BuildingPermitCost

Building Permit Fees in Edmond, OK (2026)

Edmond prices building permits with $0.06 per square foot, then charges plan review at a flat $105.00. Enter your project to see the exact math.

  • Official city schedule
  • Effective Jul 1, 2026
  • Verified Nov 5, 2026
Minimum fee
—
Plan review
Separate
$75k addition
$133

Permit fee calculator

Edmond schedule, eff. Jul 1, 2026
Project type
Estimated permit fees $133.25
  1. 1. Building permit fee
    400 sq ft × $0.06
    $24.00
  2. 2. Plan review fee
    flat
    $105.00
  3. 3. State fees
    fixed
    $4.25

Fees are estimates based on the official schedule linked below. Confirm with the permit office before applying. Separate electrical, plumbing, mechanical, fire, impact, utility and school fees are usually not included unless they are listed. BuildingPermitCost is not a government permit office, and this is not legal advice.

What common projects cost

Kitchen or bath remodel
$25,000 value, remodel 300 sq ft
$127.25
$18.00 building permit + $105.00 plan review + $4.25 state fees
Room addition
$75,000 value, addition 400 sq ft
$133.25
$24.00 building permit + $105.00 plan review + $4.25 state fees
New single-family home
$350,000 value, new single-family 2,400 sq ft
$253.25
$144.00 building permit + $105.00 plan review + $4.25 state fees

How Edmond calculates your permit fee

The city charges a building permit fee using $0.06 per square foot. Plan review is a separate charge: a flat $105.00. Electrical, plumbing and mechanical work gets its own permits.

The fee table

Residential building inspection fees

$0.06 per square foot.

Commercial building inspection fees

$0.18 per square foot, plus a $100.00 application fee.

Surcharges

  • State fees: $4.25

What counts as project value

Floor area (square feet). Building inspection fees are per square foot, not valuation; the schedule does not define which floor area is measured.

Worked example: a $350,000 new home

  1. Building permit fee: 2,400 sq ft × $0.06 = $144.00
  2. Plan review fee: flat = $105.00
  3. State fees: fixed = $4.25
  4. Total before trade permits: $253.25.

Fees people miss

May also apply (not in the totals above)

  • Utility deposit: when the permit carries a utility deposit (listed for residential and commercial permits without stating which; non-refundable per the refund policy); $60.00 on the standard projects.
FeeAmount
Braced wall reviewWhen: braced wall review applies $75.00 each
Re-reviewWhen: plans resubmitted for re-review $0.06 per sq ft, min $50
Re-inspection, first occurrenceWhen: defective or incomplete work $50.00 each
Construction started without permitWhen: work started without a permit 3x cost of permit total
Water capacity fee, single-family 5/8 in. meterWhen: new connection to city water $1,106.00 each
Sewer capacity fee, single-family 5/8 in. meterWhen: new connection to city sewer $1,027.00 each
Water meter, 5/8 in. contractor installWhen: new water meter $450.00 each
Card processing fee (Paymentus)When: payment by credit/debit card 3.5%

Trade permits are separate. Electrical: New residential: base $90 + meter base (200 A single phase $100). State fee $4.25. Plumbing: New residential: $50 per bath group, $40 per additional bath group, gas opening $15 each. State fee $4.25. Mechanical: Forced air heating/cooling $35 per appliance; ductwork $0.03/sq ft min $30; residential mini split $60. State fee $4.25.

How to apply

  1. Gather your plans and your project's total value and floor area.
  2. Submit to Building & Fire Code Services.
  3. Pay the permit and plan review fees when invoiced.
  4. Questions: 405-359-4780

How Edmond compares

A $25,000 remodel costs $127.25 in Edmond: 67% below the national median of $380.00.

A $75,000 addition costs $133.25 in Edmond: 84% below the national median of $820.58.

A $350,000 new home costs $253.25 in Edmond: 91% below the national median of $2,918.63.

Same standard projects everywhere, including plan review and required surcharges. All Oklahoma places · Compare side by side

Edmond permit fee FAQ

How much is a building permit in Edmond, OK?

A $25,000 remodel: $127.25. A $75,000 addition: $133.25. A $350,000 new single-family: $253.25. These include every fee the schedule applies to that project; trade permits are separate.

Is plan review included in the Edmond permit fee?

No. Plan review is charged separately at a flat $105.00.

How does Edmond determine project value?

Floor area (square feet). Building inspection fees are per square foot, not valuation; the schedule does not define which floor area is measured.

Are electrical, plumbing and mechanical permits included?

No. They are separate permits. Electrical: New residential: base $90 + meter base (200 A single phase $100). State fee $4.25. Plumbing: New residential: $50 per bath group, $40 per additional bath group, gas opening $15 each. State fee $4.25. Mechanical: Forced air heating/cooling $35 per appliance; ductwork $0.03/sq ft min $30; residential mini split $60. State fee $4.25.

When did these Edmond fees take effect?

The schedule is effective Jul 1, 2026 (“Fees Effective 01 July 2026 (date from the city's document title; the PDF text carries no date)”). We last checked it against the official source on Nov 5, 2026.