Building Permit Fees in Concord, CA (2026)

Concord prices building permits with a fee table based on project value, with a $130.09 minimum, then charges plan review at its own fee table (minimum $83.93). Enter your project to see the exact math.

  • Official city schedule
  • Effective Jul 1, 2026
  • Verified Nov 5, 2026
Minimum fee
$130.09
Plan review
Separate
$75k addition
$3,790

Permit fee calculator

Concord schedule, eff. Jul 1, 2026
Project type
Estimated permit fees $3,789.53
  1. 1. Building permit fee
    $940.28 for the first $50,000.00 + $25.33 × 25 per $1,000.00 over
    $1,573.53
  2. 2. Plan review fee
    $906.82 for the first $50,000.00 + $18.76 × 25 per $1,000.00 over
    $1,375.82
  3. 3. Administrative fee ($70 + 0.0789% of valuation, $550 maximum)
    $70.00 for the first $0.00 + $0.79 × 75 per $1,000.00 over
    $129.18
  4. 4. Technology fee (10.5% of admin, plan review and inspection fees)
    10.5% of $3,078.53
    $323.25
  5. 5. General Plan / Zoning Ordinance reimbursement fee (0.5%)
    0.5% of $75,000.00
    $375.00
  6. 6. CA Building Standards fee
    $75,000.00 ÷ 1,000 × $0.04
    $3.00
  7. 7. SMIP fee, residential 1-3 stories
    $75,000.00 ÷ 1,000 × $0.13
    $9.75

May also apply (not in the total)

  • Recycling C&D program fee (0.33%)
    When: the project is a 'covered' construction and demolition project under CMC 8.20.380
    $247.50
  • Child Care Program fee (0.50%)
    When: the Child Care Program fee (CMC 19.10.030) applies to the project
    $375.00
  • Building permit stormwater (C.3) plan review fee (0.12%)
    When: the permit increases impervious surface (applied to the cost of that portion of work)
    $90.00

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$1,092.90
$470.03 building permit + $312.32 plan review + $89.73 administrative fee ($70 + 0.0789% of valuation, $550 maximum) + $91.57 technology fee (10.5% of admin, plan review and inspection fees) + $125.00 general plan / zoning ordinance reimbursement fee (0.5%) + $1.00 ca building standards + $3.25 smip fee, residential 1-3 stories
Room addition
$75,000 value, addition 400 sq ft
$3,789.53
$1,573.53 building permit + $1,375.82 plan review + $129.18 administrative fee ($70 + 0.0789% of valuation, $550 maximum) + $323.25 technology fee (10.5% of admin, plan review and inspection fees) + $375.00 general plan / zoning ordinance reimbursement fee (0.5%) + $3.00 ca building standards + $9.75 smip fee, residential 1-3 stories
New single-family home
$350,000 value, new single-family 2,400 sq ft
$16,235.55
$7,439.28 building permit + $5,269.82 plan review + $346.15 administrative fee ($70 + 0.0789% of valuation, $550 maximum) + $1,370.80 technology fee (10.5% of admin, plan review and inspection fees) + $1,750.00 general plan / zoning ordinance reimbursement fee (0.5%) + $14.00 ca building standards + $45.50 smip fee, residential 1-3 stories

How Concord calculates your permit fee

The city charges a building permit fee using a fee table based on project value, with a $130.09 minimum. Plan review is a separate charge: its own fee table (minimum $83.93).

The fee table

Project valueFee
$1 – $2,000$130.09
$2,001 – $25,000$130.09 for the first $2,000 + $14.78 per additional $1,000 or fraction
$25,001 – $50,000$470.03 for the first $25,000 + $18.81 per additional $1,000 or fraction
$50,001 – $100,000$940.28 for the first $50,000 + $25.33 per additional $1,000 or fraction
$100,001 – $500,000$2,206.78 for the first $100,000 + $20.93 per additional $1,000 or fraction
$500,001 – $1,000,000$10,578.78 for the first $500,000 + $22.10 per additional $1,000 or fraction
Over $1,000,000$21,628.78 for the first $1,000,000 + $1.58 per additional $1,000 or fraction

Added to every matching permit

  • Administrative fee ($70 + 0.0789% of valuation, $550 maximum): a fee table based on project value and a $550.00 maximum (All projects)

Surcharges

  • Technology fee (10.5% of admin, plan review and inspection fees): 10.5% of the fee total
  • General Plan / Zoning Ordinance reimbursement fee (0.5%): 0.5% of the project value
  • General Plan / Zoning Ordinance reimbursement fee (0.4%, over $10M): 0.4% of the project value
  • CA Building Standards fee: $0.04 per $1,000 of value, minimum $1.00
  • SMIP fee, residential 1-3 stories: $0.13 per $1,000 of value, minimum $0.50
  • SMIP fee, all other: $0.28 per $1,000 of value, minimum $0.50

What counts as project value

Higher of your bid or the valuation table. Valuation-based rates apply to the value of the permitted work; the Building Official may apply minimum valuations from the latest ICC Building Valuation Data or the Building Official's published valuations, and sets final valuation.

Worked example: a $350,000 new home

  1. Building permit fee: $2,206.78 for the first $100,000.00 + $20.93 × 250 per $1,000.00 over = $7,439.28
  2. Plan review fee: $1,844.82 for the first $100,000.00 + $13.70 × 250 per $1,000.00 over = $5,269.82
  3. Administrative fee ($70 + 0.0789% of valuation, $550 maximum): $70.00 for the first $0.00 + $0.79 × 350 per $1,000.00 over = $346.15
  4. Technology fee (10.5% of admin, plan review and inspection fees): 10.5% of $13,055.25 = $1,370.80
  5. General Plan / Zoning Ordinance reimbursement fee (0.5%): 0.5% of $350,000.00 = $1,750.00
  6. CA Building Standards fee: $350,000.00 ÷ 1,000 × $0.04 = $14.00
  7. SMIP fee, residential 1-3 stories: $350,000.00 ÷ 1,000 × $0.13 = $45.50
  8. Total before trade permits: $16,235.55.

Fees people miss

May also apply (not in the totals above)

  • Recycling C&D program fee (0.33%): when the project is a 'covered' construction and demolition project under CMC 8.20.380; $82.50 on the standard projects.
  • Child Care Program fee (0.50%): when the Child Care Program fee (CMC 19.10.030) applies to the project; $125.00 on the standard projects.
  • Building permit stormwater (C.3) plan review fee (0.12%): when the permit increases impervious surface (applied to the cost of that portion of work); $30.00 on the standard projects.
FeeAmount
Re-inspection feeWhen: re-inspection needed $192.00 per hour
Inspection outside normal business hoursWhen: after-hours inspection requested $288.00 per hour (2-hour minimum)
Work commencing before permit issuanceWhen: work started before permit issuance or without inspections double the inspection fee
Additional plan review beyond one back checkWhen: more review after the back check $230.00 per hour
Expedited plan review by consultantsWhen: applicant requests expedited review cost + 20% admin

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to City of Concord Building Division, Permit Center.
  3. Pay the permit and plan review fees when invoiced.

How Concord compares

A $25,000 remodel costs $1,092.90 in Concord: about 2.9 times the national median of $380.00, and the 17th lowest of 43 places we cover in California (state median $1,263.01).

A $75,000 addition costs $3,789.53 in Concord: about 4.6 times the national median of $820.58, and the 11th highest of 45 places we cover in California (state median $2,473.00).

A $350,000 new home costs $16,235.55 in Concord: about 5.6 times the national median of $2,918.63, and the 6th highest of 47 places we cover in California (state median $6,927.50).

Same standard projects everywhere, including plan review and required surcharges. All California places · Compare side by side

Concord permit fee FAQ

How much is a building permit in Concord, CA?

A $25,000 remodel: $1,092.90. A $75,000 addition: $3,789.53. A $350,000 new single-family: $16,235.55. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Concord permit fee?

No. Plan review is charged separately at its own fee table (minimum $83.93).

How does Concord determine project value?

Higher of your bid or the valuation table. Valuation-based rates apply to the value of the permitted work; the Building Official may apply minimum valuations from the latest ICC Building Valuation Data or the Building Official's published valuations, and sets final valuation.

When did these Concord fees take effect?

The schedule is effective Jul 1, 2026 (“Fees and Charges Schedule July 1, 2026 (Resolution 26-6042.1, last adoption 4-28-2026)”). We last checked it against the official source on Nov 5, 2026.