Building Permit Fees in Redondo Beach, CA (2026)

Redondo Beach prices building permits with a fee table based on floor area, plus a $63.00 application fee, then charges plan review at its own fee table. Enter your project to see the exact math.

  • Official city schedule
  • Effective Aug 15, 2026
  • Verified Nov 5, 2026
Minimum fee
—
Plan review
Separate
$75k addition
—

Permit fee calculator

Redondo Beach schedule, eff. Aug 15, 2026
Project type
Estimated permit fees $22,319.48
  1. 1. Building permit fee
    $4,989.00 for the first 1,000 sq ft + $221.21 × 14 per 100 sq ft over
    $8,085.94
  2. 2. Application fee
    fixed
    $63.00
  3. 3. Plan review fee
    $6,137.00 for the first 1,000 sq ft + $231.47 × 14 per 100 sq ft over
    $9,377.58
  4. 4. State Energy (Title 24) plan check
    25% of $9,377.58
    $2,344.40
  5. 5. CalGreen plan check
    10% of $9,377.58
    $937.76
  6. 6. General Plan Maintenance (on building permit fee)
    3.3% of $8,085.94
    $266.84
  7. 7. General Plan Maintenance (on plan check fee)
    3.3% of $9,377.58
    $309.46
  8. 8. Technology/Training surcharge
    0.25% of $350,000.00
    $875.00
  9. 9. CA Strong Motion Instrumentation Program (SMIP), residential up to 3 stories
    0.013% of $350,000.00
    $45.50
  10. 10. SB 1473 Green Building Standards (BSA)
    $1.00 × 14 per $25,000.00
    $14.00

May also apply (not in the total)

  • Accessibility (disabled access) plan check
    When: accessibility review is required (not stated for single-family homes)
    $937.76
  • Accelerated plan check
    When: accelerated plan check requested
    $4,688.79

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
n/a
No building-permit formula for this project type.
Room addition
$75,000 value, addition 400 sq ft
n/a
No building-permit formula for this project type.
New single-family home
$350,000 value, new single-family 2,400 sq ft
$22,319.48
$8,085.94 building permit + $63.00 application + $9,377.58 plan review + $2,344.40 state energy (title 24) plan check + $937.76 calgreen plan check + $266.84 general plan maintenance (on building permit fee) + $309.46 general plan maintenance (on plan check fee) + $875.00 technology/training surcharge + $45.50 ca strong motion instrumentation program (smip), residential up to 3 stories + $14.00 sb 1473 green building standards (bsa)

How Redondo Beach calculates your permit fee

The city charges a building permit fee using a fee table based on floor area, plus a $63.00 application fee. Plan review is a separate charge: its own fee table.

The fee table

Floor areaFee
1,000 sq ft – 3,000 sq ft$4,989.00 for the first 1,000 sq ft + $221.21 per additional 100 sq ft
3,000 sq ft – 6,000 sq ft$9,413.00 for the first 3,000 sq ft + $276.11 per additional 100 sq ft
Over 6,000 sq ft$17,696.00 for the first 6,000 sq ft + $295.44 per additional 100 sq ft

Plus an application fee of $63.00.

Surcharges

  • State Energy (Title 24) plan check: 25% of the plan review fee
  • CalGreen plan check: 10% of the plan review fee
  • General Plan Maintenance (on building permit fee): 3.3% of the permit fee
  • General Plan Maintenance (on plan check fee): 3.3% of the plan review fee
  • Technology/Training surcharge: 0.25% of the project value
  • CA Strong Motion Instrumentation Program (SMIP), residential up to 3 stories: 0.013% of the project value
  • CA Strong Motion Instrumentation Program (SMIP), commercial: 0.028% of the project value
  • SB 1473 Green Building Standards (BSA): $1.00 per $25,000 of value, minimum $1.00

What counts as project value

Floor area (square feet). New-construction plan check and inspection fees are set by occupancy type and floor area (base cost at a listed size plus a cost per additional 100 sq ft). Valuation is used only for state fees (SMIP, SB 1473) and the technology/training surcharge; the schedule does not say how valuation is determined.

Worked example: a $350,000 new home

  1. Building permit fee: $4,989.00 for the first 1,000 sq ft + $221.21 × 14 per 100 sq ft over = $8,085.94
  2. Application fee: fixed = $63.00
  3. Plan review fee: $6,137.00 for the first 1,000 sq ft + $231.47 × 14 per 100 sq ft over = $9,377.58
  4. State Energy (Title 24) plan check: 25% of $9,377.58 = $2,344.40
  5. CalGreen plan check: 10% of $9,377.58 = $937.76
  6. General Plan Maintenance (on building permit fee): 3.3% of $8,085.94 = $266.84
  7. General Plan Maintenance (on plan check fee): 3.3% of $9,377.58 = $309.46
  8. Technology/Training surcharge: 0.25% of $350,000.00 = $875.00
  9. CA Strong Motion Instrumentation Program (SMIP), residential up to 3 stories: 0.013% of $350,000.00 = $45.50
  10. SB 1473 Green Building Standards (BSA): $1.00 × 14 per $25,000.00 = $14.00
  11. Total before trade permits: $22,319.48.

Fees people miss

May also apply (not in the totals above)

  • Accessibility (disabled access) plan check: when accessibility review is required (not stated for single-family homes).
  • Accelerated plan check: when accelerated plan check requested.
FeeAmount
Records retention surcharge printed as '$0.05' under 'Percent of the all Permit Fees'
ReinspectionWhen: reinspection $174.00 flat rate
Temporary Certificate of OccupancyWhen: temporary CO requested $1,100.00 each
Permit extensionWhen: extension requested $413.00 each
Plan check extensionWhen: extension requested $413.00 each
Non-compliance inspectionWhen: non-compliance $449.00 per hour

How to apply

  1. Gather your plans and your project's total value and floor area.
  2. Submit to Community Development Department, Building & Safety Division through iWorQ Citizen Portal.
  3. Pay the permit and plan review fees when invoiced.

How Redondo Beach compares

A $350,000 new home costs $22,319.48 in Redondo Beach: about 7.6 times the national median of $2,918.63, and the 2nd highest of 47 places we cover in California (state median $6,927.50).

Same standard projects everywhere, including plan review and required surcharges. All California places · Compare side by side

Redondo Beach permit fee FAQ

How much is a building permit in Redondo Beach, CA?

A $350,000 new single-family: $22,319.48. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Redondo Beach permit fee?

No. Plan review is charged separately at its own fee table.

How does Redondo Beach determine project value?

Floor area (square feet). New-construction plan check and inspection fees are set by occupancy type and floor area (base cost at a listed size plus a cost per additional 100 sq ft). Valuation is used only for state fees (SMIP, SB 1473) and the technology/training surcharge; the schedule does not say how valuation is determined.

When did these Redondo Beach fees take effect?

The schedule is effective Aug 15, 2026 (“Resolution No. CC-2606-044, Effective Date: August 15, 2026 (FY 2026-2027)”). We last checked it against the official source on Nov 5, 2026.