BuildingPermitCost

Building Permit Fees in Chico, CA (2026)

Chico prices building permits with a fee table based on floor area. Enter your project to see the exact math.

  • Official city schedule
  • Effective Jul 6, 2026
  • Verified Nov 5, 2026
Minimum fee
—
Plan review
None
$75k addition
—

Permit fee calculator

Chico schedule, eff. Jul 6, 2026
Project type
Estimated permit fees $804.95
  1. 1. Building permit fee
    table value for 300 sq ft: $785.00
    $785.00
  2. 2. Plan maintenance fee
    2% of $785.00
    $15.70
  3. 3. State SMIP fee (Public Resources Code §2705), residential up to three stories
    0.013% of $25,000.00
    $3.25
  4. 4. State Building Standards surcharge (H&S Code §18931.6)
    $1.00 × 1 per $25,000.00
    $1.00

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$804.95
$785.00 building permit + $15.70 plan maintenance + $3.25 state smip fee (public resources code §2705), residential up to three stories + $1.00 state building standards surcharge (h&s code §18931.6)
Room addition
$75,000 value, addition 400 sq ft
n/a
No building-permit formula for this project type.
New single-family home
$350,000 value, new single-family 2,400 sq ft
$6,298.84
$6,117.00 building permit + $122.34 plan maintenance + $45.50 state smip fee (public resources code §2705), residential up to three stories + $14.00 state building standards surcharge (h&s code §18931.6)

How Chico calculates your permit fee

The city charges a building permit fee using a fee table based on floor area.

The fee table

SFR / Duplex (custom), new construction, R-3

Floor areaFee
0 sq ft – 500 sq ft$4,376.00
500 sq ft – 1,000 sq ft$4,376.00 for the first 500 sq ft + $0.97 per additional sq ft or fraction
1,000 sq ft – 2,000 sq ft$5,062.00 for the first 1,000 sq ft + $0.60 per additional sq ft or fraction
2,000 sq ft – 4,000 sq ft$5,789.00 for the first 2,000 sq ft + $0.82 per additional sq ft or fraction
4,000 sq ft – 8,000 sq ft$7,468.00 for the first 4,000 sq ft + $0.76 per additional sq ft or fraction
Over 8,000 sq ft$10,943.00 for the first 8,000 sq ft + $2.67 per additional sq ft or fraction

Residential structural remodel/renovation

Floor areaFee
0 sq ft – 500 sq ft$785.00
Over 500 sq ft$785.00 for the first 500 sq ft + $28.00 per additional 500 sq ft or fraction

Surcharges

  • Plan maintenance fee: 2% of the permit fee, minimum $8.00
  • State SMIP fee (Public Resources Code §2705), residential up to three stories: 0.013% of the project value, minimum $0.50
  • State SMIP fee (Public Resources Code §2705), all other occupancies: 0.028% of the project value, minimum $0.50
  • State Building Standards surcharge (H&S Code §18931.6): $1.00 per $25,000 of value

What counts as project value

Floor area (square feet). New construction is priced by floor area and occupancy in the 'Consolidated Bldg & P/C New Construction Fees' table (base fee at a size level plus a per-sq-ft cost in excess of that level), with plan check and inspection combined. State SMIP and CBSC surcharges use 'the established construction valuations as reported on the building permit'.

Worked example: a $350,000 new home

  1. Building permit fee: $5,789.00 for the first 2,000 sq ft + $0.82 × 400 per sq ft over = $6,117.00
  2. Plan maintenance fee: 2% of $6,117.00 = $122.34
  3. State SMIP fee (Public Resources Code §2705), residential up to three stories: 0.013% of $350,000.00 = $45.50
  4. State Building Standards surcharge (H&S Code §18931.6): $1.00 × 14 per $25,000.00 = $14.00
  5. Total before trade permits: $6,298.84.

Fees people miss

May also apply (not in the totals above)

  • Energy plan check fee (minimum, up to 2 residential units): when an energy plan check is required (schedule prints only the minimum fee); $282.00 on the standard projects.
FeeAmount
Basic plan check & inspection fee (hourly)When: hourly-billed plan check or inspection $282.00 per hour
Construction reinspection feeWhen: more than two requests to inspect the same item $281.00 per hour (1/2 hour minimum)
Post permit issuance revisionsWhen: revisions after issuance $253.00 per hour
Overtime feeWhen: overtime $422.00 per hour
Fire plan check processing fee (residential)When: Fire Department review required $109.00 each
SWPPP (City MS4) review and inspections of building permitsWhen: a Storm Water Pollution Prevention Plan is required $1,502.00 each
Work completed with no permitWhen: work completed without a permit 3x the building permit fee
Work during plan check or before issuanceWhen: work started before permit issued 2x the building permit fee

How to apply

  1. Gather your plans and your project's total value and floor area.
  2. Submit to Community Development Department, Building Division.
  3. Pay the permit and plan review fees when invoiced.

How Chico compares

A $25,000 remodel costs $804.95 in Chico: about 2.1 times the national median of $380.00, and the 6th lowest of 43 places we cover in California (state median $1,263.01).

A $350,000 new home costs $6,298.84 in Chico: about 2.2 times the national median of $2,918.63, and the 19th lowest of 47 places we cover in California (state median $6,927.50).

Same standard projects everywhere, including plan review and required surcharges. All California places · Compare side by side

Chico permit fee FAQ

How much is a building permit in Chico, CA?

A $25,000 remodel: $804.95. A $350,000 new single-family: $6,298.84. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Chico permit fee?

Chico lists no separate plan review fee for these projects.

How does Chico determine project value?

Floor area (square feet). New construction is priced by floor area and occupancy in the 'Consolidated Bldg & P/C New Construction Fees' table (base fee at a size level plus a per-sq-ft cost in excess of that level), with plan check and inspection combined. State SMIP and CBSC surcharges use 'the established construction valuations as reported on the building permit'.

When did these Chico fees take effect?

The schedule is effective Jul 6, 2026 (“FY 2026/2027 Master Fee Schedule, effective July 6, 2026”). We last checked it against the official source on Nov 5, 2026.