BuildingPermitCost

Building Permit Fees in Ada County, ID (2026)

Ada County prices building permits with a fee table based on project value, with a $65.00 minimum, then charges plan review at 50% of the permit fee. Enter your project to see the exact math.

  • Official county schedule
  • Effective Nov 25, 2025
  • Verified Nov 5, 2026
Minimum fee
$65.00
Plan review
50%
$75k addition
$927

Permit fee calculator

Ada County schedule, eff. Nov 25, 2025
Project type
Estimated permit fees $927.00
  1. 1. Building permit fee
    $493.00 for the first $50,000.00 + $5.00 × 25 per $1,000.00 over
    $618.00
  2. 2. Plan review fee
    50% of $618.00
    $309.00

May also apply (not in the total)

  • Credit card convenience fee
    When: paying by credit card
    $22.25

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$477.00
$318.00 building permit + $159.00 plan review
Room addition
$75,000 value, addition 400 sq ft
$927.00
$618.00 building permit + $309.00 plan review
New single-family home
$350,000 value, new single-family 2,400 sq ft
$2,670.75
$1,780.50 building permit + $890.25 plan review

How Ada County calculates your permit fee

The county charges a building permit fee using a fee table based on project value, with a $65.00 minimum. Plan review is a separate charge: 50% of the permit fee. Electrical, plumbing and mechanical work gets its own permits.

The fee table

Project valueFee
$1 – $2,000$65.00
$2,001 – $25,000$65.00 for the first $2,000 + $11.00 per additional $1,000 or fraction
$25,001 – $50,000$318.00 for the first $25,000 + $7.00 per additional $1,000 or fraction
$50,001 – $100,000$493.00 for the first $50,000 + $5.00 per additional $1,000 or fraction
$100,001 – $1,000,000$743.00 for the first $100,000 + $4.15 per additional $1,000 or fraction
Over $1,000,000$4,478.00 for the first $1,000,000 + $2.60 per additional $1,000 or fraction

Surcharges

  • Accessibility plan review (IBC): 25% of the plan review fee
  • Energy plan review (IBC): 25% of the plan review fee

What counts as project value

Higher of your bid or the valuation table. Fees are based on the total valuation of the construction work: square foot construction costs from the most recent Building Safety Journal Building Valuation Data (BVD), or applicant's value, whichever is higher; BVD costs may be adjusted by a Regional Cost Modifier from Assessor records.

Worked example: a $350,000 new home

  1. Building permit fee: $743.00 for the first $100,000.00 + $4.15 × 250 per $1,000.00 over = $1,780.50
  2. Plan review fee: 50% of $1,780.50 = $890.25
  3. Total before trade permits: $2,670.75.

Fees people miss

May also apply (not in the totals above)

  • Credit card convenience fee: when paying by credit card; $11.45 on the standard projects.
  • Grading & drainage, single-family dwelling or work on single lot/parcel: when a single-family dwelling or lot work requires grading & drainage review; $500.00 on the standard projects.
FeeAmount
General inspections (minimum fee)When: general inspection requested $100.00 each
Reinspection (after first reinspection), per inspection typeWhen: second or later reinspection $100.00 each
Plan review changes/revisions (minimum)When: plan revisions $100.00 each
Building Division administrative fee (location changes)When: location change $100.00 each
Appeal of Building Official decisionWhen: appeal filed $150.00 each
Manufactured home installation permit, per sectionWhen: manufactured home $120.00 per section
Grading & drainage, disturbance of one acre or lessWhen: land disturbance one acre or less $100.00 each
Grading & drainage, new residential subdivision or commercial projectWhen: subdivision or commercial project $1,500.00 each
Development impact fees separate schedule

Trade permits are separate. Mechanical: Residential: $35 base permit fee plus $25 each furnace/AC/heat pump/boiler etc., $15 each exhaust/ventilation duct, mini-split head, fireplace, $5 per fuel gas outlet. Commercial: $35 plus 2% of total mechanical job value. Electrical: Not on the county Building Division fee schedule; issuing agency not stated in the source. Plumbing: Not on the county Building Division fee schedule; issuing agency not stated in the source.

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to Ada County Development Services, Building Division.
  3. Pay the permit and plan review fees when invoiced.
  4. Questions: 200 W Front St, Boise, ID

How Ada County compares

A $25,000 remodel costs $477.00 in Ada County: 26% above the national median of $380.00.

A $75,000 addition costs $927.00 in Ada County: 13% above the national median of $820.58.

A $350,000 new home costs $2,670.75 in Ada County: 8% below the national median of $2,918.63.

Cities in Ada County with their own fee schedule on this site: Boise. Inside those cities, check whether the city or the county issues your permit.

Same standard projects everywhere, including plan review and required surcharges. All Idaho places · Compare side by side

Ada County permit fee FAQ

How much is a building permit in Ada County, ID?

A $25,000 remodel: $477.00. A $75,000 addition: $927.00. A $350,000 new single-family: $2,670.75. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Ada County permit fee?

No. Plan review is charged separately at 50% of the permit fee.

How does Ada County determine project value?

Higher of your bid or the valuation table. Fees are based on the total valuation of the construction work: square foot construction costs from the most recent Building Safety Journal Building Valuation Data (BVD), or applicant's value, whichever is higher; BVD costs may be adjusted by a Regional Cost Modifier from Assessor records.

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Mechanical: Residential: $35 base permit fee plus $25 each furnace/AC/heat pump/boiler etc., $15 each exhaust/ventilation duct, mini-split head, fireplace, $5 per fuel gas outlet. Commercial: $35 plus 2% of total mechanical job value. Electrical: Not on the county Building Division fee schedule; issuing agency not stated in the source. Plumbing: Not on the county Building Division fee schedule; issuing agency not stated in the source.

When did these Ada County fees take effect?

The schedule is effective Nov 25, 2025 (“Resolution No. 3149, approved and adopted 25 November 2025, effective on adoption”). We last checked it against the official source on Nov 5, 2026.