How Alpharetta calculates your permit fee
The city charges a building permit fee using $5.50 per $1,000 of project value, with a $50.00 minimum. Plan review is a separate charge: $2.75 per $1,000 of project value (minimum $25.00). Electrical, plumbing and mechanical work gets its own permits.
The fee table
Residential building permits
$5.50 per $1,000 of project value, with a $50.00 minimum.
Commercial new buildings and additions
$5.50 per $1,000 of project value, with a $50.00 minimum.
Added to every matching permit
- Erosion Inspection Fee: a flat $85.00 (Residential · new construction, additions)
- Certificate of Occupancy (CO) Fee: a flat $100.00 (Residential)
- Commercial CO / CC Fee: $0.05 per square foot, with a $200.00 minimum (Commercial · new construction, additions)
What counts as project value
ICC Building Valuation Data table. Residential: 'The most current ICC BVD is utilized in determining the Construction Cost per square foot.' Commercial new buildings and additions use the most current ICC BVD; work not covered by BVD tables (second-generation interior finishes, demolition, retaining walls, towers) uses a notarized construction cost letter.
Worked example: a $350,000 new home
- Building permit fee: $350,000.00 ÷ 1,000 × $5.50 = $1,925.00
- Plan review fee: $350,000.00 ÷ 1,000 × $2.75 = $962.50
- Erosion Inspection Fee: flat fee = $85.00
- Certificate of Occupancy (CO) Fee: flat fee = $100.00
- Total before trade permits: $3,072.50.
Fees people miss
May also apply (not in the totals above)
- Sewer Inspection Fee: when a new sewer connection is made (per connection); $35.00 on the standard projects.
| Fee | Amount |
|---|---|
| Certificate of Completion (CC) Fee, residential non-habitable structuresWhen: structure not designed for human habitation | $100.00 each |
| Impact feesWhen: new construction and relocated dwellings |
Trade permits are separate. Electrical: Separate permit; fee schedule on the Electrical Permit Application. Not extracted. Plumbing: Separate permit; fee schedule on the Plumbing Permit Application. Not extracted. Mechanical: Separate permit; fee schedule on the Mechanical Permit Application. Not extracted.
How to apply
- Gather your plans and your project's total value.
- Submit to Community Development, Inspection & Code Enforcement (Building Construction Division).
- Pay the permit and plan review fees when invoiced.
- Questions: 678-297-6080 · 2 Park Plaza, Alpharetta, GA 30009