How Canyon County compares

A $25,000 remodel costs $440.80 in Canyon County: 16% above the national median of $380.00.

A $75,000 addition costs $1,064.30 in Canyon County: 30% above the national median of $820.58.

A $350,000 new home costs $4,877.80 in Canyon County: 67% above the national median of $2,918.63.

Same standard projects everywhere, including plan review and required surcharges. All Idaho places · Compare side by side

Canyon County permit fee FAQ

How much is a building permit in Canyon County, ID?

A $25,000 remodel: $440.80. A $75,000 addition: $1,064.30. A $350,000 new single-family: $4,877.80. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Canyon County permit fee?

No. Plan review is charged separately at 16% of the permit fee.

How does Canyon County determine project value?

Local valuation table. Value is set by the Table 1-A Value Table (value per sq ft): single-family under 1,500 sf $71.60, >1,500 sf $78.60, >2,000 sf $82.32, upscale $86.76, brick $88.20, stucco $107.76, tile roof $109.68; attached garage $24.60; covered porches/patios $18.48; unfinished basement $17.52; additions (kitchen, baths, bedroom) $71.60; remodel & alteration = bid cost. Types not in the table use the total value of all construction work. Commercial/public may use the accepted bid amount.

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Mechanical: Table 1-C mechanical installation inspections for one- and two-family dwellings: new single-family dwelling $180 (includes HVAC, water heater, bath fans, range hood, dryer vent, gas BBQ, one mini-split); new dwellings over 2,000 sq ft $300; new addition/remodel $60; retro installation $80; change-outs $60 each. Commercial mechanical (Table 1-D): 2% of bid cost, minimum $60. Electrical: Not issued by the county (State of Idaho DOPL per registry note; not verified). Plumbing: Not issued by the county (State of Idaho DOPL per registry note; not verified).

When did these Canyon County fees take effect?

The schedule is effective Mar 20, 2025 (“Resolution No. 25-046, effective March 20, 2025 (building page labels it 'effective 3/28/25')”). We last checked it against the official source on Nov 5, 2026.