Building Permit Fees in Nashville / Davidson County, TN (2026)

Nashville / Davidson County prices building permits with $5.00 per $1,000 of project value. Enter your project to see the exact math.

  • Official city schedule
  • Effective not stated
  • Verified Nov 4, 2026
Minimum fee
—
Plan review
None
$75k addition
$438

Permit fee calculator

Nashville / Davidson County schedule
Project type
Estimated permit fees $437.50
  1. 1. Building permit fee
    $75,000.00 ÷ 1,000 × $5.00
    $375.00
  2. 2. Zoning Examination Fee
    fixed
    $25.00
  3. 3. Codes Tech Fee
    10% of $375.00
    $37.50

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$162.50
$125.00 building permit + $25.00 zoning examination + $12.50 codes tech
Room addition
$75,000 value, addition 400 sq ft
$437.50
$375.00 building permit + $25.00 zoning examination + $37.50 codes tech
New single-family home
$350,000 value, new single-family 2,400 sq ft
$1,950.00
$1,750.00 building permit + $25.00 zoning examination + $175.00 codes tech

How Nashville / Davidson County calculates your permit fee

The city charges a building permit fee using $5.00 per $1,000 of project value. Electrical, plumbing and mechanical work gets its own permits.

The fee table

One- and two-family dwellings and townhouses (2018 IRC)

$5.00 per $1,000 of project value.

Commercial, multi-family and all other construction

Project valueFee
$1 – $2,000$40.39
$2,001 – $50,000$40.39 for the first $2,000 + $6.92 per additional $1,000 or fraction
$50,001 – $100,000$372.71 for the first $50,000 + $5.57 per additional $1,000 or fraction
$100,001 – $500,000$651.38 for the first $100,000 + $4.19 per additional $1,000 or fraction
Over $500,000$2,326.84 for the first $500,000 + $2.79 per additional $1,000 or fraction

Surcharges

  • Zoning Examination Fee: $25.00
  • Codes Tech Fee: 10% of the permit fee

What counts as project value

ICC Building Valuation Data table. Page 1 lists 'Building Valuation Fee: See below (Valuation Table is on last page)'; the last pages (9-10) are the ICC Building Valuation Data, February 2025 (gross area x square foot construction cost; R-3 one- and two-family VB $169.09/sq ft). The attached BVD text describes it as an aid for the building official 'to determine if the permit valuation is underestimated' and says it is not intended for alterations or repairs, so remodels are valued on the cost of work. The schedule does not state whether a higher applicant-stated cost overrides the table.

Worked example: a $350,000 new home

  1. Building permit fee: $350,000.00 ÷ 1,000 × $5.00 = $1,750.00
  2. Zoning Examination Fee: fixed = $25.00
  3. Codes Tech Fee: 10% of $1,750.00 = $175.00
  4. Total before trade permits: $1,950.00.

Fees people miss

FeeAmount
Re-inspection $50.00 each
Certificate of occupancy/compliance with no building permit issued $55.00 each
Use verification letter $50.00 each
Electrical work started before permit issuedWhen: electrical work commenced without a permit permit fees tripled

Trade permits are separate. Plumbing: Minimum $75 per permit plus per-fixture and item fees. Mechanical: Gas/mechanical: minimum $75 per permit plus per-appliance fees and $32 per 100,000 Btuh or fraction for HVAC/refrigeration systems. Electrical: Minimum $75 per permit plus item fees (outlets, motors, ranges, panels, services); not all items extracted.

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to Metro Nashville Codes Administration.
  3. Pay the permit and plan review fees when invoiced.

How Nashville / Davidson County compares

A $25,000 remodel costs $162.50 in Nashville / Davidson County: 57% below the national median of $380.00.

A $75,000 addition costs $437.50 in Nashville / Davidson County: 47% below the national median of $820.58.

A $350,000 new home costs $1,950.00 in Nashville / Davidson County: 33% below the national median of $2,918.63.

Same standard projects everywhere, including plan review and required surcharges. All Tennessee places · Compare side by side

Nashville / Davidson County permit fee FAQ

How much is a building permit in Nashville / Davidson County, TN?

A $25,000 remodel: $162.50. A $75,000 addition: $437.50. A $350,000 new single-family: $1,950.00. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Nashville / Davidson County permit fee?

Nashville / Davidson County lists no separate plan review fee for these projects.

How does Nashville / Davidson County determine project value?

ICC Building Valuation Data table. Page 1 lists 'Building Valuation Fee: See below (Valuation Table is on last page)'; the last pages (9-10) are the ICC Building Valuation Data, February 2025 (gross area x square foot construction cost; R-3 one- and two-family VB $169.09/sq ft). The attached BVD text describes it as an aid for the building official 'to determine if the permit valuation is underestimated' and says it is not intended for alterations or repairs, so remodels are valued on the cost of work. The schedule does not state whether a higher applicant-stated cost overrides the table.

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Plumbing: Minimum $75 per permit plus per-fixture and item fees. Mechanical: Gas/mechanical: minimum $75 per permit plus per-appliance fees and $32 per 100,000 Btuh or fraction for HVAC/refrigeration systems. Electrical: Minimum $75 per permit plus item fees (outlets, motors, ranges, panels, services); not all items extracted.

When did these Nashville / Davidson County fees take effect?

The schedule does not state an effective date. We last checked it against the official source on Nov 4, 2026.