BuildingPermitCost

Building Permit Fees in Bellingham, WA (2026)

Bellingham prices building permits with a fee table based on project value, with a $40.00 minimum, then charges plan review at 65% of the permit fee. Enter your project to see the exact math.

  • Official city schedule
  • Effective not stated
  • Verified Nov 5, 2026
Minimum fee
$40.00
Plan review
65%
$75k addition
$1,038

Permit fee calculator

Bellingham schedule
Project type
Estimated permit fees $1,037.75
  1. 1. Building permit fee
    $500.00 for the first $50,000.00 + $5.00 × 25 per $1,000.00 over
    $625.00
  2. 2. Plan review fee
    65% of $625.00
    $406.25
  3. 3. State Building Code Fee (RCW 19.27.085), residential
    fixed
    $6.50

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$501.50
$300.00 building permit + $195.00 plan review + $6.50 state building code fee (rcw 19.27.085), residential
Room addition
$75,000 value, addition 400 sq ft
$1,037.75
$625.00 building permit + $406.25 plan review + $6.50 state building code fee (rcw 19.27.085), residential
New single-family home
$350,000 value, new single-family 2,400 sq ft
$2,977.63
$1,782.50 building permit + $1,158.63 plan review + $30.00 fire department plan review (single family/duplex new construction) + $6.50 state building code fee (rcw 19.27.085), residential

How Bellingham calculates your permit fee

The city charges a building permit fee using a fee table based on project value, with a $40.00 minimum. Plan review is a separate charge: 65% of the permit fee. Electrical, plumbing and mechanical work gets its own permits.

The fee table

Project valueFee
$1 – $500$40.00
$501 – $2,000$40.00 for the first $500 + $2.00 per additional $100 or fraction
$2,001 – $25,000$70.00 for the first $2,000 + $10.00 per additional $1,000 or fraction
$25,001 – $50,000$300.00 for the first $25,000 + $8.00 per additional $1,000 or fraction
$50,001 – $100,000$500.00 for the first $50,000 + $5.00 per additional $1,000 or fraction
$100,001 – $500,000$750.00 for the first $100,000 + $4.13 per additional $1,000 or fraction
$500,001 – $1,000,000$2,402.00 for the first $500,000 + $3.60 per additional $1,000 or fraction
Over $1,000,000$4,202.00 for the first $1,000,000 + $3.10 per additional $1,000 or fraction

Added to every matching permit

  • Fire Department plan review (single family/duplex new construction): a flat $30.00 (New single family residence or duplex)
  • Fire Department plan review (multifamily, commercial, industrial): a fee table based on project value (All other use types: new, additions and alterations)

Surcharges

  • State Building Code Fee (RCW 19.27.085), residential: $6.50
  • State Building Code Fee (RCW 19.27.085), non-residential: $25.00

What counts as project value

ICC Building Valuation Data table. New construction valued from the most recent ICC valuation table (BSD #178); handout gives SFR/duplex rates (finished living space $177.63/sq ft, unfinished basement $31.50, utility/garage $71.79, carport $23.81, uncovered deck $21.26, covered deck $28.10). Remodels: contractor's contract/bid, or owner's material cost x2. Includes design fees; excludes land and site development.

Worked example: a $350,000 new home

  1. Building permit fee: $750.00 for the first $100,000.00 + $4.13 × 250 per $1,000.00 over = $1,782.50
  2. Plan review fee: 65% of $1,782.50 = $1,158.63
  3. Fire Department plan review (single family/duplex new construction): flat fee = $30.00
  4. State Building Code Fee (RCW 19.27.085), residential: fixed = $6.50
  5. Total before trade permits: $2,977.63.

Fees people miss

FeeAmount
Additional plan review for changes/revisionsWhen: plan revisions $107.00 per hour
Reinspection / after-hours / unscheduled inspectionWhen: reinspection or after-hours inspection $107.00 per hour
Land Use plan reviewWhen: land use review required $107.00 per hour
School impact fee, SFR and duplexWhen: new residential units $4,133.00 per unit
Park impact fee, SFR and duplexWhen: new residential units $4,014.57 per unit
Transportation impact, water/sewer/stormwater feesWhen: per Public Works fee sheet see Public Works fee sheet

Trade permits are separate. Mechanical: Base fee $25 per permit plus per-fixture fees (gas piping 1-4 outlets $15; appliances $25; AHU/boiler etc. $75; over 30 HP $100). Plan review when conducted 25% of permit fee excl. base, min $50. Plumbing: Base fee $25 per permit plus $7 per fixture/water heater/piping item; medical gas $35 per system. Electrical: Issuance $25. New SFR/duplex service up to 200 A $100, over 200 A $125, each subpanel $50; commercial by value of work ($80 up to $1,000 then percentage tiers). Plan review when applicable 35% (min $50).

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to Permit Center online through eTRAKiT / ePermits.
  3. Pay the permit and plan review fees when invoiced.
  4. Questions: (360) 778-8300 · 210 Lottie Street, Bellingham, WA 98225

How Bellingham compares

A $25,000 remodel costs $501.50 in Bellingham: 32% above the national median of $380.00, and the 2nd lowest of 10 places we cover in Washington (state median $652.06).

A $75,000 addition costs $1,037.75 in Bellingham: 26% above the national median of $820.58, and the lowest of 10 places we cover in Washington (state median $1,357.44).

A $350,000 new home costs $2,977.63 in Bellingham: about the same as the national median of $2,918.63, and the 2nd lowest of 10 places we cover in Washington (state median $3,956.19).

Same standard projects everywhere, including plan review and required surcharges. All Washington places · Compare side by side

Bellingham permit fee FAQ

How much is a building permit in Bellingham, WA?

A $25,000 remodel: $501.50. A $75,000 addition: $1,037.75. A $350,000 new single-family: $2,977.63. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Bellingham permit fee?

No. Plan review is charged separately at 65% of the permit fee.

How does Bellingham determine project value?

ICC Building Valuation Data table. New construction valued from the most recent ICC valuation table (BSD #178); handout gives SFR/duplex rates (finished living space $177.63/sq ft, unfinished basement $31.50, utility/garage $71.79, carport $23.81, uncovered deck $21.26, covered deck $28.10). Remodels: contractor's contract/bid, or owner's material cost x2. Includes design fees; excludes land and site development.

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Mechanical: Base fee $25 per permit plus per-fixture fees (gas piping 1-4 outlets $15; appliances $25; AHU/boiler etc. $75; over 30 HP $100). Plan review when conducted 25% of permit fee excl. base, min $50. Plumbing: Base fee $25 per permit plus $7 per fixture/water heater/piping item; medical gas $35 per system. Electrical: Issuance $25. New SFR/duplex service up to 200 A $100, over 200 A $125, each subpanel $50; commercial by value of work ($80 up to $1,000 then percentage tiers). Plan review when applicable 35% (min $50).

When did these Bellingham fees take effect?

The schedule does not state an effective date. We last checked it against the official source on Nov 5, 2026.