Building Permit Fees in Yakima, WA (2026)

Yakima prices building permits with a fee table based on project value, with a $90.35 minimum, then charges plan review at 65% of the permit fee. Enter your project to see the exact math.

  • Official city schedule
  • Effective Jun 1, 2026
  • Verified Nov 5, 2026
Minimum fee
$90.35
Plan review
65%
$75k addition
$1,300

Permit fee calculator

Yakima schedule, eff. Jun 1, 2026
Project type
Estimated permit fees $1,300.47
  1. 1. Building permit fee
    $593.06 for the first $50,000.00 + $6.44 × 25 per $1,000.00 over
    $754.06
  2. 2. Plan review fee
    65% of $754.06
    $490.14
  3. 3. Technology fee
    4% of $1,244.20
    $49.77
  4. 4. State Building Code Council (SBCC) fee, residential
    fixed
    $6.50

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$624.97
$360.41 building permit + $234.27 plan review + $23.79 technology + $6.50 state building code council (sbcc) fee, residential
Room addition
$75,000 value, addition 400 sq ft
$1,300.47
$754.06 building permit + $490.14 plan review + $49.77 technology + $6.50 state building code council (sbcc) fee, residential
New single-family home
$350,000 value, new single-family 2,400 sq ft
$3,828.69
$2,227.38 building permit + $1,447.80 plan review + $147.01 technology + $6.50 state building code council (sbcc) fee, residential

How Yakima calculates your permit fee

The city charges a building permit fee using a fee table based on project value, with a $90.35 minimum. Plan review is a separate charge: 65% of the permit fee. Electrical, plumbing and mechanical work gets its own permits.

The fee table

Project valueFee
$1 – $4,000$90.35
$4,001 – $25,000$90.35 for the first $4,000 + $12.86 per additional $1,000 or fraction
$25,001 – $50,000$360.45 for the first $25,000 + $9.31 per additional $1,000 or fraction
$50,001 – $100,000$593.06 for the first $50,000 + $6.44 per additional $1,000 or fraction
$100,001 – $500,000$914.88 for the first $100,000 + $5.25 per additional $1,000 or fraction
$500,001 – $1,000,000$2,924.74 for the first $500,000 + $4.48 per additional $1,000 or fraction
Over $1,000,000$5,070.22 for the first $1,000,000 + $3.02 per additional $1,000 or fraction

Surcharges

  • Technology fee: 4% of the fee total
  • State Building Code Council (SBCC) fee, residential: $6.50
  • State Building Code Council (SBCC) fee, commercial: $25.00

What counts as project value

Local valuation table. New construction: square footage x the city's Table 1-1 valuation per sq ft by occupancy and construction type (new square footage reviewed under the Residential Code uses R-3, VB = $170.80/sq ft; unfinished basements $31.50/sq ft; decks/covered patios/carports half the U-occupancy rate). All other work: total value of work; if labor is excluded the materials cost is doubled. Final valuation set by the building official.

Worked example: a $350,000 new home

  1. Building permit fee: $914.88 for the first $100,000.00 + $5.25 × 250 per $1,000.00 over = $2,227.38
  2. Plan review fee: 65% of $2,227.38 = $1,447.80
  3. Technology fee: 4% of $3,675.18 = $147.01
  4. State Building Code Council (SBCC) fee, residential: fixed = $6.50
  5. Total before trade permits: $3,828.69.

Fees people miss

FeeAmount
Minimum permit where no valuation can be determinedWhen: no valuation can be determined $50.00 each
Additional plan review (changes/revisions, or third round of corrections)When: revisions or repeated corrections $60.00 per hour
Re-inspection (third correction notice)When: third correction notice $60.00 per hour
After-hours inspectionWhen: requested outside business hours $60.00 per hour, minimum two hours
Stop work orderWhen: stop work order issued $120.00 each
Permit or application extensionWhen: extension requested $50.00 each
Outside consultants for plan review or inspectionsWhen: when consultants are used actual cost

Trade permits are separate. Plumbing: Base permit $50 plus $22 per fixture; plan review $60 when required. Electrical: Electrical permits are not listed in the city schedule (issued by WA Dept of Labor & Industries per registry note; not verified). Mechanical: Mechanical permits use the Table 1-2 valuation table (footnote d).

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to Code Administration.
  3. Pay the permit and plan review fees when invoiced.
  4. Questions: 129 N 2nd Street, Yakima WA 98901

How Yakima compares

A $25,000 remodel costs $624.97 in Yakima: 64% above the national median of $380.00, and the 3rd lowest of 10 places we cover in Washington (state median $652.06).

A $75,000 addition costs $1,300.47 in Yakima: 58% above the national median of $820.58, and the 3rd lowest of 10 places we cover in Washington (state median $1,357.44).

A $350,000 new home costs $3,828.69 in Yakima: 31% above the national median of $2,918.63, and the 4th lowest of 10 places we cover in Washington (state median $3,956.19).

Same standard projects everywhere, including plan review and required surcharges. All Washington places · Compare side by side

Yakima permit fee FAQ

How much is a building permit in Yakima, WA?

A $25,000 remodel: $624.97. A $75,000 addition: $1,300.47. A $350,000 new single-family: $3,828.69. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Yakima permit fee?

No. Plan review is charged separately at 65% of the permit fee.

How does Yakima determine project value?

Local valuation table. New construction: square footage x the city's Table 1-1 valuation per sq ft by occupancy and construction type (new square footage reviewed under the Residential Code uses R-3, VB = $170.80/sq ft; unfinished basements $31.50/sq ft; decks/covered patios/carports half the U-occupancy rate). All other work: total value of work; if labor is excluded the materials cost is doubled. Final valuation set by the building official.

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Plumbing: Base permit $50 plus $22 per fixture; plan review $60 when required. Electrical: Electrical permits are not listed in the city schedule (issued by WA Dept of Labor & Industries per registry note; not verified). Mechanical: Mechanical permits use the Table 1-2 valuation table (footnote d).

When did these Yakima fees take effect?

The schedule is effective Jun 1, 2026 (“Master Fee Schedule adopted by Resolution R-2026-063, effective June 1, 2026”). We last checked it against the official source on Nov 5, 2026.