Building Permit Fees in Santa Clarita, CA (2026)

Santa Clarita prices building permits with a fee table based on project value, plus a $38.00 application fee, with a $95.00 minimum, then charges plan review at its own fee table. Enter your project to see the exact math.

  • Official city schedule
  • Effective Aug 24, 2026
  • Verified Nov 4, 2026
Minimum fee
$95.00
Plan review
Separate
$75k addition
$2,248

Permit fee calculator

Santa Clarita schedule, eff. Aug 24, 2026
Project type
Estimated permit fees $2,248.22
  1. 1. Building permit fee
    $874.20 for the first $50,000.00 + $11.94 × 25 per $1,000.00 over
    $1,172.70
  2. 2. Application fee
    fixed
    $38.00
  3. 3. Plan review fee
    $659.50 for the first $50,000.00 + $8.55 × 25 per $1,000.00 over
    $873.25
  4. 4. B&S plan check application process
    flat fee
    $47.00
  5. 5. Record maintenance
    10% of $1,172.70
    $117.27

May also apply (not in the total)

  • Expedited plan check
    When: optional expedited plan check
    $586.35

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$1,051.52
$513.20 building permit + $38.00 application + $402.00 plan review + $47.00 b&s plan check application process + $51.32 record maintenance
Room addition
$75,000 value, addition 400 sq ft
$2,248.22
$1,172.70 building permit + $38.00 application + $873.25 plan review + $47.00 b&s plan check application process + $117.27 record maintenance
New single-family home
$350,000 value, new single-family 2,400 sq ft
$7,085.07
$3,503.70 building permit + $38.00 application + $3,146.00 plan review + $47.00 b&s plan check application process + $350.37 record maintenance

How Santa Clarita calculates your permit fee

The city charges a building permit fee using a fee table based on project value, plus a $38.00 application fee, with a $95.00 minimum. Plan review is a separate charge: its own fee table. Electrical, plumbing and mechanical work gets its own permits.

The fee table

Project valueFee
$1 – $5,000$95.00
$5,001 – $25,000$95.00 for the first $5,000 + $20.91 per additional $1,000
$25,001 – $50,000$513.20 for the first $25,000 + $14.44 per additional $1,000
$50,001 – $100,000$874.20 for the first $50,000 + $11.94 per additional $1,000
$100,001 – $300,000$1,471.20 for the first $100,000 + $8.17 per additional $1,000
$300,001 – $1,000,000$3,105.20 for the first $300,000 + $7.97 per additional $1,000
$1,000,001 – $10,000,000$8,684.20 for the first $1,000,000 + $7.44 per additional $1,000
Over $10,000,000$75,654.20 for the first $10,000,000 + $7.12 per additional $1,000

Plus an application fee of $38.00.

Added to every matching permit

  • B&S plan check application process: a flat $47.00 (All projects)

Surcharges

  • Record maintenance: 10% of the permit fee

What counts as project value

Not stated in the schedule. Building permit and plan check fees are by valuation; the fee schedule does not say how valuation is determined.

Worked example: a $350,000 new home

  1. Building permit fee: $3,105.20 for the first $300,000.00 + $7.97 × 50 per $1,000.00 over = $3,503.70
  2. Application fee: fixed = $38.00
  3. Plan review fee: $2,721.00 for the first $300,000.00 + $8.50 × 50 per $1,000.00 over = $3,146.00
  4. B&S plan check application process: flat fee = $47.00
  5. Record maintenance: 10% of $3,503.70 = $350.37
  6. Total before trade permits: $7,085.07.

Fees people miss

May also apply (not in the totals above)

  • Expedited plan check: when optional expedited plan check; $256.60 on the standard projects.
FeeAmount
Miscellaneous/hourly plan checkWhen: miscellaneous plan check $250.00 processing fee plus hourly over 1 hour
Photovoltaic plan check, residential rooftopWhen: solar $175.00 each
Duplicate inspection card (after first)When: duplicate card $10.00 each
After hours inspectionWhen: after hours 2 or 4 hour minimum at 1.5x fully allocated overtime rate
Plan re-check after 3 checksWhen: re-check 15% of original fee per check

Trade permits are separate. Electrical: $38 permit issuance + $22 residential general inspection; new R-3 up to 2,500 sq ft $0.079/sq ft, above: $193 + $0.056 per sq ft over 2,500; itemised fees otherwise. Plumbing: $38 permit issuance + $22 residential general inspection; $18 per new fixture; water heater change-out $42; SFR repipe $129.

How to apply

  1. Gather your plans and your project's total value.
  2. Submit to Building & Safety, One-Stop Permit Center.
  3. Pay the permit and plan review fees when invoiced.
  4. Questions: City Hall Suite 140, 23920 Valencia Blvd, Santa Clarita, CA

How Santa Clarita compares

A $25,000 remodel costs $1,051.52 in Santa Clarita: about 2.8 times the national median of $380.00, and the 15th lowest of 43 places we cover in California (state median $1,263.01).

A $75,000 addition costs $2,248.22 in Santa Clarita: about 2.7 times the national median of $820.58, and the 21st lowest of 45 places we cover in California (state median $2,473.00).

A $350,000 new home costs $7,085.07 in Santa Clarita: about 2.4 times the national median of $2,918.63, and the 23rd highest of 47 places we cover in California (state median $6,927.50).

Same standard projects everywhere, including plan review and required surcharges. All California places · Compare side by side

Santa Clarita permit fee FAQ

How much is a building permit in Santa Clarita, CA?

A $25,000 remodel: $1,051.52. A $75,000 addition: $2,248.22. A $350,000 new single-family: $7,085.07. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Santa Clarita permit fee?

No. Plan review is charged separately at its own fee table.

How does Santa Clarita determine project value?

Not stated in the schedule. Building permit and plan check fees are by valuation; the fee schedule does not say how valuation is determined.

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Electrical: $38 permit issuance + $22 residential general inspection; new R-3 up to 2,500 sq ft $0.079/sq ft, above: $193 + $0.056 per sq ft over 2,500; itemised fees otherwise. Plumbing: $38 permit issuance + $22 residential general inspection; $18 per new fixture; water heater change-out $42; SFR repipe $129.

When did these Santa Clarita fees take effect?

The schedule is effective Aug 24, 2026 (“FY 2026/27 Building Permit Fee Table, EFFECTIVE DATE AUGUST 24, 2026”). We last checked it against the official source on Nov 4, 2026.