Boise prices building permits with a fee table based on project value, then charges plan review at 20% of the permit fee. Enter your project to see the exact math.

  • Official city schedule
  • Effective not stated
  • Verified Nov 4, 2026
Minimum fee
—
Plan review
20%
$75k addition
$905

Permit fee calculator

Boise schedule
Project type
Estimated permit fees $904.86
  1. 1. Building permit fee
    $595.30 for the first $50,000.00 + $6.35 × 25 per $1,000.00 over
    $754.05
  2. 2. Plan review fee
    20% of $754.05
    $150.81

May also apply (not in the total)

  • Special investigation fee (work begun before permit issued)
    When: Only when work commences before a building permit is issued
    $754.05

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$435.71
$363.09 building permit + $72.62 plan review
Room addition
$75,000 value, addition 400 sq ft
$904.86
$754.05 building permit + $150.81 plan review
New single-family home
$350,000 value, new single-family 2,400 sq ft
$2,646.71
$2,205.59 building permit + $441.12 plan review

How Boise calculates your permit fee

The city charges a building permit fee using a fee table based on project value. Plan review is a separate charge: 20% of the permit fee. Electrical, plumbing and mechanical work gets its own permits.

The fee table

Project valueFee
$1 – $500$26.37
$501 – $2,000$26.37 for the first $500 + $2.95 per additional $100 or fraction
$2,001 – $25,000$70.76 for the first $2,000 + $12.71 per additional $1,000 or fraction
$25,001 – $50,000$362.80 for the first $25,000 + $9.30 per additional $1,000 or fraction
$50,001 – $100,000$595.30 for the first $50,000 + $6.35 per additional $1,000 or fraction
Over $100,000$913.09 for the first $100,000 + $5.17 per additional $1,000 or fraction

What counts as project value

Not stated in the schedule. Table No. 1-A is based on 'TOTAL VALUATION'; the schedule does not say how valuation is determined. Commercial solar PV: valuation halved before applying Table 1-A. Commercial Grading & Drainage with Utilities: Table 1-A on 50% of total valuation.

Worked example: a $350,000 new home

  1. Building permit fee: $913.09 for the first $100,000.00 + $5.17 × 250 per $1,000.00 over = $2,205.59
  2. Plan review fee: 20% of $2,205.59 = $441.12
  3. Total before trade permits: $2,646.71.

Fees people miss

May also apply (not in the totals above)

  • Special investigation fee (work begun before permit issued): when Only when work commences before a building permit is issued; $363.09 on the standard projects.
FeeAmount
After hours inspectionWhen: Only when after-hours inspection requested $86.00 per hour
Reinspection fee (first)When: Only on reinspection $75.00 each
Reinspection fee (second)When: Only on reinspection $150.00 each
Reinspection fee (third and subsequent)When: Only on reinspection $225.00 each
Inspections for which no fee is specifically indicated $57.00 per hour
Energy Code Inspection Fee $57.00 each
Additional plan review after third review / post-issuance revisions, residentialWhen: Only after third review or for revisions $57.00 per hour
Additional plan review after third review / post-issuance revisions, commercial/multi-family/fireWhen: Only after third review or for revisions $67.50 per hour
Certificate of occupancy review (no construction other than minor trade work) $181.00 each
Multi-phased temporary certificate of occupancy review $300.00 each
Clerical administrative fee (reactivation, voiding, refunds, plan modifications) $36.00 per hour
Appeal fee $155.50 each
2 more fees
  • Fire sprinkler / alternative extinguishing system plan review and inspection permit: $181.00 base fee
  • Fire alarm system plan review and inspection permit: $181.00 base fee

Trade permits are separate. Electrical: Separate Electrical Code fee schedule; not extracted. Plumbing: Separate schedule; not extracted. Mechanical: Separate Mechanical Code & Fuel Gas fee schedule; not extracted.

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to Planning and Development Services, Building Division.
  3. Pay the permit and plan review fees when invoiced.

How Boise compares

A $25,000 remodel costs $435.71 in Boise: 15% above the national median of $380.00.

A $75,000 addition costs $904.86 in Boise: 10% above the national median of $820.58.

A $350,000 new home costs $2,646.71 in Boise: 9% below the national median of $2,918.63.

Same standard projects everywhere, including plan review and required surcharges. All Idaho places · Compare side by side

Boise permit fee FAQ

How much is a building permit in Boise, ID?

A $25,000 remodel: $435.71. A $75,000 addition: $904.86. A $350,000 new single-family: $2,646.71. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Boise permit fee?

No. Plan review is charged separately at 20% of the permit fee.

How does Boise determine project value?

Not stated in the schedule. Table No. 1-A is based on 'TOTAL VALUATION'; the schedule does not say how valuation is determined. Commercial solar PV: valuation halved before applying Table 1-A. Commercial Grading & Drainage with Utilities: Table 1-A on 50% of total valuation.

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Electrical: Separate Electrical Code fee schedule; not extracted. Plumbing: Separate schedule; not extracted. Mechanical: Separate Mechanical Code & Fuel Gas fee schedule; not extracted.

When did these Boise fees take effect?

The schedule does not state an effective date. We last checked it against the official source on Nov 4, 2026.