How Waukesha calculates your permit fee
The city charges a building permit fee using $0.41 per square foot, with a $125.00 minimum. Plan review is a separate charge: a flat $315.00. Electrical, plumbing and mechanical work gets its own permits.
The fee table
Residential 1 & 2 family: new structure, addition, alteration, attached garage
$0.41 per square foot, with a $125.00 minimum.
Business, institutional and office
$0.39 per square foot, with a $125.00 minimum.
Added to every matching permit
- Assessor fee (residential new single-family): a flat $150.00 (Residential · new construction)
- Assessor fee (residential alteration/addition): a flat $10.00 (Residential · additions, remodels and alterations)
- Occupancy permit (residential 1 & 2 family new construction): a flat $60.00 (Residential · new construction)
What counts as project value
Floor area (square feet). Building permit fees are per square foot ('$0.41/sf.' for residential 1 & 2 family). '$14 per $1,000 Valuation' only for buildings/structures 'where square feet or cubic contents cannot be calculated'; how that valuation is determined is not stated.
Worked example: a $350,000 new home
- Building permit fee: 2,400 sq ft × $0.41 = $984.00
- Plan review fee: flat = $315.00
- Assessor fee (residential new single-family): flat fee = $150.00
- Occupancy permit (residential 1 & 2 family new construction): flat fee = $60.00
- Total before trade permits: $1,509.00.
Fees people miss
May also apply (not in the totals above)
- Wisconsin Uniform Building Permit Seal: when a Wisconsin Uniform Building Permit seal is issued for the permit; $35.00 on the standard projects.
| Fee | Amount |
|---|---|
| Reinspection feeWhen: failed or extra inspection | $120.00 each |
| Work started without permitWhen: work started before permit issued | 2 times permit fee total |
| Expired permit renewalWhen: renewal of expired permit | 50% of expiring permit fee total |
| Erosion Control, Grading and Driveway Permit (residential 1 & 2 family)When: separate erosion control/grading/driveway permit | $175.00 each |
| Expedited priority plan reviewWhen: applicant requests priority review | 200% of the plan review fees |
| Minor plan revisionWhen: minor revision to reviewed/approved plans | $75.00 each |
| Impact fees, new single-family residence (parks $3,301, library $109, police $484, wastewater $1,593 per REC)When: new dwelling units | per residence |
Trade permits are separate. Electrical: Residential new/additions/alterations: $100 base fee plus $0.16/sqft; rewires/repairs residential $75 base plus $30 each. Minimum permit fee $125. Plumbing: Residential new/addition/alteration: $125 base fee plus 0.25/sqft; replacement/repairs residential $75 base plus $30 each. Minimum permit fee $125. Mechanical: HVAC residential 1 & 2 family: A/C, split units, furnace, boiler $60 per unit; distribution system $0.03/s.f. Minimum permit fee $125.
How to apply
- Gather your plans and your project's total value and floor area.
- Submit to Community Development, Building Inspection Division.
- Pay the permit and plan review fees when invoiced.