BuildingPermitCost

Building Permit Fees in Chino Hills, CA (2026)

Chino Hills prices building permits with a fee table based on floor area, then charges plan review at its own fee table. Enter your project to see the exact math.

  • Official city schedule
  • Effective Jan 1, 2026
  • Verified Nov 5, 2026
Minimum fee
—
Plan review
Separate
$75k addition
$3,058

Permit fee calculator

Chino Hills schedule, eff. Jan 1, 2026
Project type
Estimated permit fees $3,058.16
  1. 1. Building permit fee
    $1,345.53 for the first 300 sq ft + $403.66 × 1 per 100 sq ft over
    $1,749.19
  2. 2. Plan review fee
    $807.32 for the first 300 sq ft + $269.11 × 1 per 100 sq ft over
    $1,076.43
  3. 3. Technology Fee
    6% of $2,825.62
    $169.54
  4. 4. General Plan Surcharge Fee
    0.08% of $75,000.00
    $60.00
  5. 5. SB 1473 Building Standards Administration Special Revolving Fund
    $1.00 × 3 per $25,000.00
    $3.00

May also apply (not in the total)

  • Energy Conservation Compliance (on building permit fee)
    When: the project is subject to state energy compliance review
    $174.92
  • Energy Conservation Compliance (on plan check fee)
    When: the project is subject to state energy compliance review
    $107.64
  • Access Compliance (on building permit fee)
    When: the project is subject to state accessibility compliance review
    $87.46
  • Access Compliance (on plan check fee)
    When: the project is subject to state accessibility compliance review
    $53.82
  • Started work without a permit
    When: work started without a permit
    $874.60

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
n/a
No building-permit formula for this project type.
Room addition
$75,000 value, addition 400 sq ft
$3,058.16
$1,749.19 building permit + $1,076.43 plan review + $169.54 technology + $60.00 general plan surcharge + $3.00 sb 1473 building standards administration special revolving fund
New single-family home
$350,000 value, new single-family 2,400 sq ft
$9,422.06
$5,920.32 building permit + $2,691.06 plan review + $516.68 technology + $280.00 general plan surcharge + $14.00 sb 1473 building standards administration special revolving fund

How Chino Hills calculates your permit fee

The city charges a building permit fee using a fee table based on floor area. Plan review is a separate charge: its own fee table.

The fee table

R-3 Dwellings

Floor areaFee
0 sq ft – 2,500 sq ft$5,920.32
2,500 sq ft – 5,000 sq ft$5,920.32 for the first 2,500 sq ft + $107.64 per additional 100 sq ft
5,000 sq ft – 7,000 sq ft$8,611.38 for the first 5,000 sq ft + $94.19 per additional 100 sq ft
7,000 sq ft – 10,000 sq ft$10,495.12 for the first 7,000 sq ft + $53.82 per additional 100 sq ft
10,000 sq ft – 15,000 sq ft$12,109.75 for the first 10,000 sq ft + $53.82 per additional 100 sq ft
15,000 sq ft – 25,000 sq ft$14,800.81 for the first 15,000 sq ft + $40.37 per additional 100 sq ft
Over 25,000 sq ft$18,837.39 for the first 25,000 sq ft + $46.13 per additional 100 sq ft

R Occupancy - Additions

Floor areaFee
0 sq ft – 100 sq ft$807.32
100 sq ft – 300 sq ft$807.32 for the first 100 sq ft + $269.11 per additional 100 sq ft
300 sq ft – 500 sq ft$1,345.53 for the first 300 sq ft + $403.66 per additional 100 sq ft
500 sq ft – 1,000 sq ft$2,152.84 for the first 500 sq ft + $430.57 per additional 100 sq ft
1,000 sq ft – 2,500 sq ft$4,305.69 for the first 1,000 sq ft + $71.76 per additional 100 sq ft
2,500 sq ft – 5,000 sq ft$5,382.11 for the first 2,500 sq ft + $107.64 per additional 100 sq ft
Over 5,000 sq ft$8,073.17 for the first 5,000 sq ft + $143.52 per additional 100 sq ft

Surcharges

  • Technology Fee: 6% of the fee total
  • General Plan Surcharge Fee: 0.08% of the project value
  • SB 1473 Building Standards Administration Special Revolving Fund: $1.00 per $25,000 of value

What counts as project value

Floor area (square feet). New construction and additions are priced by project floor area (Table 9, by IBC occupancy, base cost at a threshold size plus a cost per each additional 100 sq ft). Building valuation is used only for the General Plan Surcharge (0.08%) and the SB 1473 fee; the schedule does not say how valuation is determined.

Worked example: a $350,000 new home

  1. Building permit fee: table value for 2,400 sq ft: $5,920.32 = $5,920.32
  2. Plan review fee: table value for 2,400 sq ft: $2,691.06 = $2,691.06
  3. Technology Fee: 6% of $8,611.38 = $516.68
  4. General Plan Surcharge Fee: 0.08% of $350,000.00 = $280.00
  5. SB 1473 Building Standards Administration Special Revolving Fund: $1.00 × 14 per $25,000.00 = $14.00
  6. Total before trade permits: $9,422.06.

Fees people miss

May also apply (not in the totals above)

  • Energy Conservation Compliance (on building permit fee): when the project is subject to state energy compliance review.
  • Energy Conservation Compliance (on plan check fee): when the project is subject to state energy compliance review.
  • Access Compliance (on building permit fee): when the project is subject to state accessibility compliance review.
  • Access Compliance (on plan check fee): when the project is subject to state accessibility compliance review.
  • Started work without a permit: when work started without a permit.
FeeAmount
Strong Motion Instrumentation (SMIP) pass through
Re-inspection feeWhen: re-inspection required $336.00 each
Plan check re-submittal (after 3 reviews)When: more than 3 reviews $538.00 each
Certificate of occupancyWhen: certificate of occupancy requested $134.00 each
Regional Sewerage Capital ConstructionWhen: new sewer connection $8,620.00 per EDU

How to apply

  1. Gather your plans and your project's total value and floor area.
  2. Submit to Community Development, Building & Safety Division.
  3. Pay the permit and plan review fees when invoiced.
  4. Questions: (909) 364-2780

How Chino Hills compares

A $75,000 addition costs $3,058.16 in Chino Hills: about 3.7 times the national median of $820.58, and the 17th highest of 45 places we cover in California (state median $2,473.00).

A $350,000 new home costs $9,422.06 in Chino Hills: about 3.2 times the national median of $2,918.63, and the 15th highest of 47 places we cover in California (state median $6,927.50).

Same standard projects everywhere, including plan review and required surcharges. All California places · Compare side by side

Chino Hills permit fee FAQ

How much is a building permit in Chino Hills, CA?

A $75,000 addition: $3,058.16. A $350,000 new single-family: $9,422.06. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Chino Hills permit fee?

No. Plan review is charged separately at its own fee table.

How does Chino Hills determine project value?

Floor area (square feet). New construction and additions are priced by project floor area (Table 9, by IBC occupancy, base cost at a threshold size plus a cost per each additional 100 sq ft). Building valuation is used only for the General Plan Surcharge (0.08%) and the SB 1473 fee; the schedule does not say how valuation is determined.

When did these Chino Hills fees take effect?

The schedule is effective Jan 1, 2026 (“Table 9 Building Permit Fees, Effective January 1, 2026 (FY 25/26); Building Services fees Effective July 1, 2026”). We last checked it against the official source on Nov 5, 2026.