BuildingPermitCost

Building Permit Fees in Gwinnett County, GA (2026)

Gwinnett County prices building permits with $4.00 per $1,000 of project value. Enter your project to see the exact math.

  • Official county schedule
  • Effective Aug 25, 2026
  • Verified Nov 4, 2026
Minimum fee
—
Plan review
None
$75k addition
$300

Permit fee calculator

Gwinnett County schedule, eff. Aug 25, 2026
Project type
Estimated permit fees $300.00
  1. 1. Building permit fee
    $75,000.00 ÷ 1,000 × $4.00
    $300.00

May also apply (not in the total)

  • Green building / solar / EV charger credit
    When: LEED / EarthCraft certified construction, or solar panel / EV charger installation
    $15.00

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$125.00
$125.00 building permit
Room addition
$75,000 value, addition 400 sq ft
$300.00
$300.00 building permit
New single-family home
$350,000 value, new single-family 2,400 sq ft
$1,400.00
$1,400.00 building permit

How Gwinnett County calculates your permit fee

The county charges a building permit fee using $4.00 per $1,000 of project value.

The fee table

New complete building construction (and additions)

$4.00 per $1,000 of project value.

Residential renovation

$4.00 per $1,000 of project value (a flat $125.00 below $75,000).

Non-residential renovation

$4.00 per $1,000 of project value (a flat $150.00 below $75,000).

What counts as project value

ICC Building Valuation Data table. New complete building construction: construction cost from the ICC Building Valuation Data for the construction type and occupancy group x total square feet of construction; fee = construction cost x 0.004. Shell-only construction is based on 50% of the calculated building valuation. Renovations use construction value.

Worked example: a $350,000 new home

  1. Building permit fee: $350,000.00 ÷ 1,000 × $4.00 = $1,400.00
  2. Total before trade permits: $1,400.00.

Fees people miss

May also apply (not in the totals above)

  • Green building / solar / EV charger credit: when LEED / EarthCraft certified construction, or solar panel / EV charger installation; $6.25 on the standard projects.
FeeAmount
Temporary Certificate of OccupancyWhen: requested $50.00 each
Building permit extensionWhen: extension requested $25.00 each
Renewal fee for expired building permitsWhen: expired permit $50.00 each
Mobile homeWhen: mobile home $75.00 each
Tenant change permitWhen: tenant change $120.00 each
Reinspection, second follow-upWhen: failed inspection $50.00 each
Plan resubmittal (after third review prior to permit issuance)When: more than three reviews 25% of total building permit fee
Plan revision after permit issuance, 1-10 sheetsWhen: revisions after issuance $50.00 each
Construction prior to issuance of permitWhen: work started without a permit 100% of the permit fee

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to Gwinnett County Department of Planning and Development.
  3. Pay the permit and plan review fees when invoiced.

How Gwinnett County compares

A $25,000 remodel costs $125.00 in Gwinnett County: 67% below the national median of $380.00, and the 2nd lowest of 6 places we cover in Georgia (state median $165.00).

A $75,000 addition costs $300.00 in Gwinnett County: 63% below the national median of $820.58, and the 2nd lowest of 8 places we cover in Georgia (state median $509.30).

A $350,000 new home costs $1,400.00 in Gwinnett County: 52% below the national median of $2,918.63, and the 2nd lowest of 10 places we cover in Georgia (state median $2,100.00).

Same standard projects everywhere, including plan review and required surcharges. All Georgia places · Compare side by side

Gwinnett County permit fee FAQ

How much is a building permit in Gwinnett County, GA?

A $25,000 remodel: $125.00. A $75,000 addition: $300.00. A $350,000 new single-family: $1,400.00. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Gwinnett County permit fee?

Gwinnett County lists no separate plan review fee for these projects.

How does Gwinnett County determine project value?

ICC Building Valuation Data table. New complete building construction: construction cost from the ICC Building Valuation Data for the construction type and occupancy group x total square feet of construction; fee = construction cost x 0.004. Shell-only construction is based on 50% of the calculated building valuation. Renovations use construction value.

When did these Gwinnett County fees take effect?

The schedule is effective Aug 25, 2026 (“Building Permit Fees (Effective August 25, 2026)”). We last checked it against the official source on Nov 4, 2026.