BuildingPermitCost

Building Permit Fees in Thornton, CO (2026)

Thornton prices building permits with a fee table based on project value, with a $30.00 minimum, then charges plan review at 65% of the permit fee. Enter your project to see the exact math.

  • Official city schedule
  • Effective Jan 1, 2026
  • Verified Nov 5, 2026
Minimum fee
$30.00
Plan review
65%
$75k addition
$1,370

Permit fee calculator

Thornton schedule, eff. Jan 1, 2026
Project type
Estimated permit fees $1,369.91
  1. 1. Building permit fee
    $650.25 for the first $50,000.00 + $7.20 × 25 per $1,000.00 over
    $830.25
  2. 2. Plan review fee
    65% of $830.25
    $539.66

May also apply (not in the total)

  • Trade permit fee per trade (plumbing, mechanical, electrical) on non-new-residential permits
    When: building permits that include plumbing, mechanical or electrical work (other than new residential buildings)
    $30.00

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$671.47
$406.95 building permit + $264.52 plan review
Room addition
$75,000 value, addition 400 sq ft
$1,369.91
$830.25 building permit + $539.66 plan review
New single-family home
$350,000 value, new single-family 2,400 sq ft
$4,122.29
$2,437.75 building permit + $1,584.54 plan review + $100.00 mechanical, electrical & plumbing permit fees, new single family dwelling

How Thornton calculates your permit fee

The city charges a building permit fee using a fee table based on project value, with a $30.00 minimum. Plan review is a separate charge: 65% of the permit fee.

The fee table

Project valueFee
$1 – $500$30.00
$501 – $2,000$30.00 for the first $500 + $3.15 per additional $100 or fraction
$2,001 – $25,000$75.75 for the first $2,000 + $14.40 per additional $1,000 or fraction
$25,001 – $50,000$397.75 for the first $25,000 + $10.40 per additional $1,000 or fraction
$50,001 – $100,000$650.25 for the first $50,000 + $7.20 per additional $1,000 or fraction
$100,001 – $500,000$1,000.25 for the first $100,000 + $5.75 per additional $1,000 or fraction
$500,001 – $1,000,000$3,240.25 for the first $500,000 + $4.90 per additional $1,000 or fraction
Over $1,000,000$5,615.25 for the first $1,000,000 + $3.75 per additional $1,000 or fraction

Added to every matching permit

  • Mechanical, electrical & plumbing permit fees, new single family dwelling: a flat $100.00 (New single family dwelling)

What counts as project value

ICC Building Valuation Data table. Valuation is the estimated replacement cost including labor, materials, overhead and profit. New construction valuation may be calculated on square footage using the ICC tables. Remodel/renovation/alteration value = labor plus material cost, or material cost x 2.

Worked example: a $350,000 new home

  1. Building permit fee: $1,000.25 for the first $100,000.00 + $5.75 × 250 per $1,000.00 over = $2,437.75
  2. Plan review fee: 65% of $2,437.75 = $1,584.54
  3. Mechanical, electrical & plumbing permit fees, new single family dwelling: flat fee = $100.00
  4. Total before trade permits: $4,122.29.

Fees people miss

May also apply (not in the totals above)

  • Trade permit fee per trade (plumbing, mechanical, electrical) on non-new-residential permits: when building permits that include plumbing, mechanical or electrical work (other than new residential buildings); $30.00 on the standard projects.
FeeAmount
Use tax $3.75 % of 50% of valuation or of 100% of total material cost
Water/sewer connection feesWhen: new connections see Utility Billing
Multi-family / townhouse MEP feeWhen: multi-family or townhouse new buildings $25.00 per unit ($100 minimum)
Additional plan review for changes/revisionsWhen: plan revisions $75.00 each
ReinspectionWhen: reinspection $75.00 each
Work without a permit investigation feeWhen: work without permit equal to building permit fee ($75/hr minimum)
Temporary Certificate of Occupancy, residential (IRC)When: TCO requested $750.00 each
Building permit transferWhen: transfer $75.00 each
Construction meterWhen: when required $25.00 each
Lawn sprinkler/backflow (new residential or commercial)When: lawn sprinkler/backflow $15.00 each
Sanitary sewer, 1 unitWhen: sewer permit $11.00 each

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to Building Inspection Division, City Development online through Thornton permits portal.
  3. Pay the permit and plan review fees when invoiced.
  4. Questions: 303-538-7250 · 9500 Civic Center Drive, Thornton, CO

How Thornton compares

A $25,000 remodel costs $671.47 in Thornton: 77% above the national median of $380.00, and the 4th highest of 15 places we cover in Colorado (state median $531.00).

A $75,000 addition costs $1,369.91 in Thornton: 67% above the national median of $820.58, and the 4th highest of 15 places we cover in Colorado (state median $1,174.21).

A $350,000 new home costs $4,122.29 in Thornton: 41% above the national median of $2,918.63, and the 7th highest of 15 places we cover in Colorado (state median $3,972.62).

Same standard projects everywhere, including plan review and required surcharges. All Colorado places · Compare side by side

Thornton permit fee FAQ

How much is a building permit in Thornton, CO?

A $25,000 remodel: $671.47. A $75,000 addition: $1,369.91. A $350,000 new single-family: $4,122.29. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Thornton permit fee?

No. Plan review is charged separately at 65% of the permit fee.

How does Thornton determine project value?

ICC Building Valuation Data table. Valuation is the estimated replacement cost including labor, materials, overhead and profit. New construction valuation may be calculated on square footage using the ICC tables. Remodel/renovation/alteration value = labor plus material cost, or material cost x 2.

When did these Thornton fees take effect?

The schedule is effective Jan 1, 2026 (“Building Permit Fee Schedule 2026, Effective: January 1, 2026 (Updated 11/25/2025)”). We last checked it against the official source on Nov 5, 2026.