BuildingPermitCost

Building Permit Fees in Temecula, CA (2026)

Temecula prices building permits with a fee table based on floor area, then charges plan review at its own fee table. Enter your project to see the exact math.

  • Official city schedule
  • Effective not stated
  • Verified Nov 5, 2026
Minimum fee
—
Plan review
Separate
$75k addition
$1,508

Permit fee calculator

Temecula schedule
Project type
Estimated permit fees $1,508.00
  1. 1. Building permit fee
    $693.00 for the first 300 sq ft + $70.00 × 1 per 100 sq ft over
    $763.00
  2. 2. Plan review fee
    $512.00 for the first 300 sq ft + $69.00 × 1 per 100 sq ft over
    $581.00
  3. 3. Fire - Plan Check, room addition first story
    flat fee
    $42.00
  4. 4. Fire - Inspection, room addition first story
    $70.00 for the first 300 sq ft + $52.00 × 1 per 100 sq ft over
    $122.00

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$390.00
$180.00 building permit + $116.00 plan review + $42.00 fire - plan check, residential remodel + $52.00 fire - inspection, residential remodel
Room addition
$75,000 value, addition 400 sq ft
$1,508.00
$763.00 building permit + $581.00 plan review + $42.00 fire - plan check, room addition first story + $122.00 fire - inspection, room addition first story
New single-family home
$350,000 value, new single-family 2,400 sq ft
$5,041.00
$2,286.00 building permit + $1,967.00 plan review + $343.00 fire - plan check, new single family custom home + $445.00 fire - inspection, new single family custom home

How Temecula calculates your permit fee

The city charges a building permit fee using a fee table based on floor area. Plan review is a separate charge: its own fee table. Electrical, plumbing and mechanical work gets its own permits.

The fee table

New Single Family Custom Home / Model (Tract) / ADU (Custom): Building - Inspection

Floor areaFee
0 sq ft – 1,000 sq ft$2,071.00
1,000 sq ft – 2,500 sq ft$2,286.00
2,500 sq ft – 5,000 sq ft$3,625.00
Over 5,000 sq ft$3,625.00 for the first 5,000 sq ft + $120.00 per additional 500 sq ft or fraction

Room Addition First Story: Building - Inspection

Floor areaFee
0 sq ft – 300 sq ft$693.00
Over 300 sq ft$693.00 for the first 300 sq ft + $70.00 per additional 100 sq ft or fraction

Remodel - Residential: Building - Inspection

Floor areaFee
0 sq ft – 300 sq ft$180.00
Over 300 sq ft$180.00 for the first 300 sq ft + $118.00 per additional 300 sq ft or fraction

Added to every matching permit

  • Fire - Plan Check, new single family custom home: a fee table based on floor area (Residential · new construction)
  • Fire - Inspection, new single family custom home: a fee table based on floor area (Residential · new construction)
  • Fire - Plan Check, room addition first story: a flat $42.00 (Residential · additions)
  • Fire - Inspection, room addition first story: a fee table based on floor area (Residential · additions)
  • Fire - Plan Check, residential remodel: a flat $42.00 (Residential · remodels and alterations)
  • Fire - Inspection, residential remodel: a fee table based on floor area (Residential · remodels and alterations)

What counts as project value

Floor area (square feet). Building plan check and inspection fees are flat amounts by floor area of the work (per project type), not by valuation. The schedule does not state how valuation is determined for state fees.

Worked example: a $350,000 new home

  1. Building permit fee: table value for 2,400 sq ft: $2,286.00 = $2,286.00
  2. Plan review fee: table value for 2,400 sq ft: $1,967.00 = $1,967.00
  3. Fire - Plan Check, new single family custom home: table value for 2,400 sq ft: $343.00 = $343.00
  4. Fire - Inspection, new single family custom home: table value for 2,400 sq ft: $445.00 = $445.00
  5. Total before trade permits: $5,041.00.

Fees people miss

FeeAmount
New Single Family - Production (Tract), total citywide feeWhen: production (tract) home $2,483.00 up to 1,000 sf
Room Addition Multi Story, total citywide feeWhen: multi-story room addition $1,593.00 up to 300 sf
Supplemental Plan Check Fee (first 1/2 hour)When: additional plan review $108.00 first 1/2 hour
After Hours Inspection Fee (4 hours minimum)When: after-hours inspection requested $759.00 minimum
Development Impact Fees, MSHCP and school feesWhen: new construction varies

Trade permits are separate. Mechanical: Per-item MP&E fees; separate MP&E permits carry a $142 Permit Issuance/Administrative fee (simple project, includes 1 inspection) plus unit fees. Not fully extracted. Plumbing: Per-item fees (standard plumbing item $13, water heater $29). Not fully extracted. Electrical: Unit fees (first 10 outlets $43, each additional 10 $13). Not fully extracted.

How to apply

  1. Gather your plans and your project's total value and floor area.
  2. Submit to Community Development, Building & Safety.
  3. Pay the permit and plan review fees when invoiced.

How Temecula compares

A $25,000 remodel costs $390.00 in Temecula: about the same as the national median of $380.00, and the lowest of 43 places we cover in California (state median $1,263.01).

A $75,000 addition costs $1,508.00 in Temecula: 84% above the national median of $820.58, and the 6th lowest of 45 places we cover in California (state median $2,473.00).

A $350,000 new home costs $5,041.00 in Temecula: 73% above the national median of $2,918.63, and the 11th lowest of 47 places we cover in California (state median $6,927.50).

Same standard projects everywhere, including plan review and required surcharges. All California places · Compare side by side

Temecula permit fee FAQ

How much is a building permit in Temecula, CA?

A $25,000 remodel: $390.00. A $75,000 addition: $1,508.00. A $350,000 new single-family: $5,041.00. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Temecula permit fee?

No. Plan review is charged separately at its own fee table.

How does Temecula determine project value?

Floor area (square feet). Building plan check and inspection fees are flat amounts by floor area of the work (per project type), not by valuation. The schedule does not state how valuation is determined for state fees.

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Mechanical: Per-item MP&E fees; separate MP&E permits carry a $142 Permit Issuance/Administrative fee (simple project, includes 1 inspection) plus unit fees. Not fully extracted. Plumbing: Per-item fees (standard plumbing item $13, water heater $29). Not fully extracted. Electrical: Unit fees (first 10 outlets $43, each additional 10 $13). Not fully extracted.

When did these Temecula fees take effect?

The schedule does not state an effective date. We last checked it against the official source on Nov 5, 2026.