BuildingPermitCost

Building Permit Fees in Huntington Beach, CA (2026)

Huntington Beach prices building permits with a fee table based on project value, plus a $41.00 application fee, with a $85.00 minimum, then charges plan review at 61% of the permit fee. Enter your project to see the exact math.

  • Official city schedule
  • Effective Jul 1, 2026
  • Verified Nov 4, 2026
Minimum fee
$85.00
Plan review
61%
$75k addition
$1,947

Permit fee calculator

Huntington Beach schedule, eff. Jul 1, 2026
Project type
Estimated permit fees $1,946.63
  1. 1. Building permit fee
    $1,008.00 for the first $50,000.00 + $7.00 × 25 per $1,000.00 over
    $1,183.00
  2. 2. Application fee
    fixed
    $41.00
  3. 3. Plan review fee
    61% of $1,183.00
    $721.63
  4. 4. Record Retention Fee - each issued permit
    flat fee
    $1.00

May also apply (not in the total)

  • Planning Division building plan review (PL-95)
    When: when the Planning Division reviews the building plans (B-32 'Planning Division - Building Plan Review')
    $544.18

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$1,102.83
$658.90 building permit + $41.00 application + $401.93 plan review + $1.00 record retention fee - each issued permit
Room addition
$75,000 value, addition 400 sq ft
$1,946.63
$1,183.00 building permit + $41.00 application + $721.63 plan review + $1.00 record retention fee - each issued permit
New single-family home
$350,000 value, new single-family 2,400 sq ft
$4,814.04
$2,964.00 building permit + $41.00 application + $1,808.04 plan review + $1.00 record retention fee - each issued permit

How Huntington Beach calculates your permit fee

The city charges a building permit fee using a fee table based on project value, plus a $41.00 application fee, with a $85.00 minimum. Plan review is a separate charge: 61% of the permit fee. Electrical, plumbing and mechanical work gets its own permits.

The fee table

Project valueFee
$1 – $500$85.00
$501 – $2,000$85.00 for the first $500 + $5.33 per additional $100 or fraction
$2,001 – $25,000$169.00 for the first $2,000 + $21.30 per additional $1,000 or fraction
$25,001 – $50,000$690.00 for the first $25,000 + $12.00 per additional $1,000 or fraction
$50,001 – $100,000$1,008.00 for the first $50,000 + $7.00 per additional $1,000 or fraction
$100,001 – $500,000$1,339.00 for the first $100,000 + $6.50 per additional $1,000 or fraction
$500,001 – $1,000,000$4,017.00 for the first $500,000 + $5.80 per additional $1,000 or fraction
Over $1,000,000$7,622.00 for the first $1,000,000 + $4.64 per additional $1,000 or fraction

Plus an application fee of $41.00.

Added to every matching permit

  • Record Retention Fee - each issued permit: a flat $1.00 (All projects)

What counts as project value

Not stated in the schedule. Building inspection fees are 'Based on Project Valuation'; the schedule and calculator page do not say how valuation is determined.

Worked example: a $350,000 new home

  1. Building permit fee: $1,339.00 for the first $100,000.00 + $6.50 × 250 per $1,000.00 over = $2,964.00
  2. Application fee: fixed = $41.00
  3. Plan review fee: 61% of $2,964.00 = $1,808.04
  4. Record Retention Fee - each issued permit: flat fee = $1.00
  5. Total before trade permits: $4,814.04.

Fees people miss

May also apply (not in the totals above)

  • Planning Division building plan review (PL-95): when when the Planning Division reviews the building plans (B-32 'Planning Division - Building Plan Review'); $303.09 on the standard projects.
FeeAmount
Record Retention Fee - each sheet of permitted drawingsWhen: per sheet of permitted drawings $4.00 per sheet
Plan review in excess of included reviews (hourly)When: additional reviews $167.00 per hour
Refund Processing FeeWhen: refund requested $249.00 each
Building Permit ExtensionWhen: extension requested $166.00 each
Building Plan Review ExtensionWhen: extension requested $166.00 each
Reinspection FeeWhen: reinspection required $208.00 each
Investigation Fee - work performed without a permitWhen: work started without a permit $250.00 minimum
Hourly rate, normal work hoursWhen: services billed hourly $166.00 per hour
Expedited Plan ReviewWhen: expedited review requested 2 x plan review fee
State of California SMIP fees See Notes
Huntington Beach Library and School District Fees See Notes

Trade permits are separate. Electrical: B-35: minimum $49; new single/multi-family residential incl. additions and attached garages $0.22/sq ft ($49 minimum); itemized otherwise. Not fully extracted. Mechanical: B-37: minimum $49.00; itemized. Not extracted. Plumbing: B-39: minimum $49.00; itemized. Not extracted.

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to Community Development, Building & Inspections - Permit Center online through HB ACA Portal.
  3. Pay the permit and plan review fees when invoiced.
  4. Questions: (714) 536-5241

How Huntington Beach compares

A $25,000 remodel costs $1,102.83 in Huntington Beach: about 2.9 times the national median of $380.00, and the 19th lowest of 43 places we cover in California (state median $1,263.01).

A $75,000 addition costs $1,946.63 in Huntington Beach: about 2.4 times the national median of $820.58, and the 15th lowest of 45 places we cover in California (state median $2,473.00).

A $350,000 new home costs $4,814.04 in Huntington Beach: 65% above the national median of $2,918.63, and the 9th lowest of 47 places we cover in California (state median $6,927.50).

Same standard projects everywhere, including plan review and required surcharges. All California places · Compare side by side

Huntington Beach permit fee FAQ

How much is a building permit in Huntington Beach, CA?

A $25,000 remodel: $1,102.83. A $75,000 addition: $1,946.63. A $350,000 new single-family: $4,814.04. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Huntington Beach permit fee?

No. Plan review is charged separately at 61% of the permit fee.

How does Huntington Beach determine project value?

Not stated in the schedule. Building inspection fees are 'Based on Project Valuation'; the schedule and calculator page do not say how valuation is determined.

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Electrical: B-35: minimum $49; new single/multi-family residential incl. additions and attached garages $0.22/sq ft ($49 minimum); itemized otherwise. Not fully extracted. Mechanical: B-37: minimum $49.00; itemized. Not extracted. Plumbing: B-39: minimum $49.00; itemized. Not extracted.

When did these Huntington Beach fees take effect?

The schedule is effective Jul 1, 2026 (“Master Fee and Charges Schedule - All Other Fees: July 1, 2026”). We last checked it against the official source on Nov 4, 2026.