Building Permit Fees in Boulder, CO (2026)

Boulder prices building permits with a fee table based on project value, with a $25.00 minimum, then charges plan review at 25% of the permit fee. Enter your project to see the exact math.

  • Official city schedule
  • Effective not stated
  • Verified Nov 5, 2026
Minimum fee
$25.00
Plan review
25%
$75k addition
$1,174

Permit fee calculator

Boulder schedule
Project type
Estimated permit fees $1,174.21
  1. 1. Building permit fee
    $686.00 for the first $50,000.00 + $7.45 × 25 per $1,000.00 over
    $872.25
  2. 2. Plan review fee
    25% of $872.25
    $218.06
  3. 3. Energy Code Fee (residential)
    flat fee
    $83.90

May also apply (not in the total)

  • Affordable Housing Fee (expansion of existing and replacement single-unit dwellings)
    When: expansion of an existing single-unit dwelling or a replacement single-unit dwelling (applicability rules and exemptions per B.R.C. not stated on the schedule)
    $4,400.00

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$522.31
$417.85 building permit + $104.46 plan review
Room addition
$75,000 value, addition 400 sq ft
$1,174.21
$872.25 building permit + $218.06 plan review + $83.90 energy code fee (residential)
New single-family home
$350,000 value, new single-family 2,400 sq ft
$13,550.03
$2,546.50 building permit + $636.63 plan review + $83.90 energy code fee (residential) + $10,283.00 capital facility impact fees (residential, per dwelling unit by unit size)

How Boulder calculates your permit fee

The city charges a building permit fee using a fee table based on project value, with a $25.00 minimum. Plan review is a separate charge: 25% of the permit fee. Electrical, plumbing and mechanical work gets its own permits.

The fee table

Project valueFee
$1 – $500$25.00
$501 – $2,000$25.00 for the first $500 + $3.25 per additional $100 or fraction
$2,001 – $25,000$74.00 for the first $2,000 + $14.95 per additional $1,000 or fraction
$25,001 – $50,000$418.00 for the first $25,000 + $10.75 per additional $1,000 or fraction
$50,001 – $100,000$686.00 for the first $50,000 + $7.45 per additional $1,000 or fraction
$100,001 – $500,000$1,059.00 for the first $100,000 + $5.95 per additional $1,000 or fraction
$500,001 – $1,000,000$3,447.00 for the first $500,000 + $5.05 per additional $1,000 or fraction
Over $1,000,000$5,979.00 for the first $1,000,000 + $3.85 per additional $1,000 or fraction

Added to every matching permit

  • Energy Code Fee (residential): a flat $83.90 (Residential new construction and additions)
  • Energy Code Fee (commercial): a flat $104.05 (Commercial new construction and additions)
  • Capital Facility Impact Fees (residential, per dwelling unit by unit size): a fee table based on floor area (New dwelling unit)

What counts as project value

Higher of your bid or the valuation table. Valuation is the higher of the City of Boulder Valuation Table (square-foot costs based on August 2025 ICC cost data) or the applicant's estimated value of the work. Scope factors applied to the table: new and additions 100%, alterations/repairs/tenant finish/basement finish 50%, core and shell 75%; unfinished basement $31.50 per sq ft. R-3 single family V-B: $170.80 per sq ft.

Worked example: a $350,000 new home

  1. Building permit fee: $1,059.00 for the first $100,000.00 + $5.95 × 250 per $1,000.00 over = $2,546.50
  2. Plan review fee: 25% of $2,546.50 = $636.63
  3. Energy Code Fee (residential): flat fee = $83.90
  4. Capital Facility Impact Fees (residential, per dwelling unit by unit size): table value for 2,400 sq ft: $10,283.00 = $10,283.00
  5. Total before trade permits: $13,550.03.

Fees people miss

May also apply (not in the totals above)

  • Affordable Housing Fee (expansion of existing and replacement single-unit dwellings): when expansion of an existing single-unit dwelling or a replacement single-unit dwelling (applicability rules and exemptions per B.R.C. not stated on the schedule); $4,400.00 on the standard projects.
FeeAmount
Construction and Demolition Deposit administrative feeWhen: permit requires a construction/demolition waste deposit (IBC 3601.2.3 / IRC R328.2.3) $219.00 each
Reinspection FeeWhen: reinspection $94.00 per occurrence
After-Hours Inspection FeeWhen: after-hours inspection $123.00 per hour, 2-hour minimum
Temporary Certificate of Occupancy FeeWhen: TCO requested $173.70 each
Construction use tax pre-payment city 3.860% + county 1.335% on material valuation (50% of total valuation for building permits)
Work without permitWhen: work started or completed without an approved permit building permit fee doubled
Development Excise Tax - TransportationWhen: new dwelling unit or new nonresidential floor area $4,826.22 per detached dwelling unit (attached unit or mobile home $3,501.50; nonresidential $2.48 per sq ft)

Trade permits are separate. Electrical: Residential (one- and two-unit dwellings and townhomes, new, remodels, additions) by enclosed living area: <500 sf $36.70; 500-999 sf $51.75; 1,000-1,499 sf $69.60; 1,500-1,999 sf $90.25; 2,000 sf or more $90.25 + $5.90 per 100 sf over 2,000 sf. Nonresidential/multifamily by cost of labor and materials (minimum $42.85). Mechanical: Mechanical and plumbing fees by valuation (minimum $13.60 for up to $100); not extracted. Plumbing: By plumbing valuation; not extracted.

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to City of Boulder Planning & Development Services.
  3. Pay the permit and plan review fees when invoiced.
  4. Questions: 303-441-1880 · 1101 Arapahoe Avenue, Boulder, CO 80302

How Boulder compares

A $25,000 remodel costs $522.31 in Boulder: 37% above the national median of $380.00, and the 7th lowest of 15 places we cover in Colorado (state median $531.00).

A $75,000 addition costs $1,174.21 in Boulder: 43% above the national median of $820.58, and the 8th lowest of 15 places we cover in Colorado (state median $1,174.21).

A $350,000 new home costs $13,550.03 in Boulder: about 4.6 times the national median of $2,918.63, and the highest of 15 places we cover in Colorado (state median $3,972.62).

Same standard projects everywhere, including plan review and required surcharges. All Colorado places · Compare side by side

Boulder permit fee FAQ

How much is a building permit in Boulder, CO?

A $25,000 remodel: $522.31. A $75,000 addition: $1,174.21. A $350,000 new single-family: $13,550.03. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Boulder permit fee?

No. Plan review is charged separately at 25% of the permit fee.

How does Boulder determine project value?

Higher of your bid or the valuation table. Valuation is the higher of the City of Boulder Valuation Table (square-foot costs based on August 2025 ICC cost data) or the applicant's estimated value of the work. Scope factors applied to the table: new and additions 100%, alterations/repairs/tenant finish/basement finish 50%, core and shell 75%; unfinished basement $31.50 per sq ft. R-3 single family V-B: $170.80 per sq ft.

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Electrical: Residential (one- and two-unit dwellings and townhomes, new, remodels, additions) by enclosed living area: <500 sf $36.70; 500-999 sf $51.75; 1,000-1,499 sf $69.60; 1,500-1,999 sf $90.25; 2,000 sf or more $90.25 + $5.90 per 100 sf over 2,000 sf. Nonresidential/multifamily by cost of labor and materials (minimum $42.85). Mechanical: Mechanical and plumbing fees by valuation (minimum $13.60 for up to $100); not extracted. Plumbing: By plumbing valuation; not extracted.

When did these Boulder fees take effect?

The schedule does not state an effective date. We last checked it against the official source on Nov 5, 2026.